Non-credible contingency event more likely to occur due to existence of abnormal condition/s - Qld region.
Non-credible contingency event more likely to occur due to existence of abnormal condition/s - Qld region.
AEMO has identified that a non-credible contingency event is more likely to occur in the Darling Downs and Granite Belt and western parts of Southeast Coastal districts because of the existence of abnormal conditions, namely bushfires in the Qld region.
As at the time of this notice the criteria for reclassification of any non-credible contingency event have not been met, however there is a possibility of bushfires impacting multiple transmission elements in its vicinity.
Conditions can change rapidly and potentially impacted plant may change. Further notices will only be published to advise of any reclassification, or when the abnormal conditions have ceased to impact the likelihood of a non-credible event occurring.
Manager NEM Real Time Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the Qld Region on 12/03/2019
The Forecast LOR1 condition in the Qld region advised in AEMO Electricity Market Notice No. 67738 has been updated at 1410 hrs to the following:
From 1630 hrs 12/03/2019 to 1730 hrs 12/03/2019.
The contingency forecast capacity reserve requirement is 793 MW.
The minimum capacity reserve available is 739 MW.
Manager NEM Real Time Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the Qld Region on 12/03/2019
The Forecast LOR1 condition in the Qld region advised in AEMO Electricity Market Notice No. 67723 has been updated at 1240 hrs to the following:
From 1630 hrs 12/03/2019 to 1700 hrs 12/03/2019.
The contingency forecast capacity reserve requirement is 793 MW.
The minimum capacity reserve available is 788 MW.
Manager NEM Real Time Operations
RESERVE NOTICE MT PASA PUBLICATION 12 March 2019
Please note that MTPASA informs the market of potential reliability issues to allow the market to respond in the first instance, potentially avoiding the need for any market intervention or direction from AEMO.
For further information, please refer to:
https://www.aemo.com.au/Electricity/National-Electricity-Market-NEM/Data/Market-Management-System-MMS/Projected-Assessment-of-System-Adequacy
This notice supersedes Market Notice 67566 published on 05 March 2019.
Background
As part of a broader process of implementing the reliability standard, AEMO runs the Medium Term Projected Assessment of System Adequacy (MTPASA) process weekly to forecast expected unserved energy levels over a two year period. If the expected annual unserved energy exceeds the maximum level specified by the Reliability Standard, a Low Reserve Condition is identified.
For more information about how AEMO implements the reliability standard, please view the Reliability Standard Implementation Guidelines (RSIG) available on AEMO's website at
http://www.aemo.com.au/-/media/Files/Stakeholder_Consultation/Consultations/Electricity_Consultations/2016/EAAP/Reliability-Standard-Implementation-Guidelines.pdf
Forecasting
AEMO
[EventId:201903120705_confirmed] Prices for interval 12-Mar-2019 07:05 are now confirmed
Issued by Australian Energy Market Operator Ltd at 0725 hrs on 12 March 2019
PRICES ARE NOW CONFIRMED for dispatch interval 12-Mar-2019 07:05.
In accordance with Market Notice 67725 AEMO has reviewed this dispatch interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:201903120725_confirmed] Prices for interval 12-Mar-2019 07:25 are now confirmed
Issued by Australian Energy Market Operator Ltd at 0725 hrs on 12 March 2019
PRICES ARE NOW CONFIRMED for dispatch interval 12-Mar-2019 07:25.
In accordance with Market Notice 67730 AEMO has reviewed this dispatch interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:201903120720_confirmed] Prices for interval 12-Mar-2019 07:20 are now confirmed
Issued by Australian Energy Market Operator Ltd at 0725 hrs on 12 March 2019
PRICES ARE NOW CONFIRMED for dispatch interval 12-Mar-2019 07:20.
In accordance with Market Notice 67729 AEMO has reviewed this dispatch interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:201903120715_confirmed] Prices for interval 12-Mar-2019 07:15 are now confirmed
Issued by Australian Energy Market Operator Ltd at 0725 hrs on 12 March 2019
PRICES ARE NOW CONFIRMED for dispatch interval 12-Mar-2019 07:15.
In accordance with Market Notice 67728 AEMO has reviewed this dispatch interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:201903120710_confirmed] Prices for interval 12-Mar-2019 07:10 are now confirmed
Issued by Australian Energy Market Operator Ltd at 0725 hrs on 12 March 2019
PRICES ARE NOW CONFIRMED for dispatch interval 12-Mar-2019 07:10.
In accordance with Market Notice 67726 AEMO has reviewed this dispatch interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.