[EventId:202401262030_NRM_QLD1_NSW1_stopped] NEGRES CONSTRAINT NRM_QLD1_NSW1 ceased operating from 26 January 2024 20:30
Issued by Australian Energy Market Operator Ltd at 2030 hrs on 26 January 2024
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - QLD to NSW - 26 January 2024.
Refer to market notice: 113805
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the QLD to NSW directional interconnector.
The negative residue constraint NRM_QLD1_NSW1 ceased operating at 2030 hrs on 26 January 2024.
This is an AEMO autogenerated Market Notice.
[EventId:202401261905_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 26 January 2024 19:05
Issued by Australian Energy Market Operator Ltd at 1905 hrs on 26 January 2024
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 26 January 2024.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1905 hrs on 26 January 2024.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:202401261830_NRM_QLD1_NSW1_started] NEGRES CONSTRAINT NRM_QLD1_NSW1 started operating from 26 January 2024 18:30
Issued by Australian Energy Market Operator Ltd at 1830 hrs on 26 January 2024
ACTUAL NEGATIVE SETTLEMENT RESIDUES - QLD to NSW - 26 January 2024.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the QLD to NSW directional interconnector.
The negative residue constraint set NRM_QLD1_NSW1 commenced operating from 1830 hrs on 26 January 2024.
This constraint set contains an equation with the following interconnectors on the LHS:
N-Q-MNSP1
NSW1-QLD1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 27/01/2024
The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 113769 has been updated at 1545 hrs to the following:
[1.] From 1630 hrs 27/01/2024 to 2200 hrs 27/01/2024.
The forecast capacity reserve requirement is 1050 MW.
The minimum capacity reserve available is 607 MW.
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 28/01/2024
The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 113745 has been updated at 1435 hrs 26/01/2024 to the following:
[1.] From 1300 hrs 28/01/2024 to 1530 hrs 28/01/2024.
The forecast capacity reserve requirement is 878 MW.
The minimum capacity reserve available is 801 MW.
Manager NEM Real Time Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region beginning on 26/01/2024
The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 113767 is cancelled at 1355 hrs 26/01/2024.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 27/01/2024
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following periods:
[1.] From 1630 hrs 27/01/2024 to 1730 hrs 27/01/2024.
The forecast capacity reserve requirement is 1050 MW.
The minimum capacity reserve available is 572 MW.
[2.] From 2030 hrs 27/01/2024 to 2100 hrs 27/01/2024.
The forecast capacity reserve requirement is 1050 MW.
The minimum capacity reserve available is 621 MW.
[3.] From 2130 hrs 27/01/2024 to 2230 hrs 27/01/2024.
The forecast capacity reserve requirement is 1050 MW.
The minimum capacity reserve available is 740 MW.
Manager NEM Real Time Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region beginning on 26/01/2024
The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 113765 has been updated at 1250 hrs to the following:
[1.] From 1830 hrs 26/01/2024 to 1930 hrs 26/01/2024.
The forecast capacity reserve requirement is 1050 MW.
The minimum capacity reserve available is 1012 MW.
[2.] From 1630 hrs 27/01/2024 to 1700 hrs 27/01/2024.
The forecast capacity reserve requirement is 1050 MW.
The minimum capacity reserve available is 840 MW.
[3.] From 2030 hrs 27/01/2024 to 2230 hrs 27/01/2024.
The forecast capacity reserve requirement is 1050 MW.
The minimum capacity reserve available is 623 MW.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 26/01/2024
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following period:
[1.] From 1830 hrs 26/01/2024 to 1930 hrs 26/01/2024.
The forecast capacity reserve requirement is 1050 MW.
The minimum capacity reserve available is 1009 MW.
Manager NEM Real Time Operations