125619RESERVE NOTICE14/03/2025 04:54:36 AM

STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 16/03/2025

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 125607 is cancelled at 0450 hrs 14/03/2025.

No LOR2 condition is currently forecast in the STPASA period.

Manager NEM Real Time Operations
     
125608SETTLEMENTS RESIDUE13/03/2025 06:30:23 PM

[EventId:202503131830_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 13 March 2025 18:30

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1830 hrs on 13 March 2025

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 13 March 2025.

Refer to market notice: 125605

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.

The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1830 hrs on 13 March 2025.

This is an AEMO autogenerated Market Notice.
     
125607RESERVE NOTICE13/03/2025 06:27:48 PM

STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 16/03/2025

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following period:

[1.] From 1700 hrs 16/03/2025 to 1830 hrs 16/03/2025.
The forecast capacity reserve requirement is 1154 MW.
The minimum capacity reserve available is 948 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.

Manager NEM Real Time Operations
     
125605SETTLEMENTS RESIDUE13/03/2025 05:40:23 PM

[EventId:202503131740_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 13 March 2025 17:40

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1740 hrs on 13 March 2025

ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 13 March 2025.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.

The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1740 hrs on 13 March 2025.

This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
     
125516SETTLEMENTS RESIDUE11/03/2025 09:30:23 AM

[EventId:202503110930_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 11 March 2025 09:30

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 0930 hrs on 11 March 2025

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 11 March 2025.

Refer to market notice: 125514

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.

The negative residue constraint NRM_NSW1_VIC1 ceased operating at 0930 hrs on 11 March 2025.

This is an AEMO autogenerated Market Notice.
     
125514SETTLEMENTS RESIDUE11/03/2025 08:30:33 AM

[EventId:202503110830_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 11 March 2025 08:30

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 0830 hrs on 11 March 2025

ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 11 March 2025.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.

The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 0830 hrs on 11 March 2025.

This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
     
125442ADMINISTERED PRICE CAP09/03/2025 06:54:53 PM

Update - AEMO market notice 125439 was published in error: AP STARTED for ENERGY in SA1 at 09 March 2025 17:55

AEMO ELECTRICITY MARKET NOTICE

Refer market notice 125439 and 125440

AEMO confirms that market notice 125439 was published in error.

An ADMINISTERED PRICE PERIOD has NOT been triggered in SA1 region.

Manager NEM Real Time Operations
     
125440ADMINISTERED PRICE CAP09/03/2025 06:28:14 PM

AEMO market notice 125439 was published in error: AP STARTED for ENERGY in SA1 at 09 March 2025 17:55

AEMO ELECTRICITY MARKET NOTICE

Refer market notice 125439

AEMO believes market notice 125439 was published in error.

We believe an ADMINISTERED PRICE PERIOD has NOT been triggered in SA1 region.

AEMO is currently reviewing the event and will update the market as soon as possible.

Issued by Australian Energy Market Operator Ltd at 1820 hrs on 09 March 2025

Manager NEM Real Time Operations
     
125439ADMINISTERED PRICE CAP09/03/2025 05:55:23 PM

[EventId:204] AP STARTED for ENERGY in SA1 at 09 March 2025 17:55

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1755 hrs on 09 March 2025

ADMINISTERED PRICE PERIOD DECLARED in SA1 region.

AEMO has determined that the rolling sum of the uncapped spot prices for the SA1 region over the previous 2016 trading intervals has exceeded the cumulative price threshold (CPT) of $1,573,700.00.

In accordance with Clause 3.14.2(b) of the National Electricity Rules, AEMO has determined that an administered price period will commence at the trading interval starting 1805 hrs on 09 March 2025 and will continue through to the end of that trading day.

An administered price cap (APC) of 600 $/MWh will apply to all trading intervals during this administered price period. This APC will apply to spot prices and to all market ancillary service prices in the SA1 region.

An administered floor price (AFP) of -600 $/MWh will apply to spot prices.

AEMO will continue to monitor the rolling sum of the uncapped spot prices and issue further Market Notices as required.

This is an AEMO autogenerated Market Notice.
     