Market Notices

61130RESERVE NOTICE07/02/2018 07:36:57 AM

PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the VIC Region on Wednesday, 7 February 2018

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the VIC region advised in AEMO Electricity Market Notice No. 61128 has been updated at 0730 hrs 7/02/2018 to the following:

From 1630 hrs 7/02/2018 to 1800 hrs on 7/02/2018.
The contingency capacity reserve required is 1120 MW.
The minimum reserve available is 862 MW.

Manager NEM Real Time Operations


61129RESERVE NOTICE06/02/2018 03:15:21 PM

RESERVE NOTICE MT PASA PUBLICATION 6 February 2018

AEMO ELECTRICITY MARKET NOTICE

The MTPASA result published on 6 February 2018 shows Low Reserve Conditions (LRC) in South Australia and Victoria for summer 2017-18, 2018-19 and 2019-20. Please note that MTPASA informs the market of potential LRC's to allow the market to respond in the first instance, potentially avoiding the need for any market intervention or direction from AEMO. As such, the MTPASA forecast does not incorporate many of the actions taken by AEMO to improve reliability this summer.

This notice supersedes Market Notice 61035 published on 30 January 2018.

Background
As part of a broader process of implementing the reliability standard, AEMO runs the Medium Term Projected Assessment of System Adequacy (MTPASA) process weekly to forecast capacity reserve conditions over a two year period.
AEMO may apply probabilistic studies such as Energy Adequacy Assessment Projection (EAAP) to confirm the LRC findings of MTPASA before intervening in the market.

For more information about how AEMO implements the reliability standard, please view the Reliability Standard Implementation Guidelines (RSIG) available on AEMO's website at
http://www.aemo.com.au/-/media/Files/Stakeholder_Consultation/Consultations/Electricity_Consultations/2016/EAAP/Reliability-Standard-Implementation-Guidelines.pdf

Supply Forecasting
AEMO
61128RESERVE NOTICE06/02/2018 12:59:05 PM

PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the Vic Region on 07/02/2018

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the Vic region for the following periods:

From 1630 hrs to 1730 hrs on 07/02/2018.
The contingency capacity reserve required is 1120 MW.
The minimum reserve available is 931 MW.

Manager NEM Real Time Operations






61127GENERAL NOTICE06/02/2018 11:29:53 AM

Market reporting for forecast extreme temperature in the South Australia region beginning on 07/02/2018

AEMO ELECTRICITY MARKET NOTICE

AEMO's weather service provider has issued forecast temperatures for SA region that are close to the Generation Capacity Reference Temperatures:

From 07/02/2018 to 09/02/2018: Maximum forecast temperature 40?C at Adelaide for the Adelaide area

Further updates to this advice may not be provided.

AEMO requests participants to:

1. review the weather forecast in the local area where their generating plants are located and,

2. if required, update their offered capacities consistent with the forecast temperatures.

Details on Generation Capacity Reference Temperatures can be accessed using the following link to AEMO website:
http://www.aemo.com.au/Electricity/Planning/Related-Information/Generation-Information

Generation Capacity Reference Temperatures:

QUEENSLAND - BRISBANE AREA 37 ?C.
NEW SOUTH WALES - SYDNEY AREA 42?C.
VICTORIA - MELBOURNE AREA 41?C.
SOUTH AUSTRALIA - ADELAIDE AREA 43?C.
TASMANIA - GEORGE TOWN 30?C.
BASSLINK- (Latrobe Valley Airport 43?C AND GEORGE TOWN 33?C)

Hitesh Bavarva
AEMO Operations
61126RESERVE NOTICE06/02/2018 11:24:25 AM

STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the Victoria Region on 07/02/2018

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the VIC region for the following period:

From 1630 hrs to 1730 hrs on 07/02/2018.
The contingency capacity reserve required is 1120 MW.
The minimum reserve available is 932 MW.

Bhishma Chhetri
AEMO Operations
61125RECLASSIFY CONTINGENCY05/02/2018 08:57:05 PM

Cancellation of a Non-Credible Contingency Event: Norwood - Scottsdale - Derby line and Norwood - Scottsdale line in TAS1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.

Region: TAS1

Lines: Norwood - Scottsdale - Derby and Norwood - Scottsdale

Cancellation time: 05/02/2018 20:57

Constraint set(s) revoked:
NONE

Refer AEMO Electricity Market Notice 61124

Auto-generated on behalf of Manager NEM Real Time Operations
61124RECLASSIFY CONTINGENCY05/02/2018 06:38:12 PM

Reclassification of a Non-Credible Contingency Event: Norwood - Scottsdale - Derby line and Norwood - Scottsdale line in TAS1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.

Region: TAS1

Lines: Norwood - Scottsdale - Derby and Norwood - Scottsdale

Duration: 05/02/2018 18:38 until further notice

Constraint set(s) invoked:
NONE

Auto-generated on behalf of Manager NEM Real Time Operations
61123INTER-REGIONAL TRANSFER05/02/2018 04:05:34 PM

Update - Inter regional transfer limit variation Victoria Region- 05/02/2018

AEMO ELECTRICITY MARKET NOTICE

Update Inter regional transfer limit variation Victoria Region- 05/02/2018

Refer Market Notice 61122

The Moorabool - Sydenham No. 2 500kV line and the Sydenham - South Morang No. 2 500kV line in the Victoria region have been returned to service.

The following constraint sets were revoked at 1555 hrs.

V-SMSY
V-MLSY_NOEMTT_R

The Sydenham Moorabool 2 line and South Morang 2 line circuit breaker remains out of service.

The following constraint set was invoked at 1555hrs:

V-SY_CB

The outage constraints contain the following interconnectors on the LHS

V-S-MNSP1
VIC1-NSW1
T-V-MNSP1
V-SA

Refer to AEMO Network Outage Scheduler (NOS) for further details.

Manager NEM Real Time Operations
61122INTER-REGIONAL TRANSFER05/02/2018 03:34:12 PM

Inter regional transfer limit variation Victoria Region- 05/02/2018

AEMO ELECTRICITY MARKET NOTICE

Inter regional transfer limit variation Victoria Region- 05/02/2018

A short notice outage of the Moorabool - Sydenham No. 2 500kV line and the Sydenham - South Morang No. 2 500kV line in the Victoria region has commenced at 1529 hrs.

The outage is estimated to be completed by 1615 hrs .

The following constraints are invoked for this outage

V-SMSY
V-MLSY_NOEMTT_R

The outage constraints contain the following interconnectors on the LHS

V-S-MNSP1
VIC1-NSW1
T-V-MNSP1
V-SA

Refer to AEMO Network Outage Scheduler (NOS) for further details.

Manager NEM Real Time Operations