[EventId:202501171605_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 17 January 2025 16:05
Issued by Australian Energy Market Operator Ltd at 1605 hrs on 17 January 2025
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 17 January 2025.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1605 hrs on 17 January 2025.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:202501171530_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 17 January 2025 15:30
Issued by Australian Energy Market Operator Ltd at 1530 hrs on 17 January 2025
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 17 January 2025.
Refer to market notice: 123405
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1530 hrs on 17 January 2025.
This is an AEMO autogenerated Market Notice.
Update Non-credible contingency event - NSW region - 17/01/2025
Update Non-credible contingency event - NSW region - 17/01/2025
Refer AEMO Electricity Market Notice 123404
At 0825 hrs the Buronga 330 kV B Bus tripped.
AEMO did not instruct load shedding.
AEMO has not been advised of any disconnection of bulk electrical load.
The cause of this non credible contingency event is not known at this stage.
Manager NEM Real Time Operations
[EventId:202501171310_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 17 January 2025 13:10
Issued by Australian Energy Market Operator Ltd at 1310 hrs on 17 January 2025
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 17 January 2025.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1310 hrs on 17 January 2025.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
Non-credible contingency event - NSW region - 17/01/2025
Non-credible contingency event - NSW region - 17/01/2025
At 0825 hrs the Buronga 330 kV B Bus tripped.
AEMO did not instruct load shedding.
AEMO has not been advised of any disconnection of bulk electrical load.
The cause of this non credible contingency event has been identified and AEMO is satisfied that another occurrence of this event is unlikely under the current circumstances.
The cause of this non credible contingency event is not known at this stage.
Manager NEM Real Time Operations
Inter-regional transfer limit variation - constraint automation to manage Power System Security in QLD region - 16/01/2025
In order to maintain the power system in a secure operating state in the QLD region, AEMO has invoked automated constraint set CA_BRIS_569B1432 from 1425 hrs until further notice.
This constraint set contains equations with the following interconnector on the LHS;
NSW1-QLD1
Refer to AEMO Network Outage Scheduler (NOS) for further information.
Manager NEM Real Time Operations
[EventId:202501161230_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 16 January 2025 12:30
Issued by Australian Energy Market Operator Ltd at 1230 hrs on 16 January 2025
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 16 January 2025.
Refer to market notice: 123374
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1230 hrs on 16 January 2025.
This is an AEMO autogenerated Market Notice.
[EventId:202501161135_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 16 January 2025 11:35
Issued by Australian Energy Market Operator Ltd at 1135 hrs on 16 January 2025
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 16 January 2025.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1135 hrs on 16 January 2025.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
Non-credible contingency event - NSW region - 15/01/2025
Non-credible contingency event - NSW region - 15/01/2025
At 2019 hrs the Tomago - Taree (963) 132kV line and the Tomago - Brandy Hill (96C) 132kV line tripped.
AEMO did not instruct load shedding.
AEMO has been advised of disconnection of 80 MW of bulk electrical load.
The cause of this non credible contingency event is not known at this stage.
Manager NEM Real Time Operations