Inter-regional transfer limit variation - Canberra - Lower Tumut (07) 330 kV Line. - NSW region - 21/03/2025
Inter-regional transfer limit variation -Canberra - Lower Tumut (07) 330 kV Line - NSW region - 21/03/2025
At 1746 hrs 21/03/2025 there was an unplanned outage of Canberra - Lower Tumut (07) 330 kV Line.
The following constraint sets invoked at 1800 hrs 21/03/2025
N-CNLT_07
N-X_4+07_WG_CLOSE
This constraint set(s) contains equations with the following interconnectors on the LHS.
N-Q-MNSP1
NSW-QLD1
VIC-NSW1
V-S-MNSP1
Refer to the AEMO Network Outage Scheduler for further information.
Manager NEM Real Time Operations
Inter-regional transfer limit variation - Darlington Point - Balranald X5 220kV Line - NSW region - 21/03/2025
Inter-regional transfer limit variation - Darlington Point - Balranald X5 220kV Line - NSW region - 21/03/2025
A planned outage of Darlington Point - Balranald X5 220kV Line in the NSW region was scheduled from 0600 hrs 21/03/2025 to 1600 hrs 21/03/2025.
The outage has been completed and Darlington Point - Balranald X5 220kV Line returned to service at 1220 hrs 21/03/2025
Constraint set(s) revoked: N-BADP
Manager NEM Real Time Operations
Inter-regional transfer limit variation - Robertstown - Tungkillo 1 275 kV line - SA region - 19/03/2025
Inter-regional transfer limit variation - Robertstown - Tungkillo 1 275 kV line - SA region - 19/03/2025
At 1450 hrs 19/03/2025 there was a short notice outage of Robertstown - Tungkillo 1 275 kV line.
The following constraint set(s) invoked at 1455 hrs 19/03/2025
S-RBTU
This constraint set(s) contains equations with the following interconnectors on the LHS.
V-S-MNSP1
V-SA
Refer to the AEMO Network Outage Scheduler for further information.
Manager NEM Real Time Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 16/03/2025
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 125700 has been updated at1415 hrs to the following:
[1.] From 1700 hrs 16/03/2025 to 1930 hrs 16/03/2025.
The forecast capacity reserve requirement is 1720 MW.
The minimum capacity reserve available is 1162 MW.
Manager NEM Real Time Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 16/03/2025
The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 125699 is cancelled at 1415 hrs.
Manager NEM Real Time Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 16/03/2025
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 125698 has been updated at1045 hrs to the following:
[1.] From 1600 hrs 16/03/2025 to 1700 hrs 16/03/2025.
The forecast capacity reserve requirement is 1370 MW.
The minimum capacity reserve available is 725 MW.
[2.] From 1830 hrs 16/03/2025 to 2000 hrs 16/03/2025.
The forecast capacity reserve requirement is 1817 MW.
The minimum capacity reserve available is 1159 MW.
Manager NEM Real Time Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 16/03/2025
The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 125697 has been updated at 1045 hrs to the following:
From 1700 hrs 16/03/2025 to 1830 hrs 16/03/2025.
The forecast capacity reserve requirement is 730 MW.
The minimum capacity reserve available is 656 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 16/03/2025
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 125696 has been updated to the following:
[1.] From 1600 hrs 16/03/2025 to 1730 hrs 16/03/2025.
The forecast capacity reserve requirement is 1400 MW.
The minimum capacity reserve available is 774 MW.
[2.] From 1800 hrs 16/03/2025 to 1930 hrs 16/03/2025.
The forecast capacity reserve requirement is 1844 MW.
The minimum capacity reserve available is 1154 MW.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 16/03/2025
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following Period:
[1.] From 1730 hrs 16/03/2025 to 1800 hrs 16/03/2025.
The forecast capacity reserve requirement is 1105 MW.
The minimum capacity reserve available is 1017 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time at which it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations