[EventId:202205140530_NRM_SA1_VIC1_stopped] NEGRES CONSTRAINT NRM_SA1_VIC1 ceased operating from 14 May 2022 05:30
Issued by Australian Energy Market Operator Ltd at 0530 hrs on 14 May 2022
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - SA to VIC - 14 May 2022.
Refer to market notice: 96315
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the SA to VIC directional interconnector.
The negative residue constraint NRM_SA1_VIC1 ceased operating at 0530 hrs on 14 May 2022.
This is an AEMO autogenerated Market Notice.
[EventId:202205140430_NRM_SA1_VIC1_started] NEGRES CONSTRAINT NRM_SA1_VIC1 started operating from 14 May 2022 04:30
Issued by Australian Energy Market Operator Ltd at 0430 hrs on 14 May 2022
ACTUAL NEGATIVE SETTLEMENT RESIDUES - SA to VIC - 14 May 2022.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the SA to VIC directional interconnector.
The negative residue constraint set NRM_SA1_VIC1 commenced operating from 0430 hrs on 14 May 2022.
This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
NON-CONFORMANCE Region SA1 Saturday, 14 May 2022
NON-CONFORMANCE SA1 Region Saturday, 14 May 2022
AEMO declared a schedule generating unit non-conforming
Unit: MTMILLAR
Duration: 14/05/2022 00:45 to 14/05/2022 01:50
Amount: 17 MW
Constraint: NC-S_MTMILLAR
Auto-generated on behalf of Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 16/05/2022
The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice No. 96310 has been updated at 2100 hrs 13/05/2022 to the following:
[1.] From 1700 hrs 16/05/2022 to 1900 hrs 16/05/2022.
The forecast capacity reserve requirement is 677 MW.
The minimum capacity reserve available is 561 MW..
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
NON-CONFORMANCE Region QLD1 Friday, 13 May 2022
NON-CONFORMANCE QLD1 Region Friday, 13 May 2022
AEMO declared a schedule generating unit non-conforming
Unit: CPP_3
Duration: 13/05/2022 19:00 to 13/05/2022 19:15
Amount: 39 MW
Constraint: NC-Q_CPP_3
Auto-generated on behalf of Manager NEM Real Time Operations
STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 16/05/2022
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following period:
[1.] From 1630 hrs 16/05/2022 to 1700 hrs 16/05/2022.
The forecast capacity reserve requirement is 774 MW.
The minimum capacity reserve available is 767 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
Direction - SA Region - 13/05/2022
Direction - SA Region - 13/05/2022
In accordance with section 116 of the National Electricity Law, AEMO has issued a direction to a participant in the SA region. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a).
The direction was necessary to maintain the power system in a secure operating state.
AEMO may issue or revoke additional directions in order to meet the current requirement, unless sufficient market response is provided. A further market notice will be issued when all directions related to this requirement have been cancelled.
The issue of the direction commences an AEMO intervention event. AEMO declares all trading intervals during the event to be intervention trading intervals, commencing from the interval ending 1705 hrs on 13/05/2022.
Intervention pricing does not apply to this AEMO intervention event.
Manager NEM Real Time Operations
Planned outage of Heywood - Mortlake PS 500kV Line in the VIC region on 14/05/2022
The Heywood - Mortlake PS 500kV Line in the Victoria (VIC) region is planned to be out of service as follows:
From 0800 hrs to 1500 hrs on 14/05/2022.
A credible contingency event during this planned outage could cause synchronous separation of the South Australia (SA) region from the rest of the NEM.
During this planned outage:
- Power transfer will be restricted across the VIC - SA interconnector (Heywood interconnector).
- Post contingent FCAS will be sourced within SA following Separation event.
The following constraints are invoked:
V-HYMO
I-VS_050
S-X_BC_CP
Refer AEMO Network Outage Schedule (NOS) for further details.
Manager NEM Real Time Operations
Update: Possible intervention to manage power system security in South Australia (SA) Region
Update: Possible intervention to manage power system security in South Australia (SA) Region
Refer AEMO Electricity Market Notice 96296
The synchronous generating units currently expected to be synchronised in SA from 0000 hrs 14/05/2022 will be inadequate to maintain a secure operating state in SA.
AEMO estimates that, in the absence of sufficient market response by 1700 hrs 13/05/2022, AEMO may need to intervene by issuing a direction requiring one or more SA synchronous generating unit(s) to operate or remain synchronised to maintain power system security in SA.
Manager NEM Real Time Operations