STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 01/02/2024
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following periods:
1. From 0830 hrs to 0900 hrs 01/02/2024.
The forecast capacity reserve requirement is 206 MW.
The minimum capacity reserve available is 180 MW.
2. From 1000 hrs to 1100 hrs 01/02/2024.
The forecast capacity reserve requirement is 179 MW.
The minimum capacity reserve available is 29 MW.
3. From 1200 hrs to 1300 hrs 01/02/2024.
The forecast capacity reserve requirement is 175 MW.
The minimum capacity reserve available is 14 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
AEMO Operations
STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 30/01/2024
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following periods:
1. From 1000 hrs to 1330 hrs 30/01/2024.
The forecast capacity reserve requirement is 699 MW.
The minimum capacity reserve available is 653 MW.
2. From 1400 hrs to 1500 hrs 30/01/2024.
The forecast capacity reserve requirement is 673 MW.
The minimum capacity reserve available is 642 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
AEMO Operations
STPASA - Suspect Lack Of Reserve Level 3 (LOR3) in the QLD Region on 01/02/2024
AEMO considers that there are suspect Forecast LOR3 conditions for the QLD region for the following periods:
1. From 0900 hrs to 1000 hrs 01/02/2024.
The maximum load (other than interruptible loads) forecast to be interrupted is 38 MW at 0930 hrs.
2. From 1130 hrs to 1200 hrs 01/02/2024.
The maximum load (other than interruptible loads) forecast to be interrupted is 62 MW at 1130 hrs.
AEMO is currently investigating these LOR3 forecast conditions to confirm whether they are valid.
AEMO Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 29/01/2024
The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 113956 is cancelled at 0500 hrs 29/01/2024.
Manager NEM Real Time Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 29/01/2024
The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 113931 has been updated at 2345 hrs 28/01/2024 to the following:
[1.] From 1730 hrs 29/01/2024 to 1900 hrs 29/01/2024.
The forecast capacity reserve requirement is 1049 MW.
The minimum capacity reserve available is 998 MW.
Manager NEM Real Time Operations
STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 30/01/2024
The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice 113904 is cancelled at 2340 hrs 28/01/2024.
No LOR2 condition is currently forecast in the STPASA period.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 29/01/2024
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following Period:
[1.] From 1700 hrs 29/01/2024 to 2130 hrs 29/01/2024.
The forecast capacity reserve requirement is 1073 MW.
The minimum capacity reserve available is 843 MW.
Manager NEM Real Time Operations
STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 04/02/2024
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following period:
From 1730 hrs 04/02/2024 to 1830 hrs 04/02/2024.
The forecast capacity reserve requirement is 1400 MW.
The minimum capacity reserve available is 1095 MW.
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 30/01/2024
The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 113859 has been updated at 1430 hrs to the following:
[1.] From 0830 hrs 30/01/2024 to 0900 hrs 30/01/2024.
The forecast capacity reserve requirement is 840 MW.
The minimum capacity reserve available is 806 MW.
[2.] From 1130 hrs 30/01/2024 to 1330 hrs 30/01/2024.
The forecast capacity reserve requirement is 840 MW.
The minimum capacity reserve available is 808 MW.
[3.] From 1400 hrs 30/01/2024 to 1430 hrs 30/01/2024.
The forecast capacity reserve requirement is 840 MW.
The minimum capacity reserve available is 834 MW.