123931INTER-REGIONAL TRANSFER30/01/2025 03:24:25 PM

Inter-Regional Transfer limit variation - Directlink - NSW Region

AEMO ELECTRICITY MARKET NOTICE

Inter-Regional Transfer limit variation - Directlink - NSW Region

There has been an unplanned outage of the No 2 Leg of Directlink .

The following constraint set was invoked at 1525 hrs 30/01/2025

N-X_MBTE_2

The constraint set contains the following interconnector on the left hand side.

N-Q-MNSP1

Refer AEMO Network Outage Scheduler (NOS) for further details.

Manager NEM Real Time Operations
     
123926RESERVE NOTICE30/01/2025 02:45:47 PM

STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the VIC Region on 03/02/2025

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the VIC region for the following period:

From 1630 hrs to 1830 hrs 03/02/2025.
The forecast capacity reserve requirement is 1130 MW.
The minimum capacity reserve available is 1022 MW.

AEMO Operations
     
123886RESERVE NOTICE29/01/2025 02:46:45 PM

STPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the VIC Region on 03/02/2025

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the VIC region advised in AEMO Electricity Market Notice No. 123813 is cancelled at 1400 hrs 29/01/2025.

No LOR condition is currently forecast in the STPASA period.

AEMO Operations
     
123885MARKET INTERVENTION29/01/2025 03:28:51 PM

Update Direction - Pelican Point Power Limited - PPCCGT PELICAN POINT

AEMO ELECTRICITY MARKET NOTICE.

Update Direction - Pelican Point Power Limited - PPCCGT PELICAN POINT

Refer to Market Notice 123811

PPCCGT PELICAN POINT at 0100 hrs 27/01/2025 to Remain synchronised and follow dispatch targets.

The PPCCGT PELICAN POINT direction is now expected to stay in place until 0400 hrs 31/01/2025.

The direction update is issued at 1500 hrs 29/01/2025.

Manager NEM Real Time Operations
     
123884MARKET INTERVENTION29/01/2025 03:22:31 PM

Update Direction - AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN

AEMO ELECTRICITY MARKET NOTICE.

Update Direction - AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN

Refer to Market Notice 123812

TORRB2 TORRENS ISLAN at 0030 hrs 27/01/2025 to Remain synchronised and follow dispatch targets.

The TORRB2 TORRENS ISLAN direction is now expected to stay in place until 0400 hrs 31/01/2025.

The direction update is issued at 1500 hrs 29/01/2025.

Manager NEM Real Time Operations
     
123858INTER-REGIONAL TRANSFER29/01/2025 10:16:37 AM

Inter-regional transfer limit variation - TIPS - Para 275kV Line- SA region - 29/01/2025

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - TIPS - Para 275kV Line - SA region - 29/01/2025

At 0930 hrs 29/01/2025 there was a short notice outage of TIPS - Para 275kV Line.

The following constraint set(s) invoked at 0930 hrs 29/01/2025
S-X_MGTI+PATI

This constraint set(s) contains equations with the following interconnectors on the LHS.
V-S-MNSP1,V-SA

Refer to the AEMO Network Outage Scheduler for further information.

Manager NEM Real Time Operations
     
123813RESERVE NOTICE28/01/2025 03:08:46 PM

STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the VIC Region on 03/02/2025

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the VIC region for the following period:

From 1630 hrs to 1900 hrs 03/02/2025.
The forecast capacity reserve requirement is 1148 MW.
The minimum capacity reserve available is 977 MW.

AEMO Operations
     
123812MARKET INTERVENTION28/01/2025 02:15:53 PM

Update Direction - AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN

AEMO ELECTRICITY MARKET NOTICE.

Update Direction - AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN

Refer to Market Notice 123761

TORRB2 TORRENS ISLAN at 0030 hrs 27/01/2025 to Remain synchronised and follow dispatch targets.

The TORRB2 TORRENS ISLAN direction is now expected to stay in place until 0400 hrs 30/01/2025.

The direction update is issued at 1410 hrs 28/01/2025.

Manager NEM Real Time Operations
     
123811MARKET INTERVENTION28/01/2025 02:09:48 PM

Update Direction - Pelican Point Power Limited - PPCCGT PELICAN POINT

AEMO ELECTRICITY MARKET NOTICE.

Update Direction - Pelican Point Power Limited - PPCCGT PELICAN POINT

Refer to Market Notice 123762

PPCCGT PELICAN POINT at 0100 hrs 27/01/2025 to Remain synchronised and follow dispatch targets.

The PPCCGT PELICAN POINT direction is now expected to stay in place until 0400 hrs 30/01/2025.

The direction update is issued at 1410 hrs 28/01/2025.