Retail Electricity Market Procedures October 2021 Consultation

02/03/2022
Market National Electricity Market
StageFinal Report
ConvenorAEMO NEM
Initiated06/12/2021
Accepting submissions?No
Submissions close21/12/2021

Process stage

  • Initial Notice
    8 October 2021
  • Closing Date for Submissions
    15 November 2021
  • Publication of Draft Determination
    6 December 2021
  • Closing Date for Submissions
    21 December 2021
  • Publication of Final Determination
    31 January 2022
  • Effective Date of Changes
    1 May 2022

AEMO has concluded its consultation on amendments to various Electricity Retail Market Procedures as a result of issues raised by industry proponents and AEMO. 

 

This consultation is being conducted as per the Rules consultation requirements in NER 8.9. Any queries should be directed to AEMO's NEM Retail Procedures Consultation email address, which is NEM.Retailprocedureconsultations@aemo.com.au.

 

Matter under consultation

Final report and determination

Procedure Implementation Date Version number  Status

B2B E-Hub Participant Accreditation and Revocation Process (B2B Process)

1 May 2022

1.4

Change-marked

Clean

MSATS Procedures: Consumer Administration and Transfer Solution Procedure Principles and Obligation (CATS Procedure)

1 May 2022

5.1

Change-marked

Clean

7 November 2022

5.3

Change-marked

Clean

MSATS Procedures: Procedure for the Management of Wholesale, Interconnector, Generator and Sample NMIS (WIGS Procedure)

1 May 2022

5.1

Change-marked

Clean

7 November 2022

5.3

Change-marked

Clean

Meter Data File Format (MDFF) Specification NEM12 & NEM13 (MDFF Specification)

1 May 2022

2.5

Change-marked

Clean

Metrology Procedure: Part A (Metrology Procedure Part A)

1 May 2022

7.4

Change-marked

Clean

Metrology Procedure: Part B (Metrology Procedure Part B)

1 May 2022

7.3

Change-marked

Clean

MSATS Procedures: MDM Procedures (MDM Procedures)

1 May 2022

4.3

Change-marked

Clean

NEM RoLR Processes Part A and Part B (RoLR Processes)

1 May 2022

2.3

Change-marked

Clean

Retail Electricity Market Procedures Glossary and Framework (Glossary and Framework)

1 May 2022

3.5

Change-marked

Clean

7 November 2022

3.7

Change-marked

Clean

Standing Data for MSATS (Standing Data document)

1 May 2022

5.11

Change-marked

Clean

7 November 2022

5.3

Change-marked

Clean

Second stage consultation documents

Date of publication: 6 December 2021 

AEMO invites comments on the proposed changes contained in the Draft Report. The changes which AEMO has made from the Issues Paper have been tracked in a different colour, in order to assist with legibility. Submissions must be made using the response template linked below and sent in PDF and .docx format to NEM.Retailprocedureconsultations@aemo.com.au. Submissions should be sent to AEMO by 5:00pm (Melbourne time) on Tuesday 21 December 2021.

The Procedures under consolidation and being consolidated are linked below:

Procedure Type of change Change proposal

 

B2B E-Hub Participant Accreditation and Revocation Process (B2B Process)

Amendment

CIP_045 B2B Accreditation Procedure Clarification

MSATS Procedures: Consumer Administration and Transfer Solution Procedure Principles and Obligation (CATS Procedure)

 

Amendment

 

Consolidation

CIP_050 NREG and GENERATR NMI Classifications

 

Versions 4.921-5.0 to be consolidated into version 5.1

MSATS Procedures: Procedure for the Management of Wholesale, Interconnector, Generator and Sample NMIS (WIGS Procedure)

Consolidation

Versions 4.921-5.0 to be consolidated into version 5.1

Meter Data File Format (MDFF) Specification NEM12 & NEM13 (MDFF Specification)

Amendment

CIP_042 Reason Codes

Metrology Procedure: Part A (Metrology Procedure Part A)

Amendment

 

Consolidation

CIP_046 Clarification of Metrology Part A Clause 12.5

CIP_048 Reference to AS60044

 

Versions 7.01-7.31 to be consolidated into version 7.4

Metrology Procedure: Part B (Metrology Procedure Part B)

Consolidation

Versions 7.021-7.21 consolidated into version 7.3

MSATS Procedures: MDM Procedures (MDM Procedures)

Consolidation

Versions 4.1-4.2 to be consolidated into version 4.3

NEM RoLR Processes Part A and Part B (RoLR Processes)

Consolidation

Versions 1.4-2.2 to be consolidated into version 2.3

Retail Electricity Market Procedures – Glossary and Framework (Glossary and Framework)

Consolidation

Versions 3.31-3.4.1 to be consolidated into version 3.5

Standing Data for MSATS (Standing Data document)

Amendment




 

Consolidation

CIP_049 Controlled Load Enumerations

 

CIP_053 GPS Coordinates Minimum Requirements

 

Connection configuration clarification

Versions 4.52-5.1 to be consolidated into version 5.11

First stage consultation documents 


AEMO invites comments on the proposed changes contained within the Notice of First Stage of Consultation and Issues Paper. Submissions should be forwarded to AEMO by
 5:00pm (Melbourne time) on Monday, 15 November 2021.

Submissions must be made using the response template linked below and sent to 
NEM.Retailprocedureconsultations@aemo.com.au.

Procedures may be made available in .rtf file formats on request. A summary of the proposed changes is available below:

Procedure Type of change Change proposal

 

B2B E-Hub Participant Accreditation and Revocation Process (B2B Process)

Amendment

CIP_045 B2B Accreditation Procedure Clarification

MSATS Procedures: Consumer Administration and Transfer Solution Procedure Principles and Obligation (CATS Procedure)

 

Amendment

 

Consolidation

CIP_050 NREG and GENERATR NMI Classifications

 

Versions 4.921-5.0 to be consolidated into version 5.1

MSATS Procedures: Procedure for the Management of Wholesale, Interconnector, Generator and Sample NMIS (WIGS Procedure)

Consolidation

Versions 4.921-5.0 to be consolidated into version 5.1

Meter Data File Format (MDFF) Specification NEM12 & NEM13 (MDFF Specification)

Amendment

CIP_042 Reason Codes

Metrology Procedure: Part A (Metrology Procedure Part A)

Amendment

 

Consolidation

CIP_046 Clarification of Metrology Part A Clause 12.5

CIP_048 Reference to AS60044

 

Versions 7.01-7.31 to be consolidated into version 7.4

Metrology Procedure: Part B (Metrology Procedure Part B)

Consolidation

Versions 7.021-7.21 consolidated into version 7.3

MSATS Procedures: MDM Procedures (MDM Procedures)

Consolidation

Versions 4.1-4.2 to be consolidated into version 4.3

NEM RoLR Processes Part A and Part B (RoLR Processes)

Consolidation

Versions 1.4-2.2 to be consolidated into version 2.3

Retail Electricity Market Procedures – Glossary and Framework (Glossary and Framework)

Consolidation

Versions 3.31-3.4.1 to be consolidated into version 3.5

Standing Data for MSATS (Standing Data document)

Amendment




 

Consolidation

CIP_049 Controlled Load Enumerations

 

CIP_053 GPS Coordinates Minimum Requirements

 

Connection configuration clarification

Versions 4.52-5.1 to be consolidated into version 5.11

X
Cookies help us improve your website experience.
By using our website, you agree to our use of cookies.
Confirm