125550POWER SYSTEM EVENTS12/03/2025 09:47:07 AM

Update - Non-credible contingency event - TAS region - 12/03/2025

AEMO ELECTRICITY MARKET NOTICE.

Update - Non-credible contingency event - TAS region - 12/03/2025

Refer AEMO Electricity Market Notice 125548

At 09:29 hrs the Burnie - Smithton Tee Port Latta No. 1 110kV Line and the Burnie - Smithton Tee Port Latta No. 2 110kV Line tripped and auto-reclosed (2nd event).

The cause of this non credible contingency event is not known at this stage.
AEMO is not satisfied that this non credible event is unlikely to re-occur.
AEMO has therefore reclassified this event as a credible contingency event until further notice.

Region: TAS

Elements: Burnie - Smithton Tee Port Latta No. 1 110kV Line and Burnie - Smithton Tee Port Latta No. 2 110kV Line
Duration: 0940 hrs 12/03/2025 until further notice
Constraint set(s) invoked: Nil

Manager NEM Real Time Operations
     
125548POWER SYSTEM EVENTS12/03/2025 09:46:32 AM

Non-credible contingency event - TAS region - 12/03/2025

AEMO ELECTRICITY MARKET NOTICE.

Non-credible contingency event - TAS region - 12/03/2025

At 0909 hrs the Burnie -Smithton Tee Port Latta No. 1 110kV Line and the Burnie -Smithton Tee Port Latta No. 2 110kV Line tripped and auto-reclosed.

AEMO did not instruct load shedding.

AEMO has not been advised of any disconnection of bulk electrical load.

The cause of this non credible contingency event is not known at this stage.


Manager NEM Real Time Operations
     
125524GENERAL NOTICE11/03/2025 01:51:14 PM

NEM Local Temperature Alerts for SA, VIC from 11 Mar 2025 to 15 Mar 2025

AEMO ELECTRICITY MARKET NOTICE

AEMO's weather service provider has issued forecast temperatures equal to or greater than the NEM Local Temperature Alert Levels for listed weather stations below.

SA
Port Augusta Ap (39+ Deg C): 14th Mar, 15th Mar

VIC
Latrobe Valley Ap (39+ Deg C): 15th Mar
Mildura Ap (39+ Deg C): 14th Mar, 15th Mar

The NEM Local Temperature Alert Levels are:

Launceston Ti Tree Bend: 33 Deg C, Dalby Airport: 37 Deg C, for all other selected weather stations: 39 Deg C.

AEMO requests Market Participants to:

1. review the weather forecast in the local area where their generating units / MNSP converter stations are located and,

2. if required, update the available capacity in their dispatch offers or availability submissions consistent with the forecast temperatures.

Further information is available at:

https://aemo.com.au/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-reliability/projected-assessment-of-system-adequacy/nem-local-temperature-alerts

AEMO Operations Planning
     
125517POWER SYSTEM EVENTS11/03/2025 10:05:23 AM

Non-credible contingency event - SA region - 11/03/2025

AEMO ELECTRICITY MARKET NOTICE.

Non-credible contingency event - SA region - 11/03/2025

At 0917 hrs the Penola West - South East 132 kV line and the Kincraig - Penola West 132 kV line tripped.

AEMO did not instruct load shedding.

Approximately 3 MW of electrical load has been disconnected.

The cause of this non credible contingency event is not known at this stage.

Manager NEM Real Time Operations
     
125507PRICES SUBJECT TO REVIEW11/03/2025 08:15:17 AM

[EventId:202503110820_review] Prices for interval 11-Mar-2025 08:20 are subject to review

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 0815 hrs on 11 March 2025

PRICES ARE SUBJECT TO REVIEW for trading interval 11-Mar-2025 08:20.

AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs


This is an AEMO autogenerated Market Notice.
     
125506PRICES SUBJECT TO REVIEW11/03/2025 08:10:17 AM

[EventId:202503110815_review] Prices for interval 11-Mar-2025 08:15 are subject to review

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 0810 hrs on 11 March 2025

PRICES ARE SUBJECT TO REVIEW for trading interval 11-Mar-2025 08:15.

AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs


This is an AEMO autogenerated Market Notice.
     
125505PRICES SUBJECT TO REVIEW11/03/2025 08:05:18 AM

[EventId:202503110810_review] Prices for interval 11-Mar-2025 08:10 are subject to review

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 0805 hrs on 11 March 2025

PRICES ARE SUBJECT TO REVIEW for trading interval 11-Mar-2025 08:10.

AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs


This is an AEMO autogenerated Market Notice.
     
125504PRICES SUBJECT TO REVIEW11/03/2025 08:00:21 AM

[EventId:202503110805_review] Prices for interval 11-Mar-2025 08:05 are subject to review

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 0800 hrs on 11 March 2025

PRICES ARE SUBJECT TO REVIEW for trading interval 11-Mar-2025 08:05.

AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs


This is an AEMO autogenerated Market Notice.
     
125503PRICES SUBJECT TO REVIEW11/03/2025 07:55:17 AM

[EventId:202503110800_review] Prices for interval 11-Mar-2025 08:00 are subject to review

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 0755 hrs on 11 March 2025

PRICES ARE SUBJECT TO REVIEW for trading interval 11-Mar-2025 08:00.

AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs


This is an AEMO autogenerated Market Notice.
     