66850NON-CONFORMANCE26/01/2019 08:45:13 PM

NON-CONFORMANCE Region QLD1 Saturday, 26 January 2019

AEMO ELECTRICITY MARKET NOTICE

NON-CONFORMANCE QLD1 Region Saturday, 26 January 2019

AEMO declared a schedule generating unit non-conforming

Unit: BRAEMAR2
Duration: 26/01/2019 20:35 to 26/01/2019 20:45
Amount: -83 MW
Constraint: NC-Q_BRAEMAR2

Auto-generated on behalf of Manager NEM Real Time Operations
66849RECLASSIFY CONTINGENCY26/01/2019 07:29:49 PM

Cancellation of a Non-Credible Contingency Event: Bulli Creek - Dumaresq 8L 330KV line and Bulli Creek - Dumaresq 8M 330KV line in QLD1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.

Region: QLD1

Lines: Bulli Creek - Dumaresq 8L 330KV and Bulli Creek - Dumaresq 8M 330KV

Cancellation time: 26/01/2019 19:29

Constraint set(s) revoked:
I-QNI_ONE_PHASE_N-2 Constraint set contains the following interconnector(s) on the left hand side:
NSW1-QLD1


Refer AEMO Electricity Market Notice 66848

Auto-generated on behalf of Manager NEM Real Time Operations
66848RECLASSIFY CONTINGENCY26/01/2019 04:28:25 PM

Reclassification of a Non-Credible Contingency Event: Bulli Creek - Dumaresq 8L 330KV line and Bulli Creek - Dumaresq 8M 330KV line in QLD1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.

Region: QLD1

Lines: Bulli Creek - Dumaresq 8L 330KV and Bulli Creek - Dumaresq 8M 330KV

Duration: 26/01/2019 16:28 until further notice

Constraint set(s) invoked:
I-QNI_ONE_PHASE_N-2 Constraint set contains the following interconnector(s) on the left hand side:
NSW1-QLD1


Auto-generated on behalf of Manager NEM Real Time Operations
66847ADMINISTERED PRICE CAP26/01/2019 03:56:08 AM

[EventId:119] AP STARTED for Energy in VIC at 26 January 2019 04:00

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 0355 hrs on 26 January 2019

ADMINISTERED PRICE PERIOD DECLARED in VIC region.

AEMO has determined that the rolling sum of the uncapped dispatch prices for the VIC region over the previous 336 trading intervals has exceeded the cumulative price threshold (CPT) of $216,900.00.

In accordance with Clause 3.14 of the National Electricity Rules, AEMO has determined that an administered price period will commence at the trading interval starting 0400 hrs on 26 Jan 2019 and will continue through to the end of that trading day.

An administered price cap (APC) of 300 $/MWh will apply to all trading intervals during this administered price period. This APC will apply to dispatch prices and to all market ancillary service prices in the VIC region.

An administered floor price (AFP) of -300 $/MWh will apply to dispatch prices. A 0 $/MWh AFP will apply to all market ancillary service prices.

AEMO will continue to monitor the rolling sum of the uncapped dispatch prices and issue further market notices as required.


This is an AEMO autogenerated Market Notice.
66846ADMINISTERED PRICE CAP26/01/2019 03:56:23 AM

[EventId:118] AP STARTED for Energy in SA at 26 January 2019 04:00

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 0355 hrs on 26 January 2019

ADMINISTERED PRICE PERIOD DECLARED in SA region.

AEMO has determined that the rolling sum of the uncapped dispatch prices for the SA region over the previous 336 trading intervals has exceeded the cumulative price threshold (CPT) of $216,900.00.

In accordance with Clause 3.14 of the National Electricity Rules, AEMO has determined that an administered price period will commence at the trading interval starting 0400 hrs on 26 Jan 2019 and will continue through to the end of that trading day.

An administered price cap (APC) of 300 $/MWh will apply to all trading intervals during this administered price period. This APC will apply to dispatch prices and to all market ancillary service prices in the SA region.

An administered floor price (AFP) of -300 $/MWh will apply to dispatch prices. A 0 $/MWh AFP will apply to all market ancillary service prices.

AEMO will continue to monitor the rolling sum of the uncapped dispatch prices and issue further market notices as required.


This is an AEMO autogenerated Market Notice.
66845ADMINISTERED PRICE CAP26/01/2019 03:55:43 AM

[EventId:117] AP ENDED for Energy in VIC at 26 January 2019 04:00

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 0355 hrs on 26 January 2019

ADMINISTERED PRICE PERIOD ENDS in VIC region.

In accordance with Clause 3.14.2 (b) of the National Electricity Rules, AEMO is notifying market particpants that the administered price period declared for the VIC region in market notice 66779 will end at 0400 hrs on 26 January 2019.


This is an AEMO autogenerated Market Notice.
66844ADMINISTERED PRICE CAP26/01/2019 03:55:06 AM

[EventId:116] AP ENDED for Energy in SA at 26 January 2019 04:00

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 0355 hrs on 26 January 2019

ADMINISTERED PRICE PERIOD ENDS in SA region.

In accordance with Clause 3.14.2 (b) of the National Electricity Rules, AEMO is notifying market particpants that the administered price period declared for the SA region in market notice 66780 will end at 0400 hrs on 26 January 2019.


This is an AEMO autogenerated Market Notice.
66843NON-CONFORMANCE25/01/2019 11:05:09 PM

NON-CONFORMANCE Region QLD1 Friday, 25 January 2019

AEMO ELECTRICITY MARKET NOTICE

NON-CONFORMANCE QLD1 Region Friday, 25 January 2019

AEMO declared a schedule generating unit non-conforming

Unit: DDPS1
Duration: 25/01/2019 23:00 to 25/01/2019 23:05
Amount: 21 MW
Constraint: NC-Q_DDPS1

Auto-generated on behalf of Manager NEM Real Time Operations
66842RECLASSIFY CONTINGENCY25/01/2019 10:54:45 PM

Cancellation of a Non-Credible Contingency Event: Hazelwood - Rowville No.1 220kV line and Hazelwood - Rowville No.2 220kV line in VIC1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.

Region: VIC1

Lines: Hazelwood - Rowville No.1 220kV and Hazelwood - Rowville No.2 220kV

Cancellation time: 25/01/2019 22:54

Constraint set(s) revoked:
V-HWRO_R_N-2 Constraint set contains the following interconnector(s) on the left hand side:
NONE


Refer AEMO Electricity Market Notice 66839

Auto-generated on behalf of Manager NEM Real Time Operations