Filter by category
Filter by Date
Possible intervention to manage power system security in South Australia (SA) Region
The synchronous generating units expected to be synchronised in SA from 0100 hrs 19/03/2020 to 1530 hrs 19/03/2020 in Pre-dispatch published at 1500 hrs 18/03/2020 are inadequate to maintain sufficient system strength in SA and hence a secure operating state.
AEMO currently estimates that, in the absence of sufficient market response by 1800 hrs 18/03/2020, AEMO may need to intervene by issuing a direction requiring one or more SA synchronous generating unit(s) to operate or remain synchronised to maintain power system security in SA.
Manager NEM Real Time Operations
Cancellation of a Non-Credible Contingency Event: Hazelwood - Rowville No.1 220kV line and Hazelwood - Rowville No.2 220kV line in VIC1 due to Lightning.
Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.
Region: VIC1
Lines: Hazelwood - Rowville No.1 220kV and Hazelwood - Rowville No.2 220kV
Cancellation time: 17/03/2020 22:09
Constraint set(s) revoked:
V-HWRO_R_N-2 Constraint set contains the following interconnector(s) on the left hand side:
NONE
Refer AEMO Electricity Market Notice 74969
Auto-generated on behalf of Manager NEM Real Time Operations
Reclassification of a Non-Credible Contingency Event: Hazelwood - Rowville No.1 220kV line and Hazelwood - Rowville No.2 220kV line in VIC1 due to Lightning.
Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.
Region: VIC1
Lines: Hazelwood - Rowville No.1 220kV and Hazelwood - Rowville No.2 220kV
Duration: 17/03/2020 21:07 until further notice
Constraint set(s) invoked:
V-HWRO_R_N-2 Constraint set contains the following interconnector(s) on the left hand side:
NONE
Auto-generated on behalf of Manager NEM Real Time Operations
Cancellation - AEMO Intervention Event - Intervention price dispatch intervals - Direction SA region 16/03/2020
Refer Market Notices 74965
The AEMO Intervention Event and all associated directions are cancelled from 1330 hrs 17/03/2020.
Manager NEM Real Time Operations
RESERVE NOTICE MT PASA PUBLICATION 17 March 2020
Please note that MTPASA informs the market of potential reliability issues to allow the market to respond in the first instance, potentially avoiding the need for any market intervention or direction from AEMO.
For further information, please refer to:
https://www.aemo.com.au/Electricity/National-Electricity-Market-NEM/Data/Market-Management-System-MMS/Projected-Assessment-of-System-Adequacy
This notice supersedes Market Notice 74862 published on 10 March 2020.
Background
As part of a broader process of implementing the reliability standard, AEMO runs the Medium Term Projected Assessment of System Adequacy (MTPASA) process weekly to forecast expected unserved energy levels over a two year period. If the expected annual unserved energy exceeds the maximum level specified by the Reliability Standard, a Low Reserve Condition is identified.
For more information about how AEMO implements the reliability standard, please view the Reliability Standard Implementation Guidelines (RSIG) available on AEMO's website at
https://www.aemo.com.au/Electricity/National-Electricity-Market-NEM/Planning-and-forecasting/Reliability-Standard-Implementation-Guidelines
Forecasting
AEMO
Direction - SA Region - 16/03/2020
In accordance with section 116 of the National Electricity Law, AEMO has issued a direction to a participant in the SA region. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a).
The direction was necessary to maintain the power system in a secure operating state.
AEMO may issue or revoke additional directions in order to meet the current requirement, unless sufficient market response is provided. A further market notice will be issued when all directions related to this requirement have been cancelled.
The issue of the direction commences an AEMO intervention event.
AEMO declares all dispatch intervals during the event to be intervention dispatch intervals, commencing from the interval ending 1610 hrs on 16/03/2020.
Intervention pricing does not apply to this AEMO intervention event.
Manager NEM Real Time Operations
Cancellation - AEMO Intervention Event - Intervention price dispatch intervals - Direction SA region 12/03/2020
Refer Market Notices 74885
The AEMO Intervention Event and all associated directions are cancelled from 1300 hrs 16/03/2020.
Manager NEM Real Time Operations
Update - Possible intervention to manage power system security in South Australia (SA) Region
Possible intervention to manage power system security in South Australia (SA) Region
The synchronous generating units expected to be synchronised in SA from 0400 hrs 17 Mar 2020 to 1230 hrs 17 Mar 2020 in Pre-dispatch published at 1030 hrs 16 Mar 2020 are inadequate to maintain sufficient system strength in SA and hence a secure operating state.
AEMO currently estimates that, in the absence of sufficient market response by 1700 hrs 16 Mar 2020, AEMO may need to intervene by issuing a direction requiring one or more SA synchronous generating unit(s) to operate or remain synchronised to maintain power system security in SA.
Manager NEM Real Time Operations
CHG0058447: Maintenance activity - STTM PreProduction System
Notification Type: Initial
Change Type: Normal
Service/ Component: Short Term Trading Market
Change Title: Maintenance activity - STTM PreProduction Systems
Change Start Date & Time: 18/03/2020 09:00:00 AEST
Change End Date & Time: 18/03/2020 17:00:00 AEST
Outage Start Date & Time: 18/03/2020 09:00:00 AEST
Outage End Date & Time: 18/03/2020 17:00:00 AEST
Change Description:
Maintenance activities to be performed on the pre-production Short Term Trading Market Systems.
Environment: Pre-Production
Participant Impact and Requirements:
All access to the pre-production Short Term Trading Market systems will be unavailable.
Support Information:
Report any impacts to the AEMO Information and Support Hub or on External 1300 236 600.