71140MARKET SYSTEMS13/11/2019 03:42:17 PM

Change Number: CHG0056687 : Maintenance activity on Gas Supply Hub Production System.

Change Number: CHG0056687

Notification issued to: Market Notice

Notification Type: Initial

Change Type: Normal

Service/ Component: Gas Supply Hub

Change Title: Planned System Outage - Gas Supply Hub

Change Start Date & Time: 19/11/2019 19:00:00 AEST

Change End Date & Time: 19/11/2019 23:00:00 AEST

Outage Start Date & Time: 19/11/2019 19:00:00 AEST

Outage End Date & Time: 19/11/2019 23:00:00 AEST

Change Description:

Maintenance activity on Gas Supply Hub Production System.

Environment: Production

Participant Impact and Requirements:

All access to the Gas Supply Hub (Exchange Trading System) will be unavailable during the outage period. Access will be available outside this outage period.

Support Information:
Report any impacts to the AEMO Information and Support Hub or on External 1300 236 600.
71138MARKET INTERVENTION13/11/2019 04:41:42 PM

AEMO Intervention Event - Intervention price dispatch intervals - 13/11/2019

AEMO ELECTRICITY MARKET NOTICE.

AEMO Intervention Event - Intervention price dispatch intervals - 13/11/2019

Refer AEMO Electricity Market Notice no. 71137

An AEMO Intervention Event occurred when AEMO issued a direction to maintain the power system in a secure operating state.

The AEMO Intervention Event commenced in the 1635 hrs dispatch interval and is forecast to apply until 0400 hrs 15/11/2019.

AEMO declares all dispatch intervals during the AEMO Intervention Event to be intervention price dispatch intervals.

The direction is expected to affect dispatch quantities for intervention pricing purposes from the 0935 hrs dispatch interval on 14/11/2019.

Manager NEM Real Time Operations
71137MARKET INTERVENTION13/11/2019 04:41:20 PM

Direction - SA region 13/11/2019

AEMO ELECTRICITY MARKET NOTICE.

Direction - SA region 13/11/2019

In accordance with section 116 of the National Electricity Law, AEMO has issued a direction to a participant in the SA region.

The direction was necessary to maintain the power system in a secure operating state.

AEMO may issue or revoke additional directions in order to meet the current requirement, unless sufficient market response is provided.

A further market notice will be issued when all directions related to this requirement have been cancelled.

For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a).


Manager NEM Real Time Operations
71134MARKET INTERVENTION13/11/2019 02:44:36 PM

Possible intervention to manage power system security in South Australia (SA) Region

AEMO ELECTRICITY MARKET NOTICE

Possible intervention to manage power system security in South Australia (SA) Region

The synchronous generating units expected to be synchronised in SA from 0900 hrs 14/11/2019 to 0430 hrs 15/11/2019 in Pre-dispatch published at 1500 hrs 13/11/2019 are inadequate to maintain sufficient system strength in SA and hence a secure operating state.

AEMO currently estimates that, in the absence of sufficient market response by 1530 hrs 13/11/2019, AEMO may need to intervene by issuing a direction requiring one or more SA synchronous generating unit(s) to operate or remain synchronised to maintain power system security in SA.

Manager NEM Real Time Operations
71133INTER-REGIONAL TRANSFER13/11/2019 01:05:19 PM

Inter-Regional Transfer limit variation - Directlink - NSW Region

AEMO ELECTRICITY MARKET NOTICE

Refer to MN 71130: Due to of the existence of abnormal conditions, namely multiple large bushfires burning across NSW.

To manage System security the following constraint set was invoked at 1255 hrs 13/11/2019.

I-NQTE_-40

The constraint set contains the following interconnector on the left hand side.

N-Q-MNSP1

Manager NEM Real Time Operations
71132INTER-REGIONAL TRANSFER13/11/2019 04:45:39 AM

Cancellation - Inter-regional transfer limit variation: Hazelwood - South Morang No.1 500 kV Line (Vic) - Voltage Control

AEMO ELECTRICITY MARKET NOTICE

Refer AEMO Electricity Market Notice 71131

The Hazelwood - South Morang No.1 500 kV Line has been returned to service

The following constraint set was revoked at 0445 hrs 13/11/2019

V-HWSM

The constraint set contains equations with the following interconnectors on the LHS.

T-V-MNSP1
V-S-MNSP1
V-SA
VIC1-NSW1

Manager NEM Real Time Operations
71131INTER-REGIONAL TRANSFER13/11/2019 01:25:32 AM

Inter-regional transfer limit variation: Hazelwood - South Morang No1 500 kV Line (VIC) - Voltage Control

AEMO ELECTRICITY MARKET NOTICE

The Hazelwood - South Morang No 1 500 kV Line has been de-energised to manage voltages in the Victoria region.

The following constraint set was invoked at 0100 hrs 13/11/2019.

V-HWSM

The constraint set contains equations with the following interconnectors on the LHS.

T-V-MNSP
V-S-MNSP1
V-SA
VIC1-NSW1

Refer to AEMO Network Outage Scheduler (NOS) for further details

Manager NEM Real Time Operations
71130GENERAL NOTICE13/11/2019 12:08:53 AM

Non-credible contingency event more likely to occur due to existence of abnormal conditions - NSW region.

AEMO ELECTRICITY MARKET NOTICE.
Refer to AEMO ELECTRICITY MARKET NOTICE 71090

AEMO has identified that a non-credible contingency event is more likely to occur in the NSW region because of the existence of abnormal conditions, namely multiple large bushfires burning across NSW.

At the time of this notice there are two reclassifications in place, however the criteria for reclassification of any other non-credible contingency event have not been met, and there is a possibility of bushfires impacting multiple transmission elements in NSW.

Conditions can change rapidly and potentially impacted plant may change. Further notices will only be published to advise of any reclassification, or when the abnormal conditions have ceased to impact the likelihood of a non-credible event occurring.

Manager NEM Real Time Operations
71129RECLASSIFY CONTINGENCY12/11/2019 08:43:39 PM

Update - Reclassification of a Non-Credible Contingency Event: Bayswater - Regentville 31 330 kV line and Bayswater - Sydney West 32 330 kV lines in NSW due to a Bushfire.

AEMO ELECTRICITY MARKET NOTICE
Refer to AEMO Electricity Market Notice 71097

Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to a Bushfire. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. AEMO has reclassified it as a credible contingency event.

Region: NSW

Lines: Bayswater - Regentville 31 330 kV line and Bayswater - Sydney West 32 330 kV lines.

Duration: 12/11/2019 16:05 until further notice.

Constraint set(s) invoked: N-X_31+32_N-2

Manager NEM Real Time Operations