Market Notices

125474NON-CONFORMANCE10/03/2025 01:05:17 PM

NON-CONFORMANCE Region QLD1 Monday, 10 March 2025

AEMO ELECTRICITY MARKET NOTICE

NON-CONFORMANCE QLD1 Region Monday, 10 March 2025

AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:

Unit: MPP_1
Duration: 10/03/2025 13:00 to 10/03/2025 13:05
Amount: -11 MW
Constraint: NC-Q_MPP_1

Auto-generated on behalf of Manager NEM Real Time Operations
     
125467GENERAL NOTICE10/03/2025 10:51:35 AM

NEM Local Temperature Alerts for SA, TAS from 10 Mar 2025 to 14 Mar 2025

AEMO ELECTRICITY MARKET NOTICE

AEMO's weather service provider has issued forecast temperatures equal to or greater than the NEM Local Temperature Alert Levels for listed weather stations below.

SA
Adelaide West Terrace (39+ Deg C): 10th Mar
Port Augusta Ap (39+ Deg C): 10th Mar, 14th Mar

TAS
Launceston Ti Tree Bend (33+ Deg C): 10th Mar

The NEM Local Temperature Alert Levels are:

Launceston Ti Tree Bend: 33 Deg C, Dalby Airport: 37 Deg C, for all other selected weather stations: 39 Deg C.

AEMO requests Market Participants to:

1. review the weather forecast in the local area where their generating units / MNSP converter stations are located and,

2. if required, update the available capacity in their dispatch offers or availability submissions consistent with the forecast temperatures.

Further information is available at:

https://aemo.com.au/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-reliability/projected-assessment-of-system-adequacy/nem-local-temperature-alerts

AEMO Operations Planning
     
125394SETTLEMENTS RESIDUE08/03/2025 03:00:23 PM

[EventId:202503081500_NRM_VIC1_SA1_stopped] NEGRES CONSTRAINT NRM_VIC1_SA1 ceased operating from 08 March 2025 15:00

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1500 hrs on 8 March 2025

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 8 March 2025.

Refer to market notice: 125380

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the VIC to SA directional interconnector.

The negative residue constraint NRM_VIC1_SA1 ceased operating at 1500 hrs on 8 March 2025.

This is an AEMO autogenerated Market Notice.
     
125380SETTLEMENTS RESIDUE08/03/2025 01:10:28 PM

[EventId:202503081310_NRM_VIC1_SA1_started] NEGRES CONSTRAINT NRM_VIC1_SA1 started operating from 08 March 2025 13:10

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1310 hrs on 8 March 2025

ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 8 March 2025.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the VIC to SA directional interconnector.

The negative residue constraint set NRM_VIC1_SA1 commenced operating from 1310 hrs on 8 March 2025.

This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
     
125377SETTLEMENTS RESIDUE08/03/2025 01:00:25 PM

[EventId:202503081300_NRM_VIC1_SA1_stopped] NEGRES CONSTRAINT NRM_VIC1_SA1 ceased operating from 08 March 2025 13:00

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1300 hrs on 8 March 2025

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 8 March 2025.

Refer to market notice: 125373

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the VIC to SA directional interconnector.

The negative residue constraint NRM_VIC1_SA1 ceased operating at 1300 hrs on 8 March 2025.

This is an AEMO autogenerated Market Notice.
     
125373SETTLEMENTS RESIDUE08/03/2025 12:10:28 PM

[EventId:202503081210_NRM_VIC1_SA1_started] NEGRES CONSTRAINT NRM_VIC1_SA1 started operating from 08 March 2025 12:10

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1210 hrs on 8 March 2025

ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 8 March 2025.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the VIC to SA directional interconnector.

The negative residue constraint set NRM_VIC1_SA1 commenced operating from 1210 hrs on 8 March 2025.

This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
     
125357INTER-REGIONAL TRANSFER07/03/2025 07:27:37 AM

Inter-regional transfer limit variation - Lismore SVC - NSW region - 07/03/2025

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - Lismore SVC - NSW region - 07/03/2025

At 0720 hrs 07/03/2025 there was an unplanned outage of Lismore SVC.

The following constraint set(s) invoked at 0725 hrs 07/03/2025
N-LS_VC1

This constraint set(s) contains equations with the following interconnectors on the LHS.
N-Q-MNSP1,NSW1-QLD1

Refer to the AEMO Network Outage Scheduler for further information.

Manager NEM Real Time Operations
     
125356INTER-REGIONAL TRANSFER07/03/2025 06:44:20 AM

Inter-Regional Transfer limit variation - Directlink - NSW Region

AEMO ELECTRICITY MARKET NOTICE

Refer to Market Notice 125355.

Inter-Regional Transfer limit variation - Directlink - NSW Region

There has been an unplanned outage of the No 1 and 2 cables of Directlink .

The following constraint set was invoked at 0620 hrs 07/03/2025

N-X_MBTE_3

The constraint set contains the following interconnector on the left hand side.

N-Q-MNSP1

Refer AEMO Network Outage Scheduler (NOS) for further details.

Manager NEM Real Time Operations
     
125353NON-CONFORMANCE07/03/2025 01:00:15 AM

NON-CONFORMANCE Region QLD1 Friday, 7 March 2025

AEMO ELECTRICITY MARKET NOTICE

NON-CONFORMANCE QLD1 Region Friday, 7 March 2025

AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:

Unit: CPP_4
Duration: 07/03/2025 00:30 to 07/03/2025 01:00
Amount: -21 MW
Constraint: NC-Q_CPP_4

Auto-generated on behalf of Manager NEM Real Time Operations
     