73865RECLASSIFY CONTINGENCY06/02/2020 04:28:20 PM

Reclassification of a Non-Credible Contingency Event: Hazelwood - Rowville No.1 220kV line and Hazelwood - Rowville No.2 220kV line in VIC1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.

Region: VIC1

Lines: Hazelwood - Rowville No.1 220kV and Hazelwood - Rowville No.2 220kV

Duration: 06/02/2020 16:28 until further notice

Constraint set(s) invoked:
V-HWRO_R_N-2 Constraint set contains the following interconnector(s) on the left hand side:
NONE


Auto-generated on behalf of Manager NEM Real Time Operations
73864RECLASSIFY CONTINGENCY06/02/2020 04:21:33 PM

Reclassification of a Non-Credible Contingency Event: Condabri North - Condabri Central No. 7400 and No. 7401 132kV lines in QLD due to lightning.

AEMO ELECTRICITY MARKET NOTICE

Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.

Region: QLD1

Lines: Condabri North - Condabri Central No.7400 and No. 7401 132 kV

Duration: 06/02/2020 16:20 hrs until further notice

Constraint set(s) invoked:
NONE

Manager NEM Real Time Operations
73863RECLASSIFY CONTINGENCY06/02/2020 02:55:20 PM

Reclassification of a Non-Credible Contingency Event: Dederang - Glenrowan No.1 220 kV line and Dederang - Glenrowan No.3 220 kV line in VIC1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.

Region: VIC1

Lines: Dederang - Glenrowan No.1 220 kV and Dederang - Glenrowan No.3 220 kV

Duration: 06/02/2020 14:55 until further notice

Constraint set(s) invoked:
V-DDGN_N-2 Constraint set contains the following interconnector(s) on the left hand side:
V-S-MNSP1
VIC1-NSW1


Auto-generated on behalf of Manager NEM Real Time Operations
73860RECLASSIFY CONTINGENCY06/02/2020 02:04:30 PM

Cancellation of a Non-Credible Contingency Event: Dederang - Glenrowan No.1 220 kV line and Dederang - Glenrowan No.3 220 kV line in VIC1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.

Region: VIC1

Lines: Dederang - Glenrowan No.1 220 kV and Dederang - Glenrowan No.3 220 kV

Cancellation time: 06/02/2020 14:04

Constraint set(s) revoked:
V-DDGN_N-2 Constraint set contains the following interconnector(s) on the left hand side:
V-S-MNSP1
VIC1-NSW1


Refer AEMO Electricity Market Notice 73859

Auto-generated on behalf of Manager NEM Real Time Operations
73859RECLASSIFY CONTINGENCY06/02/2020 12:59:25 PM

Reclassification of a Non-Credible Contingency Event: Dederang - Glenrowan No.1 220 kV line and Dederang - Glenrowan No.3 220 kV line in VIC1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.

Region: VIC1

Lines: Dederang - Glenrowan No.1 220 kV and Dederang - Glenrowan No.3 220 kV

Duration: 06/02/2020 12:59 until further notice

Constraint set(s) invoked:
V-DDGN_N-2 Constraint set contains the following interconnector(s) on the left hand side:
V-S-MNSP1
VIC1-NSW1


Auto-generated on behalf of Manager NEM Real Time Operations
73858GENERAL NOTICE06/02/2020 09:57:19 AM

New synchronous generator combinations for the SA + APD + Mortlake Island for system strength and frequency control

AEMO ELECTRICITY MARKET NOTICE

Refer to market notice 73838

AEMO is continuing to investigate combinations required for the extended operation of South Australia, Mortlake and APD connected as an island. Six new minimum combinations of synchronous generation in South Australia have been added, these are:
4 - 3 x Torrens Island A units + 2 x Torrens Island B units + Osborne GT & ST
5 - 3 x Torrens Island A units + 2 x Torrens Island B units + 1 x Pelican Point GT/ST units
6 - 2 x Torrens Island A units + 3 x Torrens Island B units + 1 x Pelican Point GT/ST units
7 - 3 x Torrens Island A units + 2 x Torrens Island B units + Quarantine 5
8 - 2 x Torrens Island A units + 3 x Torrens Island B units + Quarantine 5

The limits advice on the AEMO website will be updated shortly:
https://www.aemo.com.au/-/media/files/electricity/nem/security_and_reliability/congestion-information/transfer-limit-advice-system-strength.pdf?la=en

AEMO is continuing to investigate other synchronous generator combinations ? these will be advised by future market notices.

Ben Blake
AEMO Operations
73857GENERAL NOTICE06/02/2020 09:47:34 AM

Operation of SA + APD + Mortlake Island during low demand periods

AEMO ELECTRICITY MARKET NOTICE

AEMO has determined that during times of low demand in South Australia + APD + Mortlake island a number of generators and Murraylink need to be constrained. This is so there is enough inertia, frequency responsive plant, and generation enabled in the over-frequency generation shedding scheme (OFGS) to ensure power system security is maintained following a credible contingency.

When the operational demand in South Australia falls below 800 MW the following generators will be ramped down and constrained to zero (see Constraint Set: SA-GEN_RAMP_ZERO)

Angaston
Barkers Inlet
Bungala 1 SF
Bungala 2 SF
Dry Creek
Hallett
Hornsdale 1 WF
Hornsdale 2 WF
Hornsdale 3 WF
Ladbroke Grove
Lincoln Gap WF
Lonsdale
Mintaro
Port Lincoln GT
Port Stanvac
QPS 1-4
Snuggery
Tailem Bend SF
Willogoleche WF

Murraylink will also be constrained to zero flows from Victoria to South Australia (unconstrained for SA to Vic flows).

The following non-scheduled generators will be directed to zero:
Cathedral Rocks WF
Mt Millar WF
Starfish Hill WF
Wattle Point WF

Ben Blake
AEMO Operations
73856RECLASSIFY CONTINGENCY06/02/2020 09:29:00 AM

Reclassification of a Non-Credible Contingency Event: Eildon PS - Mt Beauty No.1 220 kV line and Eildon PS - Mt Beauty No.2 220 kV line in VIC1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.

Region: VIC1

Lines: Eildon PS - Mt Beauty No.1 220 kV and Eildon PS - Mt Beauty No.2 220 kV

Duration: 06/02/2020 09:28 until further notice

Constraint set(s) invoked:
NONE

Auto-generated on behalf of Manager NEM Real Time Operations
73855ADMINISTERED PRICE CAP06/02/2020 03:55:33 AM

[EventId:135] AP STARTED for market ancillary services in SA at 06 February 2020 04:00

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 0355 hrs on 6 February 2020

ADMINISTERED PRICE PERIOD DECLARED in SA region.

AEMO has determined that the rolling sum of the uncapped market ancillary Lower 60 Sec, Lower 6 Sec, Raise 6 Sec services(s) prices for the SA region over the previous 2016 dispatch intervals has exceeded 6 times the cumulative price threshold (CPT) of $221,100.00.

In accordance with Clause 3.14 of the National Electricity Rules, AEMO has determined that an administered price period will commence at the dispatch interval starting 0400 hrs on 6 Feb 2020 and will continue through to the end of that trading day.

An administered price cap (APC) of 300 $/MWh will apply to all dispatch intervals during this administered price period. This APC will apply to all market ancillary service prices in the SA region.

An administered floor price (AFP) of 0 $/MWh AFP will apply to all market ancillary service prices.

AEMO will continue to monitor the rolling sum of the uncapped market ancillary service prices and issue further market notices as required.