Change Number: CHG0056687 : Maintenance activity on Gas Supply Hub Production System.
Notification issued to: Market Notice
Notification Type: Initial
Change Type: Normal
Service/ Component: Gas Supply Hub
Change Title: Planned System Outage - Gas Supply Hub
Change Start Date & Time: 19/11/2019 19:00:00 AEST
Change End Date & Time: 19/11/2019 23:00:00 AEST
Outage Start Date & Time: 19/11/2019 19:00:00 AEST
Outage End Date & Time: 19/11/2019 23:00:00 AEST
Change Description:
Maintenance activity on Gas Supply Hub Production System.
Environment: Production
Participant Impact and Requirements:
All access to the Gas Supply Hub (Exchange Trading System) will be unavailable during the outage period. Access will be available outside this outage period.
Support Information:
Report any impacts to the AEMO Information and Support Hub or on External 1300 236 600.
AEMO Intervention Event - Intervention price dispatch intervals - 13/11/2019
AEMO Intervention Event - Intervention price dispatch intervals - 13/11/2019
Refer AEMO Electricity Market Notice no. 71137
An AEMO Intervention Event occurred when AEMO issued a direction to maintain the power system in a secure operating state.
The AEMO Intervention Event commenced in the 1635 hrs dispatch interval and is forecast to apply until 0400 hrs 15/11/2019.
AEMO declares all dispatch intervals during the AEMO Intervention Event to be intervention price dispatch intervals.
The direction is expected to affect dispatch quantities for intervention pricing purposes from the 0935 hrs dispatch interval on 14/11/2019.
Manager NEM Real Time Operations
Direction - SA region 13/11/2019
Direction - SA region 13/11/2019
In accordance with section 116 of the National Electricity Law, AEMO has issued a direction to a participant in the SA region.
The direction was necessary to maintain the power system in a secure operating state.
AEMO may issue or revoke additional directions in order to meet the current requirement, unless sufficient market response is provided.
A further market notice will be issued when all directions related to this requirement have been cancelled.
For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a).
Manager NEM Real Time Operations
Possible intervention to manage power system security in South Australia (SA) Region
Possible intervention to manage power system security in South Australia (SA) Region
The synchronous generating units expected to be synchronised in SA from 0900 hrs 14/11/2019 to 0430 hrs 15/11/2019 in Pre-dispatch published at 1500 hrs 13/11/2019 are inadequate to maintain sufficient system strength in SA and hence a secure operating state.
AEMO currently estimates that, in the absence of sufficient market response by 1530 hrs 13/11/2019, AEMO may need to intervene by issuing a direction requiring one or more SA synchronous generating unit(s) to operate or remain synchronised to maintain power system security in SA.
Manager NEM Real Time Operations
Inter-Regional Transfer limit variation - Directlink - NSW Region
Refer to MN 71130: Due to of the existence of abnormal conditions, namely multiple large bushfires burning across NSW.
To manage System security the following constraint set was invoked at 1255 hrs 13/11/2019.
I-NQTE_-40
The constraint set contains the following interconnector on the left hand side.
N-Q-MNSP1
Manager NEM Real Time Operations
Cancellation - Inter-regional transfer limit variation: Hazelwood - South Morang No.1 500 kV Line (Vic) - Voltage Control
Refer AEMO Electricity Market Notice 71131
The Hazelwood - South Morang No.1 500 kV Line has been returned to service
The following constraint set was revoked at 0445 hrs 13/11/2019
V-HWSM
The constraint set contains equations with the following interconnectors on the LHS.
T-V-MNSP1
V-S-MNSP1
V-SA
VIC1-NSW1
Manager NEM Real Time Operations
Inter-regional transfer limit variation: Hazelwood - South Morang No1 500 kV Line (VIC) - Voltage Control
The Hazelwood - South Morang No 1 500 kV Line has been de-energised to manage voltages in the Victoria region.
The following constraint set was invoked at 0100 hrs 13/11/2019.
V-HWSM
The constraint set contains equations with the following interconnectors on the LHS.
T-V-MNSP
V-S-MNSP1
V-SA
VIC1-NSW1
Refer to AEMO Network Outage Scheduler (NOS) for further details
Manager NEM Real Time Operations
Non-credible contingency event more likely to occur due to existence of abnormal conditions - NSW region.
Refer to AEMO ELECTRICITY MARKET NOTICE 71090
AEMO has identified that a non-credible contingency event is more likely to occur in the NSW region because of the existence of abnormal conditions, namely multiple large bushfires burning across NSW.
At the time of this notice there are two reclassifications in place, however the criteria for reclassification of any other non-credible contingency event have not been met, and there is a possibility of bushfires impacting multiple transmission elements in NSW.
Conditions can change rapidly and potentially impacted plant may change. Further notices will only be published to advise of any reclassification, or when the abnormal conditions have ceased to impact the likelihood of a non-credible event occurring.
Manager NEM Real Time Operations
Update - Reclassification of a Non-Credible Contingency Event: Bayswater - Regentville 31 330 kV line and Bayswater - Sydney West 32 330 kV lines in NSW due to a Bushfire.
Refer to AEMO Electricity Market Notice 71097
Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to a Bushfire. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. AEMO has reclassified it as a credible contingency event.
Region: NSW
Lines: Bayswater - Regentville 31 330 kV line and Bayswater - Sydney West 32 330 kV lines.
Duration: 12/11/2019 16:05 until further notice.
Constraint set(s) invoked: N-X_31+32_N-2
Manager NEM Real Time Operations