Filter by category
Filter by Date
Cancellation - AEMO Intervention Event - SA region 07/01/2025
Cancellation - AEMO Intervention Event - SA region 07/01/2025
Refer to Market Notice 122948
The AEMO Intervention Event and all associated directions are cancelled from 1500 hrs on 08/01/2025.
Manager NEM Real Time Operations
Cancellation: Direction issued to: Pelican Point Power Limited - PPCCGT PELICAN POINT
Cancellation: Direction issued to: Pelican Point Power Limited - PPCCGT PELICAN POINT
Refer to Market Notice 122957
Direction is cancelled from: 1500 hrs 08/01/2025
Manager NEM Real Time Operations
Foreseeable AEMO intervention in SA region
Foreseeable AEMO intervention in SA region
AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 0930 hrs 09/01/2025.
The foreseeable circumstance requiring the need for intervention is Voltage.
AEMO estimates that, in the absence of sufficient market response by 1600 hrs 08/01/2025, AEMO may need to intervene by issuing a direction.
Manager NEM Real Time Operations
[EventId:202501081330_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 08 January 2025 13:30
Issued by Australian Energy Market Operator Ltd at 1330 hrs on 8 January 2025
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 8 January 2025.
Refer to market notice: 122960
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1330 hrs on 8 January 2025.
This is an AEMO autogenerated Market Notice.
[EventId:202501081200_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 08 January 2025 12:00
Issued by Australian Energy Market Operator Ltd at 1200 hrs on 8 January 2025
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 8 January 2025.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1200 hrs on 8 January 2025.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:202501081100_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 08 January 2025 11:00
Issued by Australian Energy Market Operator Ltd at 1100 hrs on 8 January 2025
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 8 January 2025.
Refer to market notice: 122958
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1100 hrs on 8 January 2025.
This is an AEMO autogenerated Market Notice.
[EventId:202501080800_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 08 January 2025 08:00
Issued by Australian Energy Market Operator Ltd at 0800 hrs on 8 January 2025
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 8 January 2025.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 0800 hrs on 8 January 2025.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
Update Direction - Pelican Point Power Limited - PPCCGT PELICAN POINT
Update Direction - Pelican Point Power Limited - PPCCGT PELICAN POINT
Refer to Market Notice 122949
PPCCGT PELICAN POINT at 0800 hrs 08/01/2025 to Remain synchronised and follow dispatch targets.
The PPCCGT PELICAN POINT direction is expected to stay in place until 1500 hrs 08/01/2025.
The direction update is issued at 0650 hrs 08/01/2025.
Manager NEM Real Time Operations
Cancellation - AEMO Intervention Event - SA region 05/01/2025
Cancellation - AEMO Intervention Event - SA region 05/01/2025
Refer to Market Notice 122859
The AEMO Intervention Event and all associated directions are cancelled from 0400 hrs on 08/01/2025.
Manager NEM Real Time Operations