Power system disturbances

As per clause 3.8.1 of the WEM Rules, AEMO must investigate any incidents in the operation of equipment comprising the SWIS that:

a) endanger Power System Security or Power System Reliability to a significant   
           extent; or
b) causes significant disruption to the operation of the Central Dispatch Process                  set out in section 7.6; and
        c) AEMO considers have had, or had the potential to have had, a significant
            impact on the effectiveness of the market.