100660RESERVE NOTICE01/08/2022 04:32:03 PM

PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 01/08/2022

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following periods:

From 1730 hrs 01/08/2022 to 2000 hrs 01/08/2022.
The forecast capacity reserve requirement is 698 MW.
The minimum capacity reserve available is 652 MW.

Manager NEM Real Time Operations
     
100659RECLASSIFY CONTINGENCY01/08/2022 03:45:18 PM

Reclassification of a Non-Credible Contingency Event: Farrell - Reece No.1 220 kV line and Farrell - Reece No.2 220 kV line in TAS1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.

Region: TAS1

Lines: Farrell - Reece No.1 220 kV and Farrell - Reece No.2 220 kV

Duration: 01/08/2022 15:45 until further notice

Constraint set(s) invoked:
F-T-FARE_N-2 Constraint set contains the following interconnector(s) on the left hand side:
T-V-MNSP1


Auto-generated on behalf of Manager NEM Real Time Operations
     
100658RECLASSIFY CONTINGENCY01/08/2022 03:45:16 PM

Reclassification of a Non-Credible Contingency Event: Farrell-Sheffield No.1 220 kV line and Farrell-Sheffield No.2 220 kV line in TAS1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.

Region: TAS1

Lines: Farrell-Sheffield No.1 220 kV and Farrell-Sheffield No.2 220 kV

Duration: 01/08/2022 15:45 until further notice

Constraint set(s) invoked:
F-T-FASH_N-2 Constraint set contains the following interconnector(s) on the left hand side:
T-V-MNSP1
T-FASH_N-2_CP4_SA Constraint set contains the following interconnector(s) on the left hand side:
NONE
T-NIL_WCP_CLOSE Constraint set contains the following interconnector(s) on the left hand side:
NONE


Auto-generated on behalf of Manager NEM Real Time Operations
     
100657MARKET INTERVENTION01/08/2022 03:01:32 PM

Direction - SA region 01/08/2022

AEMO ELECTRICITY MARKET NOTICE.

Direction - SA region 01/08/2022

In accordance with section 116 of the National Electricity Law, AEMO has issued a direction to a participant in the SA region. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a).

The direction was necessary to maintain the power system in a secure operating state.

AEMO may issue or revoke additional directions in order to meet the current requirement, unless sufficient market response is provided. A further market notice will be issued when all directions related to this requirement have been cancelled.

The issue of the direction commences an AEMO intervention event. AEMO declares all trading intervals during the event to be intervention trading intervals, commencing from the interval ending 1505 on 01/08/2022.

Intervention pricing does not apply to this AEMO intervention event.

Manager NEM Real Time Operations
     
100656MARKET INTERVENTION01/08/2022 02:51:25 PM

Update - Possible intervention to manage power system security in South Australia (SA) Region

AEMO ELECTRICITY MARKET NOTICE

Update - Possible intervention to manage power system security in South Australia (SA) Region

Refer AEMO Electricity Market Notice 100636

The synchronous generating units currently expected to be synchronised in SA from 2200 hrs 01/08/2022 will be inadequate to maintain a secure operating state in SA.

AEMO estimates that, in the absence of sufficient market response by 1500 hrs 01/08/2022, AEMO may need to intervene by issuing a direction requiring one or more SA synchronous generating unit(s) to operate or remain synchronised to maintain power system security in SA.

Manager NEM Real Time Operation
     
100653RESERVE NOTICE01/08/2022 03:05:45 PM

STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 04/08/2022

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice No. 100646 is cancelled at 1400 hrs 01/08/2022.

No LOR2 condition is currently forecast in the QLD region in the STPASA period.

AEMO Operations
     
100652MARKET INTERVENTION01/08/2022 03:32:55 PM

Cancellation - AEMO Intervention Event - Intervention trading intervals - Direction SA Region - 29/07/2022

AEMO ELECTRICITY MARKET NOTICE

Cancellation - AEMO Intervention Event - Intervention trading intervals - Direction SA Region - 29/07/2022

Refer Market Notice 100599

The AEMO Intervention Event and all associated directions are cancelled from 1530 hrs 01/08/2022

Manager NEM Real Time Operations
     
100651RESERVE NOTICE01/08/2022 03:04:34 PM

STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 03/08/2022

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice No. 100645 is cancelled at 1400 hrs 01/08/2022.

No LOR2 condition is currently forecast in the QLD region in the STPASA period.

AEMO Operations
     
100649RECLASSIFY CONTINGENCY02/08/2022 08:05:27 AM

Reclassification of a Non-Credible Contingency Event: Armidale No. 1 330 kV SVC and Sapphire Wind Farm in NSW1

AEMO ELECTRICITY MARKET NOTICE

Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly, AEMO has reclassified it as a credible contingency event.

Region: NSW1

Equipment: Armidale No. 1 330 kV SVC and Sapphire Wind Farm

Duration: 02/08/2022 08:00 until further notice

Constraint set(s) invoked: NONE

Manager NEM Real Time Operations
     