122435NON-CONFORMANCE23/12/2024 09:40:24 AM

NON-CONFORMANCE Region QLD1 Monday, 23 December 2024

AEMO ELECTRICITY MARKET NOTICE

NON-CONFORMANCE QLD1 Region Monday, 23 December 2024

AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:

Unit: MPP_2
Duration: 23/12/2024 09:25 to 23/12/2024 09:40
Amount: 36 MW
Constraint: NC-Q_MPP_2

Auto-generated on behalf of Manager NEM Real Time Operations
     
122405MINIMUM SYSTEM LOAD22/12/2024 02:33:38 PM

Cancellation of Actual Minimum System Load (MSL) MSL1 event in the VIC Region on 22/12/2024.

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual Minimum System Load (MSL) MSL1 event in the VIC Region on 22/12/2024.

Cancellation - Actual MSL1- VIC Region at 1430 hrs 22/12/2024.

Refer to Market Notice 122399for MSL1.

Manager NEM Real Time Operations
     
122399MINIMUM SYSTEM LOAD22/12/2024 11:16:27 AM

Actual Minimum System Load MSL1 condition in the VIC Region on 22/12/2024

AEMO ELECTRICITY MARKET NOTICE
Actual Minimum System Load MSL1 condition in the VIC Region on 22/12/2024

Update to Market Notice 122377 - AEMO has detected that there is an elevated risk of insufficient demand to maintain a secure operating state in the VIC on 22/12/2024.

Minimum regional demand is forecast to be 1409 MW at 1300 hrs, and the advisory threshold is:
- MSL1 - 1760 MW
- MSL2 - 1260 MW
- MSL3 - 760 MW

The regional demand is below the MSL1 threshold. The actual MSL1 condition is forecast to exist until 1430 hrs.

Manager NEM Real Time Operations
     
122395MINIMUM SYSTEM LOAD22/12/2024 10:21:55 AM

Cancellation of Forecast Minimum System Load (MSL) MSL2 event in the VIC Region on 22/12/2024.

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Forecast Minimum System Load (MSL) MSL2 event in the VIC Region on 22/12/2024.

Cancellation - Forecast MSL2- VIC Region at 1015 hrs 22/12/2024.

Refer to Market Notice 122385 for MSL2.

Manager NEM Real Time Operations
     
122385MINIMUM SYSTEM LOAD21/12/2024 10:18:10 PM

Forecast Minimum System Load MSL2 condition in the VIC Region on 22/12/2024

AEMO ELECTRICITY MARKET NOTICE
Forecast Minimum System Load MSL2 condition in the VIC Region on 22/12/2024

AEMO has detected that there is an elevated risk of insufficient demand to maintain a secure operating state in the VIC on 22/12/2024.

Minimum System Load (MSL) conditions are forecast when regional demand is less than the relevant MSL threshold. The advisory MSL thresholds are:
- MSL1 - 1790 MW
- MSL2 - 1290 MW
- MSL3 - 790 MW

The regional demand is forecast to be below the MSL2 threshold for the following period[s]:
- From 1200 hrs 22/12/2024 to 1330 hrs 22/12/2024. Minimum regional demand is forecast to be 1219 MW at 1300 hrs.

Forecast regional demand (DEMAND50) is published in Short Term and Pre-Dispatch PASA region solution reports available on Market Data NEMWEB: https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/data-nem/market-data-nemweb .


Manager NEM Real Time Operations
     
122378MINIMUM SYSTEM LOAD21/12/2024 04:16:44 PM

Cancellation of Forecast Minimum System Load (MSL) MSL2 event in the VIC Region on 22/12/2024.

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Forecast Minimum System Load (MSL) MSL2 event in the VIC Region on 22/12/2024.

Cancellation - Forecast MSL2- VIC Region at 1615 hrs 22/12/2024.

Refer to Market Notice 122369 for MSL2.

Manager NEM Real Time Operations
     
122377MINIMUM SYSTEM LOAD21/12/2024 04:15:17 PM

Forecast Minimum System Load MSL1 condition in the VIC Region on 22/12/2024

AEMO ELECTRICITY MARKET NOTICE
Forecast Minimum System Load MSL1 condition in the VIC Region on 22/12/2024

Update to Market Notice 122271 - AEMO has detected that there is an elevated risk of insufficient demand to maintain a secure operating state in the VIC on 22/12/2024.

Minimum System Load (MSL) conditions are forecast when regional demand is less than the relevant MSL threshold. The advisory MSL thresholds are:
- MSL1 - 1825 MW
- MSL2 - 1325 MW
- MSL3 - 825 MW

The regional demand is forecast to be below the MSL1 threshold for the following period[s]:
- From 1030 hrs 22/12/2024 to 1430 hrs 22/12/2024. Minimum regional demand is forecast to be 1335 MW at 1300 hrs.

Forecast regional demand (DEMAND50) is published in Short Term and Pre-Dispatch PASA region solution reports available on Market Data NEMWEB: https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/data-nem/market-data-nemweb .

Manager NEM Real Time Operations
     
122369MINIMUM SYSTEM LOAD21/12/2024 02:45:39 PM

Forecast Minimum System Load MSL2 condition in the VIC Region on 22/12/2024

AEMO ELECTRICITY MARKET NOTICE
Forecast Minimum System Load MSL2 condition in the VIC Region on 22/12/2024

Update to Market Notice 122341 - AEMO has detected that there is an elevated risk of insufficient demand to maintain a secure operating state in the VIC on 22/12/2024.

Minimum System Load (MSL) conditions are forecast when regional demand is less than the relevant MSL threshold. The advisory MSL thresholds are:
- MSL1 - 1825 MW
- MSL2 - 1325 MW
- MSL3 - 825 MW

The regional demand is forecast to be below the MSL2 threshold for the following period[s]:
- From 1230 hrs 22/12/2024 to 1300 hrs 22/12/2024. Minimum regional demand is forecast to be 1314 MW at 1300 hrs.


Forecast regional demand (DEMAND50) is published in Short Term and Pre-Dispatch PASA region solution reports available on Market Data NEMWEB: https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/data-nem/market-data-nemweb .

AEMO is seeking a market response.


Manager NEM Real Time Operations
     
122359PRICES SUBJECT TO REVIEW21/12/2024 01:10:17 PM

[EventId:202412211315_review] Prices for interval 21-Dec-2024 13:15 are subject to review

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1310 hrs on 21 December 2024

PRICES ARE SUBJECT TO REVIEW for trading interval 21-Dec-2024 13:15.

AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs