Filter by category
Filter by Date
[EventId:202402100930_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 10 February 2024 09:30
Issued by Australian Energy Market Operator Ltd at 0930 hrs on 10 February 2024
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 10 February 2024.
Refer to market notice: 114463
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 0930 hrs on 10 February 2024.
This is an AEMO autogenerated Market Notice.
[EventId:202402100805_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 10 February 2024 08:05
Issued by Australian Energy Market Operator Ltd at 0805 hrs on 10 February 2024
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 10 February 2024.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 0805 hrs on 10 February 2024.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:202402091630_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 09 February 2024 16:30
Issued by Australian Energy Market Operator Ltd at 1630 hrs on 9 February 2024
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 9 February 2024.
Refer to market notice: 114454
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1630 hrs on 9 February 2024.
This is an AEMO autogenerated Market Notice.
STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 13/02/2024
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following periods:
1. From 1730 to 1800 hrs 13/02/2024.
The forecast capacity reserve requirement is 1612 MW.
The minimum capacity reserve available is 1517 MW.
2. From 1830 to 1900 hrs 13/02/2024.
The forecast capacity reserve requirement is 1703 MW.
The minimum capacity reserve available is 1656 MW.
AEMO Operations
[EventId:202402091335_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 09 February 2024 13:35
Issued by Australian Energy Market Operator Ltd at 1335 hrs on 9 February 2024
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 9 February 2024.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1335 hrs on 9 February 2024.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:202402091300_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 09 February 2024 13:00
Issued by Australian Energy Market Operator Ltd at 1300 hrs on 9 February 2024
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 9 February 2024.
Refer to market notice: 114452
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1300 hrs on 9 February 2024.
This is an AEMO autogenerated Market Notice.
[EventId:202402091035_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 09 February 2024 10:35
Issued by Australian Energy Market Operator Ltd at 1035 hrs on 9 February 2024
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 9 February 2024.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1035 hrs on 9 February 2024.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:202402081500_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 08 February 2024 15:00
Issued by Australian Energy Market Operator Ltd at 1500 hrs on 8 February 2024
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 8 February 2024.
Refer to market notice: 114439
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1500 hrs on 8 February 2024.
This is an AEMO autogenerated Market Notice.
STPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 13/02/2024
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 114378 s cancelled at 1400 hrs 08/02/2024.
No LOR condition is currently forecast in the STPASA period.
AEMO Operations