PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 30/10/2019
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following period:
From 1630 hrs 30/10/2019 to 1800 hrs 30/08/2019.
The forecast capacity reserve requirement is 1554 MW.
The minimum capacity reserve available is 1506 MW.
Manager NEM Real Time Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 30/10/2019
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 70790 is cancelled at 0800 hrs 30/10/2019.
Manager NEM Real Time Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 30/10/2019
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No.70789 has been updated at 0730 hrs to the following:
From 1130 hrs 30/10/2019 to 1200 hrs 30/10/2019
The contingency forecast capacity reserve requirement is 1320 MW.
The minimum capacity reserve available is 1225 MW.
Manager NEM Real Time Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 30/10/2019
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No.70781 has been updated at 0030 hrs to the following:
From 0900 hrs 30/10/2019 to 1230 hrs 30/10/2019
The contingency forecast capacity reserve requirementd is 1320 MW.
The minimum capacity reserve available is 813 MW.
From 1530 hrs 30/10/2019 to 1800 hrs 30/10/2019
The contingency forecast capacity reserve requirementd is 1536 MW.
The minimum capacity reserve available is 1421 MW.
Manager NEM Real Time Operations
STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 31/10/2019
AEMO ELECTRICITY MARKET NOTICE
The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 70784 is cancelled at 0030 hrs 30/10/2019.
[No LOR2 condition is currently forecast in the STPASA period.]
Manager NEM Real Time Operations
Inter-Regional Transfer limit variation - Directlink - NSW Region
Inter-Regional Transfer limit variation - Directlink - NSW Region
There has been an unplanned outage of the No 3 Leg of Directlink .
The following constraint set was invoked at 0015 hrs 30/10/2019.
N-X_MBTE_1
The constraint set contains the following interconnector on the left hand side.
N-Q-MNSP1
Refer AEMO Network Outage Scheduler (NOS) for further details.
Manager NEM Real Time Operations
Cancellation - Inter-regional transfer limit variation - Armidale-Koolkhan 966 132 kV Line - NSW region - 29/10/2019
At 1707 hrs 29/10/2019 there was a short notice outage of Armidale-Koolkhan 966 132 kV Line.
Line restored at 2233 hrs.
The following constraint set invoked from 1715 hrs to 2240 hrs29/10/2019
N-X_ARKK_CH_CB892A
This constraint set contains equations with the following interconnectors on the LHS.
N-Q-MNSP1
NSW1 - QLD1
Refer to the AEMO Network Outage Scheduler for further information.
Manager NEM Real Time Operations
Inter-regional transfer limit variation - Armidale-Koolkhan 966 132 kV Line - NSW region - 29/10/2019
At 1707 hrs 29/10/2019 there was a short notice outage of Armidale-Koolkhan 966 132 kV Line.
The following constraint set invoked at 1715 hrs 29/10/2019
N-X_ARKK_CH_CB892A
This constraint set contains equations with the following interconnectors on the LHS.
N-Q-MNSP1
NSW1 - QLD1
Refer to the AEMO Network Outage Scheduler for further information.
Manager NEM Real Time Operations
STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the New South Wales Region on 31/10/2019
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following period:
From 1700 hrs to 1730 hrs 31/10/2019.
The forecast capacity reserve requirement is 1126 MW.
The minimum capacity reserve available is 1120 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
Danushka Sooriyadasa
AEMO Operations