Market Notices

99816SETTLEMENTS RESIDUE02/07/2022 06:00:21 PM

[EventId:202207021800_NRM_QLD1_NSW1_stopped] NEGRES CONSTRAINT NRM_QLD1_NSW1 ceased operating from 02 July 2022 18:00

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1800 hrs on 2 July 2022

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - QLD to NSW - 2 July 2022.

Refer to market notice: 99815

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the QLD to NSW directional interconnector.

The negative residue constraint NRM_QLD1_NSW1 ceased operating at 1800 hrs on 2 July 2022.

This is an AEMO autogenerated Market Notice.
     
99815SETTLEMENTS RESIDUE02/07/2022 05:40:26 PM

[EventId:202207021740_NRM_QLD1_NSW1_started] NEGRES CONSTRAINT NRM_QLD1_NSW1 started operating from 02 July 2022 17:40

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1740 hrs on 2 July 2022

ACTUAL NEGATIVE SETTLEMENT RESIDUES - QLD to NSW - 2 July 2022.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the QLD to NSW directional interconnector.

The negative residue constraint set NRM_QLD1_NSW1 commenced operating from 1740 hrs on 2 July 2022.

This constraint set contains an equation with the following interconnectors on the LHS:
N-Q-MNSP1
NSW1-QLD1

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
     
99814SETTLEMENTS RESIDUE02/07/2022 05:25:16 PM

[EventId:202207021725_NRM_QLD1_NSW1_stopped] NEGRES CONSTRAINT NRM_QLD1_NSW1 ceased operating from 02 July 2022 17:25

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1725 hrs on 2 July 2022

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - QLD to NSW - 2 July 2022.

Refer to market notice: 99813

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the QLD to NSW directional interconnector.

The negative residue constraint NRM_QLD1_NSW1 ceased operating at 1725 hrs on 2 July 2022.

This is an AEMO autogenerated Market Notice.
     
99813SETTLEMENTS RESIDUE02/07/2022 05:00:28 PM

[EventId:202207021700_NRM_QLD1_NSW1_started] NEGRES CONSTRAINT NRM_QLD1_NSW1 started operating from 02 July 2022 17:00

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1700 hrs on 2 July 2022

ACTUAL NEGATIVE SETTLEMENT RESIDUES - QLD to NSW - 2 July 2022.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the QLD to NSW directional interconnector.

The negative residue constraint set NRM_QLD1_NSW1 commenced operating from 1700 hrs on 2 July 2022.

This constraint set contains an equation with the following interconnectors on the LHS:
N-Q-MNSP1
NSW1-QLD1

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
     
99812RESERVE NOTICE02/07/2022 03:17:07 PM

Update - STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the TAS Region on 05/07/2022

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the TAS region advised in AEMO Electricity Market Notice No.99788 has been updated at 1400 hrs 02/07/2022 to the following::

From 0800 hrs 05/07/2022 to 1000 hrs 05/07/2022.
The forecast capacity reserve requirement is 352 MW.
The minimum capacity reserve available is 260 MW.

AEMO Operations
     
99811RESERVE NOTICE02/07/2022 03:08:21 PM

STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 05/07/2022

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following period:

[1.] From 1730 hrs 05/07/2022 to 1900 hrs 05/07/2022.
The forecast capacity reserve requirement is 914 MW.
The minimum capacity reserve available is 758 MW.


Manager NEM Real Time Operations

     
99810RESERVE NOTICE02/07/2022 02:58:20 PM

STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 09/07/2022

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following periods:


1. From 1800 hrs 09/07/2022 to 2100 hrs 09/07/2022. The forecast capacity reserve requirement is 450 MW. The minimum capacity reserve available is 323 MW.

Manager NEM Real Time Operations
     
99809RESERVE NOTICE02/07/2022 02:57:04 PM

STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 08/07/2022

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following periods:


1. From 0800 hrs 08/07/2022 to 0830 hrs 08/07/2022.
The forecast capacity reserve requirement is 450 MW.
The minimum capacity reserve available is 434 MW.

2. From 1800 hrs 08/07/2022 to 2100 hrs 08/07/2022.
The forecast capacity reserve requirement is 450 MW.
The minimum capacity reserve available is 324 MW.

Manager NEM Real Time Operations
     
99808RESERVE NOTICE02/07/2022 02:52:58 PM

STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 07/07/2022

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the SA region advised in AEMO Electricity Market Notice No.99794 has been updated at 1400 hrs 02/07/2022 to the following::

1. From 0800 hrs 07/07/2022 to 0900 hrs 07/07/2022.
The forecast capacity reserve requirement is 450 MW.
The minimum capacity reserve available is 363 MW.

2. From 1800 hrs 07/07/2022 to 1830 hrs 07/07/2022.
The forecast capacity reserve requirement is 450 MW.
The minimum capacity reserve available is 289 MW.

3. From 1900 hrs 07/07/2022 to 2130 hrs 07/07/2022.
The forecast capacity reserve requirement is 450 MW.
The minimum capacity reserve available is 252 MW.

Manager NEM Real Time Operations
     