Market Notices

125703SETTLEMENTS RESIDUE16/03/2025 01:05:25 PM

[EventId:202503161305_NRM_VIC1_SA1_started] NEGRES CONSTRAINT NRM_VIC1_SA1 started operating from 16 March 2025 13:05

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1305 hrs on 16 March 2025

ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 16 March 2025.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the VIC to SA directional interconnector.

The negative residue constraint set NRM_VIC1_SA1 commenced operating from 1305 hrs on 16 March 2025.

This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
     
125700RESERVE NOTICE16/03/2025 10:53:53 AM

PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 16/03/2025

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 125698 has been updated at1045 hrs to the following:

[1.] From 1600 hrs 16/03/2025 to 1700 hrs 16/03/2025.
The forecast capacity reserve requirement is 1370 MW.
The minimum capacity reserve available is 725 MW.

[2.] From 1830 hrs 16/03/2025 to 2000 hrs 16/03/2025.
The forecast capacity reserve requirement is 1817 MW.
The minimum capacity reserve available is 1159 MW.

Manager NEM Real Time Operations
     
125698RESERVE NOTICE16/03/2025 09:29:05 AM

PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 16/03/2025

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 125696 has been updated to the following:

[1.] From 1600 hrs 16/03/2025 to 1730 hrs 16/03/2025.
The forecast capacity reserve requirement is 1400 MW.
The minimum capacity reserve available is 774 MW.

[2.] From 1800 hrs 16/03/2025 to 1930 hrs 16/03/2025.
The forecast capacity reserve requirement is 1844 MW.
The minimum capacity reserve available is 1154 MW.


Manager NEM Real Time Operations
     
125696RESERVE NOTICE16/03/2025 07:17:11 AM

PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 16/03/2025

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 125671 has been updated to the following:

From 1630 hrs 16/03/2025 to 1930 hrs 16/03/2025.
The forecast capacity reserve requirement is 1400 MW.
The minimum capacity reserve available is 880 MW.


Manager NEM Real Time Operations
     
125695MARKET INTERVENTION16/03/2025 06:03:22 AM

Direction - SA region to Pelican Point Power Limited - PPCCGT PELICAN POINT

AEMO ELECTRICITY MARKET NOTICE

Direction - SA region to Pelican Point Power Limited - PPCCGT PELICAN POINT

Refer to Market Notice 125670


In accordance with section 116 of the National Electricity Law, AEMO is issuing a direction to Pelican Point Power Limited. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a1)(1).

Direction issued to: Pelican Point Power Limited - PPCCGT PELICAN POINT at 0600 hrs 16/03/2025
Type of resource: generating unit
Required actions: Remain synchronised and follow dispatch targets at 0730 hrs 16/03/2025
Services provided: Voltage Control
Circumstances necessitating the Direction: Voltage
Circumstances necessitating the Direction additional detail: The synchronous generating units currently expected to be synchronised in SA will be inadequate to maintain sufficient Voltage Control in SA. Intervention is required to maintain the power system in a secure operating state
Expected duration: 0400 hrs 17/03/2025 / further notice.

Pelican Point Power Limited does not incur any civil monetary liability for a relevant action taken in accordance with this direction unless the action is taken in bad faith.

Manager NEM Real Time Operations
     
125694MARKET INTERVENTION16/03/2025 06:00:22 AM

Cancellation: Direction issued to: Pelican Point Power Limited - PPCCGT PELICAN POINT

AEMO ELECTRICITY MARKET NOTICE

Cancellation: Direction issued to: Pelican Point Power Limited - PPCCGT PELICAN POINT

Refer to Market Notice 125669

Direction is cancelled from: 0555 hrs 16/03/2025

Manager NEM Real Time Operations
     
125693SETTLEMENTS RESIDUE15/03/2025 08:00:21 PM

[EventId:202503152000_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 15 March 2025 20:00

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 2000 hrs on 15 March 2025

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 15 March 2025.

Refer to market notice: 125680

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.

The negative residue constraint NRM_NSW1_VIC1 ceased operating at 2000 hrs on 15 March 2025.

This is an AEMO autogenerated Market Notice.
     
125680SETTLEMENTS RESIDUE15/03/2025 04:35:34 PM

[EventId:202503151635_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 15 March 2025 16:35

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1635 hrs on 15 March 2025

ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 15 March 2025.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.

The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1635 hrs on 15 March 2025.

This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
     
125678RESERVE NOTICE15/03/2025 04:34:10 PM

PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 15/03/2025

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following period:

[1.] From 1730 hrs 15/03/2025 to 1830 hrs 15/03/2025.
The forecast capacity reserve requirement is 1663 MW.
The minimum capacity reserve available is 1546 MW.

Manager NEM Real Time Operations
     