Filter by category
Filter by Date
[EventId:202402131730_review] Prices for interval 13-Feb-2024 17:30 are subject to review
Issued by Australian Energy Market Operator Ltd at 1725 hrs on 13 February 2024
PRICES ARE SUBJECT TO REVIEW for trading interval 13-Feb-2024 17:30.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
[EventId:202402131725_review] Prices for interval 13-Feb-2024 17:25 are subject to review
Issued by Australian Energy Market Operator Ltd at 1720 hrs on 13 February 2024
PRICES ARE SUBJECT TO REVIEW for trading interval 13-Feb-2024 17:25.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
[EventId:202402131720_review] Prices for interval 13-Feb-2024 17:20 are subject to review
Issued by Australian Energy Market Operator Ltd at 1715 hrs on 13 February 2024
PRICES ARE SUBJECT TO REVIEW for trading interval 13-Feb-2024 17:20.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
Cancellation of a Non-Credible Contingency Event: Collinsville - Stoney Creek 7306 132KV LINE line and Collinsville - Newlands 7121 132KV LINE line in QLD1 due to Lightning.
Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.
Region: QLD1
Lines: Collinsville - Stoney Creek 7306 132KV LINE and Collinsville - Newlands 7121 132KV LINE
Cancellation time: 13/02/2024 17:14
Constraint set(s) revoked:
NONE
Refer AEMO Electricity Market Notice 114630
Auto-generated on behalf of Manager NEM Real Time Operations
Possible intervention to manage power system security in VIC region
Possible intervention to manage power system security in VIC region
The synchronous generating units currently expected to be synchronised in VIC from 1830 hrs 13/02/2024 will be inadequate to maintain a secure operating state in VIC .
AEMO estimates that, in the absence of sufficient market response by 1730 hrs 13/02/2024, AEMO may need to intervene by issuing a direction requiring one or more VIC synchronous generating unit(s) to operate or remain synchronised to maintain power system security in VIC.
Manager NEM Real Time Operations
Reclassification of a Non-Credible Contingency Event: Norwood -Scottsdale 110kV line and the Norwood - Scottsdale -Derby 110kV line in TAS due to Non-Credible Event
Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Non-Credible Event. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.
Region: TAS
Lines: Norwood -Scottsdale 110kV line and the Norwood - Scottsdale -Derby 110kV line
Duration: 13/02/2024 16:30 until further notice
Manager NEM Real Time Operations
Reclassification of non-credible contingency event due to existence of widespread abnormal conditions - VIC region(s).
AEMO has identified that a non-credible contingency event impacting the power system is more likely to occur and is considered reasonably possible because of the existence of widespread abnormal conditions namely severe weather in the VIC region.
AEMO has therefore reclassified the occurrence of a non-credible contingency event involving multiple plant due to these abnormal conditions as credible.
Need for further measures is being monitored and further measures may be implemented in line with the Power System Security Guidelines (SO_OP_3715).
Manager NEM Real Time Operations
Reclassification of a Non-Credible Contingency Event: Palmerston - Hadspen 3 & 4 110kV line and line in TAS1 due to Lightning.
Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.
Region: TAS1
Lines: Palmerston - Hadspen 3 & 4 110kV and
Duration: 13/02/2024 15:21 until further notice
Constraint set(s) invoked:
T-HAPM_110_N-2 Constraint set contains the following interconnector(s) on the left hand side:
NONE
Auto-generated on behalf of Manager NEM Real Time Operations
[EventId:202402131520_review] Prices for interval 13-Feb-2024 15:20 are subject to review
Issued by Australian Energy Market Operator Ltd at 1515 hrs on 13 February 2024
PRICES ARE SUBJECT TO REVIEW for trading interval 13-Feb-2024 15:20.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.