118295RESERVE NOTICE16/09/2024 04:27:43 PM

STPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 17/09/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 118280 is cancelled at 1600 hrs 16/09/2024.

No LOR condition is currently forecast in the STPASA period.

AEMO Operations
     
118293MARKET INTERVENTION16/09/2024 04:58:57 PM

Direction - SA region 16/09/2024

AEMO ELECTRICITY MARKET NOTICE

Direction - SA region 16/09/2024

Refer to Market Notice 118291


In accordance with clause 4.8.9(a)(1) of the National Electricity Rules, AEMO is issuing a direction to AGL SA Generation Pty Limited. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a1)(1).

Direction issued to: AGL SA Generation Pty Limited - TORRB4 TORRENS ISLAN at 1700 hrs 16/09/2024
Type of resource: generating unit
Required actions: synchronise and follow dispatch targets at 0800 hrs 17/09/2024
Services provided: Voltage Control
Circumstances necessitating the Voltage
Circumstances necessitating the Direction additional detail: intervention is required to maintain the power system in a secure operating state

Expected duration: 1630 hrs 17/09/2024.

AGL SA Generation Pty Limited does not incur any civil monetary liability for a relevant action taken in accordance with this direction unless the action is taken in bad faith.

Manager NEM Real Time Operations
     
118292MARKET INTERVENTION16/09/2024 04:57:49 PM

Direction - SA region 16/09/2024

AEMO ELECTRICITY MARKET NOTICE

Direction - SA region 16/09/2024

Refer to Market Notice 118291


In accordance with clause 4.8.9(a)(1) of the National Electricity Rules, AEMO is issuing a direction to AGL SA Generation Pty Limited. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a1)(1).

Direction issued to: AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN at 1700 hrs 16/09/2024
Type of resource: generating unit
Required actions: remain synchronised and follow dispatch targets at 0830 hrs 17/09/2024
Services provided: Voltage Control
Circumstances necessitating the Voltage
Circumstances necessitating the Direction additional detail: intervention is required to maintain the power system in a secure operating state

Expected duration: 1600 hrs 17/09/2024.

AGL SA Generation Pty Limited does not incur any civil monetary liability for a relevant action taken in accordance with this direction unless the action is taken in bad faith.

Manager NEM Real Time Operations
     
118291MARKET INTERVENTION16/09/2024 02:52:05 PM

Update - Foreseeable AEMO intervention in SA region

AEMO ELECTRICITY MARKET NOTICE

Update - Foreseeable AEMO intervention in SA region

Refer AEMO Electricity Market Notice 118289

AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 0800 hrs 17/09/2024.

The foreseeable circumstance requiring the need for intervention is Voltage.

AEMO estimates that, in the absence of sufficient market response by 1700 hrs 16/09/2024, AEMO may need to intervene by issuing a direction.

Manager NEM Real Time Operations
     
118290RECLASSIFY CONTINGENCY16/09/2024 01:14:54 PM

Cancellation of Reclassification of a Non-Credible Contingency Event - QLD region - 30/04/2019

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Reclassification of a Non-Credible Contingency Event: Nebo SVC and the Nebo No.2 275/132kV transformer - QLD region - 30/04/2019.

Refer AEMO Electricity Market Notice 68251

Based on advice from the participant, AEMO considers the simultaneous trip of the following elements is no longer reasonably possible. Accordingly its classification has reverted to a non-credible contingency event.


Region: QLD

Equipment: Nebo SVC and the Nebo No.2 275/132kV transformer

Cancellation time: 1315 hrs 16/09/2024

Constraint set(s) revoked: Nil


Manager NEM Real Time Operations
     
118289MARKET INTERVENTION16/09/2024 12:53:03 PM

Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region

AEMO ELECTRICITY MARKET NOTICE

Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region

AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 0800 hrs 17/09/2024.

The foreseeable circumstance requiring the need for intervention is Voltage.

Manager NEM Real Time Operations
     
118288MARKET INTERVENTION16/09/2024 02:35:22 PM

Cancellation - AEMO Intervention Event - SA region 13/09/2024

AEMO ELECTRICITY MARKET NOTICE

Cancellation - AEMO Intervention Event - SA region 13/09/2024

Refer to Market Notice 118268

The AEMO Intervention Event and all associated directions are cancelled from 1430 hrs on 16/09/2024.



Manager NEM Real Time Operations
     
118287MARKET INTERVENTION16/09/2024 02:29:40 PM

Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB4 TORRENS ISLAN

AEMO ELECTRICITY MARKET NOTICE

Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB4 TORRENS ISLAN

Refer to Market Notice 118284

Direction is cancelled from: 1430 hrs 16/09/2024

Manager NEM Real Time Operations
     
118286MARKET INTERVENTION16/09/2024 12:29:10 PM

Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN

AEMO ELECTRICITY MARKET NOTICE

Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN

Refer to Market Notice 118283

Direction is cancelled from: 1230 hrs 16/09/2024

Manager NEM Real Time Operations
     