Inter-regional transfer limit variation - Moorabool Sydenham 500 kV lines - Vic region - 15/02/2024
At 1905 hrs 15/02/2024 in the Victoria region interim work was completed at Moorabool and Sydenham terminal stations to provide additional 500 kV bus ties.
As a result of this completed work the South Australia region is no longer on a credible risk of separation.
Constraint set changes.
Invoked:
V-X_MLSY_MLTS_TIE
Revoked:
F-V-X_ML_BUSTIE_500
I-VS_050
S-X_BC_CP
V-X_MLSY
This constraint set(s) contains equations with the following interconnectors on the LHS.
T-V-MNSP1
V-SA
V-S-MNSP1
VIC1- NSW1
Rfer Market Notices 114577, 114768, 114686
Refer to the AEMO Network Outage Scheduler for further information.
Manager NEM Real Time Operations
Cancellation - AEMO Intervention Event - Intervention trading intervals - Direction VIC region 14/02/2024
Cancellation - AEMO Intervention Event - Intervention trading intervals - Direction VIC region 14/02/2024
Refer Market Notice 114697
The AEMO Intervention Event and all associated directions are cancelled from 1905 hrs 15/02/2024
Manager NEM Real Time Operations
Update - Direction - SA Region - 14/02/2024
Update - Direction - SA Region - 14/02/2024
Refer Market Notice 114721
The AEMO intervention event that commenced from interval ending 1535 hrs on 14/02/2024 is continuing.
AEMO may issue or revoke additional directions in order to meet the current requirement, unless sufficient market response is provided. A further market notice will be issued when all directions related to this requirement have been cancelled.
Manager NEM Real Time Operations
Cancellation of Distributed PV Contingency 3 (DPVC3), Distributed PV Contingency 2 (DPVC2) and Distributed PV Contingency 1 (DPVC1) condition in the SA Region on 15/02/2024.
Cancellation - DPVC3, DPVC2 and DPVC1 - SA Region
Refer Market Notice 114751 for DPVC3, 114753 for DPVC2 and 114746 for DPVC1.
The DPVC3, DPVC2 and DPVC1 condition for 15/02/2024 is cancelled at 1415 hrs 15/02/2024.
Manager NEM Real Time Operations
Update - Distributed PV Contingency 3 (DPVC3) in the SA Region on 15/02/2024
Update - Distributed PV Contingency 3 (DPVC3) in the SA Region on 15/02/2024
Refer AEMO Electricity Participant Notice 114751
Distributed PV curtailment is occurring in the SA region to maintain system security due to a Distributed PV Contingency condition.
The instruction direction under National Electricity Law s116 to maintain demand above the required threshold is now expected to end at 1430 hrs 15/02/2024.
Manager NEM Real Time Operations
Distributed PV Contingency 2 (DPVC2) in the SA Region on 15/02/2024
AEMO has taken action(s) to maintain power system security in South Australia at 1215 hrs 15/02/2024 due to a forecast Distributed PV Contingency (DPVC) condition.
AEMO actions may include the recall of planned outages, a direction and/or instruction to scheduled and non-scheduled generation, and/or an instruction direction to maintain DPV generation below a secure DPV generation threshold.
Manager NEM Real Time Operations
[EventId:202402151230_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 15 February 2024 12:30
Issued by Australian Energy Market Operator Ltd at 1230 hrs on 15 February 2024
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 15 February 2024.
Refer to market notice: 114749
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1230 hrs on 15 February 2024.
This is an AEMO autogenerated Market Notice.
Distributed PV Contingency 3 (DPVC3) in the SA Region on 15/02/2024
Distributed PV curtailment is occurring in the SA region to maintain system security due to a Distributed PV Contingency condition.
The instruction direction under National Electricity Law s.116 to maintain demand above the required threshold is expected to end at 1330 hrs 15/02/2024.
Manager NEM Real Time Operations
[EventId:202402151140_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 15 February 2024 11:40
Issued by Australian Energy Market Operator Ltd at 1140 hrs on 15 February 2024
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 15 February 2024.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1140 hrs on 15 February 2024.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.