Timeline
-
Pre-publication engagementJuly - November 2024
-
Publication of the Draft 2025 IASR stage 111 December 2024
-
Draft 2025 IASR Stage 1 public webinar23 January 2025
-
Stage 1 Consumer Advocate verbal submission11 February 2025
-
Stage 1 consultation submissions close11 February 2025
-
Publication of the Draft 2025 IASR stage 228 February 2025
-
Draft 2025 IASR Stage 2 public webinar18 March 2025
-
Stage 2 Consumer Advocate verbal submission31 March 2025
-
Stage 2 consultation submissions close31 March 2025
-
Publication of the final 2025 IASRJuly 2025
Key contact
Matter under consultation
AEMO delivers a range of forecasting and planning publications for the National Electricity Market (NEM), including the NEM Electricity Statement of Opportunities (ESOO), the Gas Statement of Opportunities (GSOO), and the Integrated System Plan (ISP). This consultation relates to the inputs, assumptions and scenarios that AEMO proposes to use in its 2025-26 forecasting and planning activities, including the 2026 ISP.
In developing the Draft IASR and the proposed scenarios, AEMO has sought stakeholder input and feedback through several workshops and webinars, and consultation on the draft scenarios. For further information, see the 2026 ISP Stakeholder Engagement and Forecasting Reference Group webpages.
The Draft 2025 Inputs, Assumptions and Scenarios Report is being published and consulted on in two stages, as per the adjacent timeline.
Draft 2025 IASR stage 2 consultation submissions are due in PDF format to forecasting.planning@aemo.com.au by 6pm AEDT on 31 March 2025.
Please note that submissions will be published, other than confidential material, subject to AEMO’s Consultation submission guidelines.
-
Draft 2025 IASR Stage 1
-
Stage 1 submissions
-
Draft 2025 GenCost submissions
-
Draft 2025 IASR Stage 2
-
Stage 2 submissions
-
Final IASR
Report
-
11/12/2024
Draft 2025 Inputs, Assumptions and Scenarios Report Stage 1
This report contains descriptions for most of the Draft 2025 inputs, assumptions and scenarios to be used in AEMO’s 2025-26 Forecasting and Planning publications for the National Electricity Market (NEM).
5.24 MB -
20/12/2024
Draft 2025 Stage 1 Inputs and Assumptions Workbook
This spreadsheet contains key draft scenario data to be used as inputs in AEMO’s market models for 2025-26 Planning and Forecasting activities.
9.69 MB -
11/12/2024
2025 IASR Scenarios Consultation Summary Report
417.5 KB -
11/12/2024
Draft 2025 IASR Scenarios Overview
913.36 KB
Reference materials
-
28/02/2025
ACIL Allen: 2024 Gas, liquid fuel, coal and renewable gas projections
1.95 MB -
11/12/2024
ACIL Allen: 2024 Price forecast data files
893.78 KB -
11/12/2024
AEMO: Indicative REZ boundaries 2025 - GIS data
778.07 KB -
11/12/2024
AEMO: Indicative sub-regional boundaries 2025 - GIS data
44.21 KB -
16/12/2022
AEP Elical: 2020 Assessment of Ageing Coal-Fired Generation Reliability
1.4 MB -
11/12/2024
Aurecon: 2024 Costs and Technical Parameter Review
4.44 MB -
11/12/2024
Aurecon: 2024 Cost and Technical Parameters Review – workbook
58.7 KB -
11/12/2024
CSIRO: 2024 Solar PV and Battery Projections Report
1.86 MB -
11/12/2024
Deloitte Access Economics: 2024 Economic Forecast
1.44 MB -
07/12/2018
Entura: Pumped Hydro cost modelling
1.02 MB -
11/12/2024
GEM: 2024 Solar PV and Battery Projections Report
2.2 MB -
11/12/2024
Oxford Economics Australia: 2024 Discount Rate report
1.33 MB
-
28/02/2025
