Load Restoration Direction in the Vic Region
Load Restoration Direction in the Vic Region
AEMO has directed load restoration commencing at 1450 hrs 13/02/2024 in the Victoria region
The direction was issued under section 116 of the NEL, and was a clause 4.8.9 instruction under the NER.
Manager NEM Real Time Operations
Load Shedding Direction in the Vic Region
Load Shedding Direction in the Vic Region
AEMO has directed load shedding commencing at 1420 hrs 13/02/2024
in the Victoria region to restore power system security.
The direction was issued under section 116 of the NEL, and was a clause 4.8.9 instruction under the NER.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the VIC Region on 13/02/2024
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the VIC region for the following Period:
[1.] From 1430 hrs 13/02/2024 to 1600 hrs 13/02/2024.
The forecast capacity reserve requirement is 562 MW.
The minimum capacity reserve available is 384 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time at which it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 13/02/2024
The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 114528 is cancelled at 1445 hrs 12/02/2024.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 13/02/2024
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following Period:
[1.] From 1700 hrs 13/02/2024 to 1830 hrs 13/02/2024.
The forecast capacity reserve requirement is 1224 MW.
The minimum capacity reserve available is 1098 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time at which it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 13/02/2024
The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 114503 is cancelled at 0300 hrs 12/02/2024
[No LOR2 condition is currently forecast in the STPASA period.]
Manager NEM RTO
STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 13/02/2024
The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 114495 has been updated at 1430 hrs 11/02/2024 to the following:
[1.] From 1600 hrs 13/02/2024 to 1630 hrs 13/02/2024.
The forecast capacity reserve requirement is 1211 MW.
The minimum capacity reserve available is 1122 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 13/02/2024
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following period:
[1.] From 1600 hrs 13/02/2024 to 1700 hrs 13/02/2024.
The forecast capacity reserve requirement is 1319 MW.
The minimum capacity reserve available is 1056 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 05/02/2024
The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 114291 is cancelled at 1245 hrs 05/02/2024.
Manager NEM Real Time Operations