124224RESERVE NOTICE05/02/2025 10:19:55 PM

PDPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 06/02/2025

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following Period:


[1.] From 1730 hrs 06/02/2025 to 1930 hrs 06/02/2025.
The forecast capacity reserve requirement is 926 MW.
The minimum capacity reserve available is 692 MW.


AEMO is seeking a market response.

AEMO has not yet estimated the latest time at which it would need to intervene through an AEMO intervention event.


Manager NEM Real Time Operations
     
124221RESERVE NOTICE05/02/2025 09:42:25 PM

STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 07/02/2025

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 124183 has been updated at 2133 hrs 05/02/2025 to the following:

From 1730 hrs 07/02/2025 to 1900 hrs 07/02/2025.
The forecast capacity reserve requirement is 1163 MW.
The minimum capacity reserve available is 1108 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.

AEMO Operations
     
124219RESERVE NOTICE05/02/2025 08:37:04 PM

Cancellation of Actual (LOR1) condition in the NSW region - 05/02/2025

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR1) condition in the NSW region - 05/02/2025

The Actual LOR1 Condition in the NSW Region advised in AEMO Electricity Market Notice No.124200 is cancelled at 2019 hrs 05/02/2025.

Manager NEM Real Time Operations
     
124218SETTLEMENTS RESIDUE05/02/2025 07:59:38 PM

[EventId:202502051955_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 05 February 2025 19:55

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1955 hrs on 5 February 2025

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 5 February 2025.

Refer to market notice: 124197

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.

The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1955 hrs on 5 February 2025.

This is an AEMO autogenerated Market Notice.
     
124204MARKET INTERVENTION05/02/2025 06:16:14 PM

Direction - SA region 05/02/2025

AEMO ELECTRICITY MARKET NOTICE

Direction - SA region 05/02/2025

In accordance with section 116 of the National Electricity Law, AEMO has issued a direction to a participant in the SA region. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a1)(1).

The issue of the direction commences an AEMO intervention event. AEMO declares all trading intervals during the event to be intervention trading intervals, commencing from the interval ending 1605 hrs on 05/02/2025.

Intervention pricing does not apply to this AEMO intervention event.

AEMO may issue or revoke additional directions in order to meet the current requirement, unless sufficient market response is provided. A further market notice will be issued when all directions related to this requirement have been cancelled.

Market Notice 124182 will now fall under this direction event.

Manager NEM Real Time Operations
     
124200RESERVE NOTICE05/02/2025 05:52:02 PM

Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 05/02/2025

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 05/02/2025

An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the NSW region from 1730 hrs.
The Actual LOR1 condition is forecast to exist until 1900 hrs

The capacity reserve requirement is 1430 MW
The minimum capacity reserve available is 1214 MW

Manager NEM Real Time Operations
     
124197SETTLEMENTS RESIDUE05/02/2025 05:38:07 PM

[EventId:202502051735_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 05 February 2025 17:35

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1735 hrs on 5 February 2025

ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 5 February 2025.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.

The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1735 hrs on 5 February 2025.

This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
     
124189MARKET INTERVENTION05/02/2025 04:36:17 PM

Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB4 TORRENS ISLAN

AEMO ELECTRICITY MARKET NOTICE

Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB4 TORRENS ISLAN

Refer to Market Notice 124165

Direction is cancelled from: 1630 hrs 05/02/2025

Manager NEM Real Time Operations
     
124185SETTLEMENTS RESIDUE05/02/2025 03:45:20 PM

[EventId:202502051545_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 05 February 2025 15:45

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1545 hrs on 5 February 2025

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 5 February 2025.

Refer to market notice: 124174

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.

The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1545 hrs on 5 February 2025.