2026 ISP Consumer Panel Draft 2025 IASR stage 1 submission
2.62 MB -
28/02/2025
Andrew Fletcher
1.4 MB -
28/02/2025
Ausgrid
304.53 KB -
28/02/2025
Australian Aluminium Council
685.86 KB -
28/02/2025
Australian Pipelines and Gas Association
242.54 KB -
28/02/2025
Australian Solar Thermal Research Institute and the Australian Solar Thermal Energy Association
307.18 KB -
28/02/2025
Bryan Pedersen
60.18 KB -
28/02/2025
Centre for Independent Studies
1.4 MB -
28/02/2025
Clean Energy Investor Group
455.1 KB -
28/02/2025
Consumer Advocates IASR Stage 1 verbal submission
276.98 KB -
28/02/2025
David Close - Director of the Gas Energy Transition Research Centre
277.8 KB -
28/02/2025
DeCarbonate Energy
155.21 KB -
28/02/2025
ElectraNet
100.09 KB -
28/02/2025
Energy Estate
242.93 KB -
28/02/2025
EnergyAustralia
135.58 KB -
28/02/2025
EnergyCo NSW
288.19 KB -
28/02/2025
Engie
278.95 KB -
28/02/2025
Ergon Energy and Energex
103.04 KB -
28/02/2025
Erne Energy
197.66 KB -
28/02/2025
Gas Energy Australia
315.02 KB -
28/02/2025
Heavy Industry Low-carbon Transition Cooperative Research Centre
1.07 MB -
28/02/2025
Hydro Tasmania
1.21 MB -
28/02/2025
Justice and Equity Centre
432.74 KB -
28/02/2025
Marinus Link
735.26 KB -
28/02/2025
Martin Kamener
184.72 KB -
28/02/2025
Nexa Advisory
99.24 KB -
28/02/2025
Queensland Conservation Council
312.02 KB -
28/02/2025
Queensland Electricity Users Network
456.04 KB -
28/02/2025
Rainforest Reserves Australia
320.31 KB -
28/02/2025
Squadron Energy
175.61 KB -
28/02/2025
TasNetworks
218.3 KB -
28/02/2025
Transgrid
283.77 KB -
28/02/2025
Windlab
276.58 KB
GenCost submissions
-
28/03/2025
Andrew Fletcher
2.07 MB -
28/03/2025
Angus McFarlane
1.61 MB -
28/03/2025
Australian National University RE100 group
398.47 KB -
28/03/2025
Australian Resources Development Pty Ltd
1001.93 KB -
28/03/2025
Australian Solar Thermal Research Institute and the Australian Solar Thermal Energy Association
375.59 KB -
28/03/2025
Bloom Energy
77.6 KB -
28/03/2025
Bob King
51.1 KB -
28/03/2025
Centre for Independent Studies
798.8 KB -
28/03/2025
Coal Australia
1.29 MB -
28/03/2025
Coalition for Conservation
152.89 KB -
28/03/2025
Dominic Wild
139.87 KB -
28/03/2025
Electrical Trades Union
249.88 KB -
28/03/2025
GE Vernova
748.03 KB -
28/03/2025
Ian Kilpatrick
69.26 KB -
28/03/2025
International Hydropower Association
451.82 KB -
28/03/2025
Paul Trantallis
62.56 KB -
28/03/2025
Peter Howe
486.16 KB -
28/03/2025
Robert Saunders
259.79 KB -
28/03/2025
Roderick Sinclair
137.54 KB -
28/03/2025
Rondo Energy
128.27 KB
Report
-
28/02/2025
Draft 2025 Inputs, Assumptions and Scenarios Report Stage 2
This report contains descriptions for the remainder of the Draft 2025 inputs, assumptions and scenarios to be used in AEMO’s 2025-26 Forecasting and Planning publications for the National Electricity Market (NEM).
8.14 MB -
28/02/2025
Draft 2025 Stage 2 Inputs and Assumptions Workbook
This spreadsheet contains key draft scenario data to be used as inputs in AEMO’s market models for 2025-26 Planning and Forecasting activities.
9.04 MB -
19/03/2025
Draft 2025 IASR stage 2 webinar presentation
2.49 MB
Reference materials
-
28/02/2025
AEMO: Draft 2025 IASR EV Workbook
637.68 KB -
28/02/2025
CSIRO: Electric vehicle projections 2024
1.6 MB -
28/02/2025
Oxford Economics Australia: 2025 IASR Planning and Installation Cost Escalation Factors
1.27 MB -
28/02/2025
Strategy. Policy. Research.: 2025 Energy Efficiency Forecasts Final Report
3.8 MB