[EventId:201901241655_confirmed] Prices for interval 24-Jan-2019 16:55 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1529 hrs on 25 January 2019
PRICES ARE NOW CONFIRMED for dispatch interval 24-Jan-2019 16:55.
In accordance with Market Notice 66635 AEMO has reviewed this dispatch interval and determined that:
- Over-Constrained Dispatch has been resolved for this interval
Changed Prices ($/MWh)
TYPE
Region Original Adjusted
Price Price
ENERGY
VIC1 $9,666.67 $13,777.63
This is an AEMO autogenerated Market Notice.
[EventId:201901241640_confirmed] Prices for interval 24-Jan-2019 16:40 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1526 hrs on 25 January 2019
PRICES ARE NOW CONFIRMED for dispatch interval 24-Jan-2019 16:40.
In accordance with Market Notice 66632 AEMO has reviewed this dispatch interval and determined that:
- Over-Constrained Dispatch has been resolved for this interval
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:201901251450_NRM_VIC1_NSW1_stopped] NEGRES CONSTRAINT NRM_VIC1_NSW1 ceased operating from 25 January 2019 14:50
Issued by Australian Energy Market Operator Ltd at 1450 hrs on 25 January 2019
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to NSW - 25 January 2019.
Refer to market notice: 66810
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the VIC to NSW directional interconnector.
The negative residue constraint NRM_VIC1_NSW1 ceased operating at 1450 hrs on 25 January 2019.
This is an AEMO autogenerated Market Notice.
AEMO Intervention Event - Intervention price dispatch intervals - 25/01/2019
PDPASA - Update of the Forecast Lack of Reserve Level 1 (LOR1) in the Vic Region on 25/01/2019
The Forecast LOR1 condition in the Vic region advised in AEMO Electricity Market Notice No. 66745 has been updated at 1610 hrs to the following:
From 1600 hrs 25/01/2019 to 1700 hrs 25/01/01/2019
The contingency forecast capacity reserve requirementd is 1075 MW.
The minimum capacity reserve available is 760 MW.
Manager NEM Real Time Operations
PDPASA - Update of the Forecast Lack of Reserve Level 2 (LOR2) in the Vic Region on 25/01/2019
From 1400 hrs 25/01/2019 to 1530 hrs 25/01/2019.
The forecast capacity reserve requirement is 540 MW.
The minimum capacity reserve available is 223 MW.
AEMO is seeking a market response.
Manager NEM Real Time Operations
Cancellation of Actual (LOR3) condition in the Vic region - 25/01/2019
Cancellation of Actual (LOR3) condition in the Vic region - 25/01/2019
The Actual LOR3 Condition in the Vic region advised in AEMO Electricity Market Notice No.66768 is cancelled at 1350 hrs 25/01/219.
Manager NEM Real Time Operations
Reclassification of a Non-Credible Contingency Event: Hazelwood - Rowville No.1 220kV line and Hazelwood - Rowville No.2 220kV line in VIC1 due to Lightning.
Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.
Region: VIC1
Lines: Hazelwood - Rowville No.1 220kV and Hazelwood - Rowville No.2 220kV
Duration: 25/01/2019 13:36 until further notice
Constraint set(s) invoked:
V-HWRO_R_N-2 Constraint set contains the following interconnector(s) on the left hand side:
NONE
Auto-generated on behalf of Manager NEM Real Time Operations
Cancellation - Load Restoration Direction in the Vic Region - 25/01/2019
Cancellation - Load Restoration Direction in the Vic Region - 25/01/2019
Refer to AEMO Electricity Market Notice 66812
Direction to restore all shed load issued at 1350 hrs 25/01/2019
Manager NEM Real Time Operations