Market Notices

57229SETTLEMENTS RESIDUE05/02/2017 10:45:18 PM

[EventId:201702052245_NRM_QLD1_NSW1_stopped] NEGRES CONSTRAINT NRM_QLD1_NSW1 ceased operating from 05 February 2017 22:45

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 2245 hrs on 5 February 2017

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - QLD to NSW - 5 February 2017.

Refer to market notice: 57228

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the QLD to NSW directional interconnector.

The negative residue constraint NRM_QLD1_NSW1 ceased operating at 2245 hrs on 5 February 2017.

This is an AEMO autogenerated Market Notice.
57228SETTLEMENTS RESIDUE05/02/2017 10:00:18 PM

[EventId:201702052200_NRM_QLD1_NSW1_started] NEGRES CONSTRAINT NRM_QLD1_NSW1 started operating from 05 February 2017 22:00

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 2200 hrs on 5 February 2017

ACTUAL NEGATIVE SETTLEMENT RESIDUES - QLD to NSW - 5 February 2017.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the QLD to NSW directional interconnector.

The negative residue constraint set NRM_QLD1_NSW1 commenced operating from 2200 hrs on 5 February 2017.

This constraint set contains an equation with the following interconnectors on the LHS:
N-Q-MNSP1
NSW1-QLD1

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
57227SETTLEMENTS RESIDUE05/02/2017 09:30:19 PM

[EventId:201702052130_NRM_VIC1_SA1_stopped] NEGRES CONSTRAINT NRM_VIC1_SA1 ceased operating from 05 February 2017 21:30

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 2130 hrs on 5 February 2017

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 5 February 2017.

Refer to market notice: 57226

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the VIC to SA directional interconnector.

The negative residue constraint NRM_VIC1_SA1 ceased operating at 2130 hrs on 5 February 2017.

This is an AEMO autogenerated Market Notice.
57226SETTLEMENTS RESIDUE05/02/2017 08:35:15 PM

[EventId:201702052035_NRM_VIC1_SA1_started] NEGRES CONSTRAINT NRM_VIC1_SA1 started operating from 05 February 2017 20:35

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 2035 hrs on 5 February 2017

ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 5 February 2017.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the VIC to SA directional interconnector.

The negative residue constraint set NRM_VIC1_SA1 commenced operating from 2035 hrs on 5 February 2017.

This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
57225SETTLEMENTS RESIDUE05/02/2017 07:25:19 PM

[EventId:201702051925_NRM_QLD1_NSW1_stopped] NEGRES CONSTRAINT NRM_QLD1_NSW1 ceased operating from 05 February 2017 19:25

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1925 hrs on 5 February 2017

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - QLD to NSW - 5 February 2017.

Refer to market notice: 57224

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the QLD to NSW directional interconnector.

The negative residue constraint NRM_QLD1_NSW1 ceased operating at 1925 hrs on 5 February 2017.

This is an AEMO autogenerated Market Notice.
57224SETTLEMENTS RESIDUE05/02/2017 07:00:18 PM

[EventId:201702051900_NRM_QLD1_NSW1_started] NEGRES CONSTRAINT NRM_QLD1_NSW1 started operating from 05 February 2017 19:00

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1900 hrs on 5 February 2017

ACTUAL NEGATIVE SETTLEMENT RESIDUES - QLD to NSW - 5 February 2017.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the QLD to NSW directional interconnector.

The negative residue constraint set NRM_QLD1_NSW1 commenced operating from 1900 hrs on 5 February 2017.

This constraint set contains an equation with the following interconnectors on the LHS:
N-Q-MNSP1
NSW1-QLD1

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
57223NON-CONFORMANCE05/02/2017 06:00:13 PM

NON-CONFORMANCE Region QLD1 Sunday, 5 February 2017

AEMO ELECTRICITY MARKET NOTICE

NON-CONFORMANCE QLD1 Region Sunday, 5 February 2017

AEMO declared a schedule generating unit non-conforming

Unit: BRAEMAR2
Duration: 05/02/2017 17:25 to 05/02/2017 18:00
Amount: -10 MW
Constraint: NC-Q_BRAEMAR2

Auto-generated on behalf of Manager NEM Real Time Operations
57222RESERVE NOTICE05/02/2017 04:11:27 PM

Forecast Lack Of Reserve Level 1 (LOR1) in the New South Wales Region - PDPASA

AEMO ELECTRICITY MARKET NOTICE

Forecast Lack Of Reserve Level 1 (LOR1) in the New South Wales Region - PDPASA
AEMO declares a Forecast LOR1 condition for the New South Wales Region.
From 1430 hrs to 1600 hrs 06/02/17
The contingency capacity reserve required is 1400 MW
The minimum reserve available is 1380 MW

Manager NEM Real Time Operations
57221PRICES UNCHANGED05/02/2017 04:04:59 PM

[EventId:201702051605_confirmed] Prices for interval 05-Feb-2017 16:05 are now confirmed

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1604 hrs on 5 February 2017

PRICES ARE NOW CONFIRMED for dispatch interval 05-Feb-2017 16:05.

In accordance with Market Notice 57220 AEMO has reviewed this dispatch interval and determined that:
- Manifestly Incorrect Inputs did not apply

Prices remain unchanged.


This is an AEMO autogenerated Market Notice.