Filter by category
Filter by Date
[EventId:202402070835_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 07 February 2024 08:35
Issued by Australian Energy Market Operator Ltd at 0835 hrs on 7 February 2024
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 7 February 2024.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 0835 hrs on 7 February 2024.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
Cancellation of Actual (LOR1) condition in the QLD region - 06/02/2024
Cancellation of Actual (LOR1) condition in the QLD region - 06/02/2024
The Actual LOR1 Condition in the QLD Region advised in AEMO Electricity Market Notice No.114399 is cancelled at 1945 hrs 06/02/2024.
Manager NEM Real Time Operations
Update - Actual Lack Of Reserve Level 1 (LOR1) in the QLD region - 06/02/2024
Update - Actual Lack Of Reserve Level 1 (LOR1) in the QLD region - 06/02/2024
The actual LOR1 condition in the Qld region advised in AEMO Electricity Market Notice No. 114397 has been updated at 1915 hrs 06/02/2024 to the following:
The Actual LOR1 condition is forecast to exist until 2000 hrs.
The forecast capacity reserve requirement is 1045 MW.
The minimum capacity reserve available is 950 MW.
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 1 (LOR1) in the QLD region - 06/02/2024
Actual Lack Of Reserve Level 1 (LOR1) in the QLD region - 06/02/2024
An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the QLD region from 1800 hrs.
The Actual LOR1 condition is forecast to exist until 1930 hrs
The capacity reserve requirement is 1095 MW
The minimum capacity reserve available is 892 MW
Manager NEM Real Time Operations
[EventId:202402051920_NRM_QLD1_NSW1_stopped] NEGRES CONSTRAINT NRM_QLD1_NSW1 ceased operating from 05 February 2024 19:20
Issued by Australian Energy Market Operator Ltd at 1920 hrs on 5 February 2024
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - QLD to NSW - 5 February 2024.
Refer to market notice: 114336
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the QLD to NSW directional interconnector.
The negative residue constraint NRM_QLD1_NSW1 ceased operating at 1920 hrs on 5 February 2024.
This is an AEMO autogenerated Market Notice.
[EventId:202402051835_NRM_QLD1_NSW1_started] NEGRES CONSTRAINT NRM_QLD1_NSW1 started operating from 05 February 2024 18:35
Issued by Australian Energy Market Operator Ltd at 1835 hrs on 5 February 2024
ACTUAL NEGATIVE SETTLEMENT RESIDUES - QLD to NSW - 5 February 2024.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the QLD to NSW directional interconnector.
The negative residue constraint set NRM_QLD1_NSW1 commenced operating from 1835 hrs on 5 February 2024.
This constraint set contains an equation with the following interconnectors on the LHS:
N-Q-MNSP1
NSW1-QLD1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 05/02/2024
The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 114291 is cancelled at 1245 hrs 05/02/2024.
Manager NEM Real Time Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 05/02/2024
The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 114286 has been updated at 1145 hrs to the following:
[1.] From 1630 hrs 05/02/2024 to 1700 hrs 05/02/2024.
The forecast capacity reserve requirement is 721 MW.
The minimum capacity reserve available is 692 MW.
AEMO is seeking a market response.
AEMO estimates the latest time it would need to intervene through an AEMO intervention event is 1530 hrs on 05/02/2024
Manager NEM Real Time Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 05/02/2024
The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 114283 has been updated at 1115 hrs to the following:
[1.] From 1530 hrs 05/02/2024 to 1700 hrs 05/02/2024.
The forecast capacity reserve requirement is 736 MW.
The minimum capacity reserve available is 652 MW.
AEMO is seeking a market response.
AEMO estimates the latest time it would need to intervene through an AEMO intervention event is 1400 hrs on 05/02/2024
Manager NEM Real Time Operations