Filter by category
Filter by Date
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 15/01/2025
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following Period:
[1.] From 1730 hrs 15/01/2025 to 1800 hrs 15/01/2025.
The forecast capacity reserve requirement is 1765 MW.
The minimum capacity reserve available is 1739 MW.
Manager NEM Real Time Operations
NON-CONFORMANCE Region QLD1 Wednesday, 15 January 2025
NON-CONFORMANCE QLD1 Region Wednesday, 15 January 2025
AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:
Unit: MPP_2
Duration: 15/01/2025 02:40 to 15/01/2025 05:15
Amount: -28 MW
Constraint: NC-Q_MPP_2
Auto-generated on behalf of Manager NEM Real Time Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 15/01/2025
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 123206 is cancelled at 0450 hrs 15/01/2025.
Manager NEM Real Time Operations
NON-CONFORMANCE Region QLD1 Wednesday, 15 January 2025
NON-CONFORMANCE QLD1 Region Wednesday, 15 January 2025
AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:
Unit: MPP_2
Duration: 15/01/2025 01:45 to 15/01/2025 02:05
Amount: 32 MW
Constraint: NC-Q_MPP_2
Auto-generated on behalf of Manager NEM Real Time Operations
NON-CONFORMANCE Region QLD1 Wednesday, 15 January 2025
NON-CONFORMANCE QLD1 Region Tuesday, 14 January 2025
AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:
Unit: MPP_1
Duration: 14/01/2025 23:05 to 15/01/2025 00:05
Amount: 17 MW
Constraint: NC-Q_MPP_1
Auto-generated on behalf of Manager NEM Real Time Operations
[EventId:202501141925_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 14 January 2025 19:25
Issued by Australian Energy Market Operator Ltd at 1925 hrs on 14 January 2025
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 14 January 2025.
Refer to market notice: 123223
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1925 hrs on 14 January 2025.
This is an AEMO autogenerated Market Notice.
Cancellation of Actual (LOR1) condition in the NSW region - 14/01/2025
Cancellation of Actual (LOR1) condition in the NSW region - 14/01/2025
The Actual LOR1 Condition in the NSW Region advised in AEMO Electricity Market Notice No.123221 is cancelled at 1845 hrs 14/01/2025.
Manager NEM Real Time Operations
Update Direction - AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN
Update Direction - AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN
Refer to Market Notice 123215
TORRB3 TORRENS ISLAN at 0730 hrs 15/01/2025 to Remain synchronised and follow dispatch targets.
The TORRB3 TORRENS ISLAN direction is expected to stay in place until 0400 hrs 16/01/2025.
The direction update is issued at 1900 hrs 14/01/2025.
Manager NEM Real Time Operations
[EventId:202501141805_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 14 January 2025 18:05
Issued by Australian Energy Market Operator Ltd at 1805 hrs on 14 January 2025
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 14 January 2025.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1805 hrs on 14 January 2025.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.