Stage 4 - Contracts
Related guides and policies
-
27/06/2023
Template PCCD (with Side Deed)
1.36 MB -
18/07/2024
Template UoSA (BESS)
435.29 KB -
27/06/2023
Template UoSA (Solar or Wind Farm)
397.09 KB -
23/12/2011
Contract Principles: Generation Connections To The Victorian Declared Shared Network
404.96 KB -
29/06/2016
New Generator Transmission Connections in Victoria - Asset Classification
0174-0010
47.75 KB -
17/06/2010
Connecting Generator Clusters To The Victorian Electricity Transmission Network: A Technical Perspective
823.77 KB -
29/06/2016
Indicative Transmission Augmentation Costs In Victoria
314.43 KB -
29/06/2016
Cost allocation policy negotiated transmission services
354.14 KB -
29/06/2016
Cost allocation policy prescribed transmission services
296.36 KB -
29/06/2016
Application of RITT To Multi-Connection Terminal Stations Victoria
128.55 KB -
29/06/2016
Criteria for Assessing Material Inter-Network Impact of Transmission Augmentations
179.35 KB -
29/06/2018
Transmission Generation Alterations in Victoria
144.22 KB -
29/05/2018
Victorian Negotiating Framework 1 April 2017 – 31 March 2022
638.51 KB