Filter by category
Filter by Date
STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 04/02/2024
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 113912 has been updated at 1400 hrs 29/01/2024 to the following:
From 1700 hrs to 2130 hrs 04/02/2024.
The forecast capacity reserve requirement is 1489 MW.
The minimum capacity reserve available is 1108 MW.
AEMO Operations
PDPASA - Update to Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 29/01/2024
Refer to MN 113962
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following Period:
[1.] From 1730 hrs 29/01/2024 to 1930 hrs 29/01/2024.
The forecast capacity reserve requirement is 1106 MW.
The minimum capacity reserve available is 965 MW.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 29/01/2024
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following Period:
[1.] From 1830 hrs 29/01/2024 to 1900 hrs 29/01/2024.
The forecast capacity reserve requirement is 1035 MW.
The minimum capacity reserve available is 928 MW.
Manager NEM Real Time Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 29/01/2024
The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 113956 is cancelled at 0500 hrs 29/01/2024.
Manager NEM Real Time Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 29/01/2024
The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 113931 has been updated at 2345 hrs 28/01/2024 to the following:
[1.] From 1730 hrs 29/01/2024 to 1900 hrs 29/01/2024.
The forecast capacity reserve requirement is 1049 MW.
The minimum capacity reserve available is 998 MW.
Manager NEM Real Time Operations
[EventId:202401281900_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 28 January 2024 19:00
Issued by Australian Energy Market Operator Ltd at 1900 hrs on 28 January 2024
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 28 January 2024.
Refer to market notice: 113938
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1900 hrs on 28 January 2024.
This is an AEMO autogenerated Market Notice.
[EventId:202401281810_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 28 January 2024 18:10
Issued by Australian Energy Market Operator Ltd at 1810 hrs on 28 January 2024
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 28 January 2024.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1810 hrs on 28 January 2024.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 29/01/2024
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following Period:
[1.] From 1700 hrs 29/01/2024 to 2130 hrs 29/01/2024.
The forecast capacity reserve requirement is 1073 MW.
The minimum capacity reserve available is 843 MW.
Manager NEM Real Time Operations
STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 04/02/2024
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following period:
From 1730 hrs 04/02/2024 to 1830 hrs 04/02/2024.
The forecast capacity reserve requirement is 1400 MW.
The minimum capacity reserve available is 1095 MW.
Manager NEM Real Time Operations