The publication of this final report concludes the expedited consultation procedure conducted by AEMO in respect of the proposal to undertake the amendments to the following documents, effective 1 July 2025, to remove the SA jurisdictional metrology material related to controlled load profiles under the National Electricity Rules:
- Metrology Procedure: Part A.
- Metrology Procedure: Part B.
- MSATS Procedures: MDM Procedures.
- MSATS Procedures - Principles and Obligations for All Connection Points
- Standing Data for MSATS document.
- Service Level Procedure: Metering Data Provider Services
Procedures (Change Marked)
-
31/03/2025
Metrology Procedure: Part A
483.39 KB -
31/03/2025
Metrology Procedure: Part B
939.39 KB -
31/03/2025
MSATS Procedures: MDM Procedures
634.31 KB -
31/03/2025
MSATS Procedures - Principles and Obligations for All Connection Points
3.44 MB -
31/03/2025
Service Level Procedure: Metering Data Provider Services
647.56 KB -
31/03/2025
Standing Data for MSATS document
1.04 MB
Procedures (Clean)
-
31/03/2025
Metrology Procedure Part A v7.9
Effective 1 July 2025
478.49 KB -
31/03/2025
Metrology Procedure Part B v7.9
Effective 1 July 2025
925.59 KB -
31/03/2025
MSATS Procedures - MDM Procedure v4.8
Effective 1 July 2025
607.47 KB -
31/03/2025
MSATS Procedures - Principles and Obligations for All Connection Points v6.1
Effective 1 July 2025
3.4 MB -
31/03/2025
Service Level Procedure MDP Services v2.5
Effective 1 July 2025
614.73 KB -
31/03/2025
Standing Data for MSATS v6.0
Effective 1 July 2025
1.04 MB
Participant Feedback
The publication of this draft report commences the expedited rules consultation procedure being undertaken by AEMO on the proposal to amend the following documents, effective 1 July 2025, to remove the SA jurisdictional metrology material related to controlled load profiles (CLPs) and metering installation reversion provisions under the National Electricity Rules (NER):
- Metrology Procedure: Part A.
- Metrology Procedure: Part B.
- MSATS Procedures: MDM Procedures.
- MSATS Procedures - Principles and Obligations for All Connection Points
- Standing Data for MSATS document.
- Service Level Procedure: Metering Data Provider Services
- In accordance with NER 8.9.3(b):
If a person considers that AEMO should switch to using the standard rules consultation procedure in respect of this Proposal, then the person can submit a request for AEMO to do so within 10 business days after publication of this Draft Report.
The Procedure Change Request must be sent to nem.retailprocedureconsultations@aemo.com.au by 5:00pm (Sydney time) 28 February 2025.
- The Procedure Change Request must include reasons why the person considers the Proposal is not a Non-material Proposal as defined in NER 8.9.1(a).
AEMO invites written submissions from interested persons in respect of this Draft Report to nem.retailprocedureconsultations@aemo.com.au by 5:00pm (Sydney time) on 14 March 2025.
Procedures (Change Marked):
-
14/02/2025
Metrology Procedure Part A v7.9 (change marked draft)
471.33 KB -
14/02/2025
Metrology Procedure Part B v7.9 (change marked draft).
939.09 KB -
14/02/2025
MSATS Procedures - MDM Procedure v4.8 (change marked draft)
610.07 KB -
14/02/2025
MSATS Procedures - Principles and Obligations for All Connection Points v6.1 (change market draft)
3.45 MB -
14/02/2025
Service Level Procedure MDP Services v2.5 (change marked draft)
648.08 KB -
14/02/2025
Standing Data for MSATS v6.0 (change marked draft)
1.05 MB