Direction - SA region to Synergen Power Pty Limited - MINTARO MINTARO GAS
Direction - SA region to Synergen Power Pty Limited - MINTARO MINTARO GAS
Refer to Market Notice 120101
In accordance with section 116 of the National Electricity Law, AEMO is issuing a direction to Synergen Power Pty Limited. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a1)(1).
Direction issued to: Synergen Power Pty Limited - MINTARO MINTARO GAS at 1630 hrs 08/11/2024
Type of resource: generating unit
Required actions: Synchronise and follow dispatch targets at 0700 hrs 09/11/2024
Services provided: Voltage Control
Circumstances necessitating the Direction: Voltage
Circumstances necessitating the Direction additional detail: The synchronous generating units currently expected to be synchronised in SA will be inadequate to maintain sufficient Voltage Control in SA. Intervention is required to maintain the power system in a secure operating state
Expected duration: 1630 hrs 09/11/2024 / further notice.
Synergen Power Pty Limited does not incur any civil monetary liability for a relevant action taken in accordance with this direction unless the action is taken in bad faith.
Manager NEM Real Time Operations
Update Direction - AGL SA Generation Pty Limited - TORRB4 TORRENS ISLAN
Update Direction - AGL SA Generation Pty Limited - TORRB4 TORRENS ISLAN
Refer AEMO Electricity Participant Notice 120102
The TORRB4 TORRENS ISLAN direction is now expected to stay in place until 0400 hrs 10/11/2024.
The direction update is issued at 1630 hrs 08/11/2024.
Manager NEM Real Time Operations
[EventId:202411081510_confirmed] Prices for interval 08-Nov-2024 15:10 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1530 hrs on 8 November 2024
PRICES ARE NOW CONFIRMED for trading interval 08-Nov-2024 15:10.
In accordance with Market Notice 120150 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202411081530_confirmed] Prices for interval 08-Nov-2024 15:30 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1530 hrs on 8 November 2024
PRICES ARE NOW CONFIRMED for trading interval 08-Nov-2024 15:30.
In accordance with Market Notice 120154 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202411081525_confirmed] Prices for interval 08-Nov-2024 15:25 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1530 hrs on 8 November 2024
PRICES ARE NOW CONFIRMED for trading interval 08-Nov-2024 15:25.
In accordance with Market Notice 120153 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202411081520_confirmed] Prices for interval 08-Nov-2024 15:20 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1530 hrs on 8 November 2024
PRICES ARE NOW CONFIRMED for trading interval 08-Nov-2024 15:20.
In accordance with Market Notice 120152 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202411081515_confirmed] Prices for interval 08-Nov-2024 15:15 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1530 hrs on 8 November 2024
PRICES ARE NOW CONFIRMED for trading interval 08-Nov-2024 15:15.
In accordance with Market Notice 120151 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202411081505_confirmed] Prices for interval 08-Nov-2024 15:05 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1530 hrs on 8 November 2024
PRICES ARE NOW CONFIRMED for trading interval 08-Nov-2024 15:05.
In accordance with Market Notice 120147 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
Cancellation of a Non-Credible Contingency Event: Gordon - Chapel St No 1 220kV line and Gordon - Chapel St No 2 220kV line in TAS1 due to Lightning.
Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.
Region: TAS1
Lines: Gordon - Chapel St No 1 220kV and Gordon - Chapel St No 2 220kV
Cancellation time: 08/11/2024 14:09
Constraint set(s) revoked:
F-T-CSGO Constraint set contains the following interconnector(s) on the left hand side:
T-V-MNSP1
T-CSGO_N-2 Constraint set contains the following interconnector(s) on the left hand side:
NONE
Refer AEMO Electricity Market Notice 120144
Auto-generated on behalf of Manager NEM Real Time Operations