Process stage
-
Initial Notice8 October 2021
-
Closing Date for Submissions15 November 2021
-
Publication of Draft Determination6 December 2021
-
Closing Date for Submissions21 December 2021
-
Publication of Final Determination31 January 2022
-
Effective Date of Changes1 May 2022
AEMO has concluded its consultation on amendments to various Electricity Retail Market Procedures as a result of issues raised by industry proponents and AEMO.
This consultation is being conducted as per the Rules consultation requirements in NER 8.9. Any queries should be directed to AEMO's NEM Retail Procedures Consultation email address, which is NEM.Retailprocedureconsultations@aemo.com.au.
Matter under consultation
Final report and determination
Procedure | Implementation Date | Version number | Status |
---|---|---|---|
B2B E-Hub Participant Accreditation and Revocation Process (B2B Process) |
1 May 2022 |
1.4 |
|
MSATS Procedures: Consumer Administration and Transfer Solution Procedure Principles and Obligation (CATS Procedure) |
1 May 2022 |
5.1 |
|
7 November 2022 |
5.3 |
||
MSATS Procedures: Procedure for the Management of Wholesale, Interconnector, Generator and Sample NMIS (WIGS Procedure) |
1 May 2022 |
5.1 |
|
7 November 2022 |
5.3 |
||
Meter Data File Format (MDFF) Specification NEM12 & NEM13 (MDFF Specification) |
1 May 2022 |
2.5 |
|
Metrology Procedure: Part A (Metrology Procedure Part A) |
1 May 2022 |
7.4 |
|
Metrology Procedure: Part B (Metrology Procedure Part B) |
1 May 2022 |
7.3 |
|
MSATS Procedures: MDM Procedures (MDM Procedures) |
1 May 2022 |
4.3 |
|
NEM RoLR Processes Part A and Part B (RoLR Processes) |
1 May 2022 |
2.3 |
|
Retail Electricity Market Procedures – Glossary and Framework (Glossary and Framework) |
1 May 2022 |
3.5 |
|
7 November 2022 |
3.7 |
||
Standing Data for MSATS (Standing Data document) |
1 May 2022 |
5.11 |
|
7 November 2022 |
5.3 |
Second stage consultation documents
Date of publication: 6 December 2021
AEMO invites comments on the proposed changes contained in the Draft Report. The changes which AEMO has made from the Issues Paper have been tracked in a different colour, in order to assist with legibility. Submissions must be made using the response template linked below and sent in PDF and .docx format to NEM.Retailprocedureconsultations@aemo.com.au. Submissions should be sent to AEMO by 5:00pm (Melbourne time) on Tuesday 21 December 2021.
The Procedures under consolidation and being consolidated are linked below:
Procedure | Type of change | Change proposal |
---|---|---|
B2B E-Hub Participant Accreditation and Revocation Process (B2B Process) |
Amendment |
CIP_045 B2B Accreditation Procedure Clarification |
|
Amendment
Consolidation |
CIP_050 NREG and GENERATR NMI Classifications
Versions 4.921-5.0 to be consolidated into version 5.1 |
Consolidation |
Versions 4.921-5.0 to be consolidated into version 5.1 |
|
Meter Data File Format (MDFF) Specification NEM12 & NEM13 (MDFF Specification) |
Amendment |
CIP_042 Reason Codes |
Amendment
Consolidation |
CIP_046 Clarification of Metrology Part A Clause 12.5 CIP_048 Reference to AS60044
Versions 7.01-7.31 to be consolidated into version 7.4 |
|
Consolidation |
Versions 7.021-7.21 consolidated into version 7.3 |
|
Consolidation |
Versions 4.1-4.2 to be consolidated into version 4.3 |
|
Consolidation |
Versions 1.4-2.2 to be consolidated into version 2.3 |
|
Retail Electricity Market Procedures – Glossary and Framework (Glossary and Framework) |
Consolidation |
Versions 3.31-3.4.1 to be consolidated into version 3.5 |
Amendment
Consolidation |
CIP_049 Controlled Load Enumerations
CIP_053 GPS Coordinates Minimum Requirements
Connection configuration clarification Versions 4.52-5.1 to be consolidated into version 5.11 |
First stage consultation submissions
-
29/11/2021
AGL
368.79 KB -
29/11/2021
Ausnet Services
244.1 KB -
29/11/2021
Citipower Powercor
309.2 KB -
29/11/2021
Endeavour Energy
829.44 KB -
29/11/2021
Energy Queensland
340.99 KB -
29/11/2021
Ergon Energy, Energex and Yurika Metering
265.43 KB -
29/11/2021
EvoEnergy
195.16 KB -
29/11/2021
Jemena
258.12 KB -
29/11/2021
Origin Energy
265.34 KB -
29/11/2021
PLUS ES
434.27 KB -
29/11/2021
Red Energy and Lumo Energy
74.38 KB -
29/11/2021
South Australia Power Networks
250.31 KB -
29/11/2021
United Energy
309.32 KB -
29/11/2021
Vector Metering
922.72 KB
First stage consultation documents
AEMO invites comments on the proposed changes contained within the Notice of First Stage of Consultation and Issues Paper. Submissions should be forwarded to AEMO by 5:00pm (Melbourne time) on Monday, 15 November 2021.
Submissions must be made using the response template linked below and sent to NEM.Retailprocedureconsultations@aemo.com.au.
Procedures may be made available in .rtf file formats on request. A summary of the proposed changes is available below:
Procedure | Type of change | Change proposal |
---|---|---|
B2B E-Hub Participant Accreditation and Revocation Process (B2B Process) |
Amendment |
CIP_045 B2B Accreditation Procedure Clarification |
|
Amendment
Consolidation |
CIP_050 NREG and GENERATR NMI Classifications
Versions 4.921-5.0 to be consolidated into version 5.1 |
Consolidation |
Versions 4.921-5.0 to be consolidated into version 5.1 |
|
Meter Data File Format (MDFF) Specification NEM12 & NEM13 (MDFF Specification) |
Amendment |
CIP_042 Reason Codes |
Amendment
Consolidation |
CIP_046 Clarification of Metrology Part A Clause 12.5 CIP_048 Reference to AS60044
Versions 7.01-7.31 to be consolidated into version 7.4 |
|
Consolidation |
Versions 7.021-7.21 consolidated into version 7.3 |
|
Consolidation |
Versions 4.1-4.2 to be consolidated into version 4.3 |
|
Consolidation |
Versions 1.4-2.2 to be consolidated into version 2.3 |
|
Retail Electricity Market Procedures – Glossary and Framework (Glossary and Framework) |
Consolidation |
Versions 3.31-3.4.1 to be consolidated into version 3.5 |
Amendment
Consolidation |
CIP_049 Controlled Load Enumerations
CIP_053 GPS Coordinates Minimum Requirements
Connection configuration clarification Versions 4.52-5.1 to be consolidated into version 5.11 |