Timeline
-
Publication of the Draft 2025 Gas Infrastructure Options Report22 May 2025
-
Draft 2025 Gas Infrastructure Options Report public webinar29 May 2025
-
Written consultation submissions due23 June 2025
-
Publication of the final 2025 2025 Gas Infrastructure Options ReportBy 31 July 2025
Key contact
Email: ISP@aemo.com.au
Matter under consultation
The Draft 2025 Gas Infrastructure Options Report, has been published in response to has been published in response to new rule change requirements to enable the better integration of gas into the ISP, as required through the Federal Government’s 2024 review of the ISP.
This new report outlines gas infrastructure options and gas infrastructure cost components, that will be used to develop gas development projections for the Integrated System Plan (ISP) and its Optimal Development Path. This ensures that the electricity investments — particularly in gas powered generation (GPG) — consider and are resilient to the capacity, availability and limitations of gas as a fuel for electricity generation.
Consultation on the Draft 2025 Gas Infrastructure Options Report closed on 23 June 2025. Submissions have been published, except for confidential material in accordance with AEMO’s Consultation submission guidelines.
AEMO hosted a Draft 2025 Gas Infrastructure Options Report webinar on 29 May 2025 to help stakeholders gain insights on the report.
-
Draft documents
-
Submissions
-
Final documents
This report identifies gas infrastructure options and gas infrastructure cost components that will support the development of gas development projections for the 2026 ISP.
-
11/07/2025
Andrew Fletcher
890.97 KB -
11/07/2025
APA
941.45 KB -
11/07/2025
Australian Energy Council
209.55 KB -
11/07/2025
Australian Energy Producers
382.9 KB -
11/07/2025
Australian Pipelines Gas Association
113.49 KB -
11/07/2025
Climateworks Centre
279.35 KB -
11/07/2025
CS Energy
96.07 KB -
11/07/2025
Energy Networks Australia
201.57 KB -
11/07/2025
Energy Users Association of Australia
250.62 KB -
11/07/2025
Epic Energy
933.64 KB -
11/07/2025
Future Fuels CRC
264.59 KB -
11/07/2025
Institute for Energy Economics and Financial Analysis
131.67 KB -
11/07/2025
2026 ISP Consumer Panel
505.94 KB -
11/07/2025
Jemena
235.39 KB -
11/07/2025
Justice and Equity Centre
432.96 KB -
11/07/2025
Lochard Energy
1010.59 KB -
11/07/2025
Powerlink Queensland
1010.08 KB -
11/07/2025
Shell Energy
86.81 KB -
11/07/2025
Squadron Energy
342.03 KB -
11/07/2025
Transgrid
331.21 KB