2020 Integrated System Plan (ISP)

Page contents

Current Status

The 2020 ISP was released on 30 July 2020. A webinar will be held on 24 August 2020 to provide an overview of the ISP, and an opportunity to ask questions of the ISP team.  

Click here for details of the webinar.

2020 ISP

The 2020 ISP provides an actionable roadmap for eastern Australia’s power system. The ISP draws on extensive stakeholder engagement and internal and external industry and power system expertise to develop a blueprint that maximises consumer benefits through a transition period of great complexity and uncertainty.  

The ISP is a whole-of-system plan that efficiently achieves power system needs through that transformational period, in the long-term interests of the consumers of electricity. It serves the regulatory purpose of identifying actionable and future ISP projects, as well as the broader purposes of informing market participants, investors, policy decision makers and consumers. 

The ISP was released on 30 July 2020 and can be downloaded using the links below.


Draft 2020 ISP

Stakeholder Consultation

For the 2020 ISP, AEMO has consulted extensively with industry, academia, government, developers and consumer representatives. After two rounds of consultation, one before and one after the publication of the Draft 2020 ISP in December 2019, improvements have been made to the 2018 ISP. 

Consultation on non-network options

Central-West Orana REZ Transmission Link Non-Network Consultation  

AEMO has published a call for non-network options for the Central-West Orana REZ Transmission Link, as part of the 2020 ISP. This is required as Central-West Orana REZ Transmission Link has become actionable since the Draft ISP was released. The consultation runs until 22 October 2020, and details can be found here: 

2020 ISP timeline and opportunities for engagement

AEMO welcomes stakeholder participation and collaboration in the ISP process, and encourages attendance at the webinars and workshops. To register for invitations to upcoming ISP events, please email isp@aemo.com.au with your details including full name, organisation and email address. 

The 2020 ISP included a comprehensive stakeholder engagement program which involved over 200 stakeholders and multiple workshops, webinars and consultations. A webinar will be held to answer questions on the 2020 ISP – see details below. 

The ISP engagement timeline following the consultation on scenarios, inputs and assumptions is summarised below:

 Event  Date  Status  Related content

Renewable Energy Zones (REZ) briefing

13 August 2019

Complete

2019 ISP webinar: Renewable Energy Zones briefing

REZ webinar slides

Preliminary modelling outcomes workshop

10 October 2019

Complete

ISP Preliminary outcomes presentation - 10 Oct 2019 (5.63 MB, pdf)

ISP workshop synopsis - 10 Oct 2019 (626 KB, pdf)

Publish Draft ISP

12 December 2019

Complete

2020 Draft ISP (3.75 MB)

2020 Draft ISP appendices (14.7 MB)

Consultation workshops on Draft ISP

Brisbane  3 February 2020

Sydney  4 February 2020

Melbourne 5 February 2020

Complete

Draft 2020 ISP workshops slides 3-5 Feb 2020

Q&A Stations

Please note that due to the large graphics in these files, they are best viewed by downloading and opening in Adobe reader.

Draft 2020 ISP February 2020 workshops summary

Draft 2020 ISP Webinar

 

11 February 2020

Complete

Draft 2020 ISP webinar slides 11 Feb 2020

Draft 2020 ISP webinar summary  Feb 2020

Formal consultation on Draft ISP

12 December 2019 to 21 February 2020

Closed

Draft 2020 ISP consultation  web page

Formal consultation on Draft ISP QNI Medium and VNI West non-network options

12 December 2019 to 13 March 2020

Closed

Consultation  on non-network options

ISP Consumer panel framing

Jun - Aug 2020

Upcoming

 

ISP Consumer panel collaboration

September 2020 onwards

Upcoming

 

Publish 2020 ISP

Mid 2020

Complete

 

2020 ISP Webinar

24 Aug 2020

Upcoming

 

Scenarios, inputs, assumptions and methodologies for the 2020 ISP

2020 ISP Database

Specific assumptions, methods and supporting materials are added to the ISP Database: