Filter by category
Filter by Date
Inter-regional transfer limit variation - Heywood No 2 500 kV bus - VIC region - 17/04/2024
Inter-regional transfer limit variation - Heywood No 2 500 kV bus - VIC region - 17/04/2024
Refer market notice 116160
At 0414 hrs 17/04/2024 there was an unplanned outage of Heywood No 2 500 kV bus.
The following constraint set(s) invoked at 0430 hrs 17/04/2024
F-I-HYSE
S-X_BC_CP
V-HYTX_M12
V-HY_500BUS
This constraint set(s) contains equations with the following interconnectors on the LHS.
V-S-MNSP1, V-SA, T-V-MNSP1
Refer to the AEMO Network Outage Scheduler for further information.
Manager NEM Real Time Operations
Inter-regional transfer limit variation - constraint automation to manage Power System Security in SA region - 16/04/2024
In order to maintain the power system in a secure operating state in the SA region, AEMO has invoked automated constraint set CA_BRIS_55306556 from 1150 hrs until further notice.
This constraint set contains equations with the following interconnector on the LHS;
V-SA
Refer to AEMO Network Outage Scheduler (NOS) for further information.
Manager NEM Real Time Operations
Inter-regional transfer limit variation - Tamworth No1 SVC Protection system- NSW region - 15/04/2024
Inter-regional transfer limit variation - Tamworth No1 SVC Protection system - NSW region - 15/04/2024
At 1635 hrs 15/04/2024 there was a short notice outage of Tamworth No1 SVC protection system.
The following constraint set(s) invoked at 1650 hrs 15/04/2024
N-TW_SVC
This constraint set(s) contains equations with the following interconnectors on the LHS.
N-Q-MNSP1,NSW1-QLD1
Refer to the AEMO Network Outage Scheduler for further information.
Manager NEM Real Time Operations
Inter-regional transfer limit variation - Tamworth No1 SVC - NSW region - 15/04/2024
Inter-regional transfer limit variation - Tamworth No1 SVC - NSW region - 15/04/2024
At 1155 hrs 15/04/2024 there was an unplanned outage of Tamworth No1 SVC.
The following constraint set(s) invoked at 1200 hrs 15/04/2024
N-TW_SVC
This constraint set(s) contains equations with the following interconnectors on the LHS.
N-Q-MNSP1,NSW1-QLD1
Refer to the AEMO Network Outage Scheduler for further information.
Manager NEM Real Time Operations
Inter-regional transfer limit variation - Armidale 1 330kV SVC - NSW region - 15/04/2024
Inter-regional transfer limit variation - Armidale 1 330kV SVC - NSW region - 15/04/2024
A planned outage of Armidale 1 330kV SVC in the NSW region was scheduled from 0700 hrs 15/04/2024 to 1500 hrs 20/04/2024.
The outage has been cancelled at 0700 hrs 15/04/2024
Constraint set(s) revoked: N-AR_VC1
This constraint set(s) contains equations with the following interconnectors on the LHS:
N-Q-MNSP1
NSW1-QLD1
Manager NEM Real Time Operations
Inter-regional transfer limit variation - Hazelwood - South Morang No. 1 500 kV Line - Vic region - 11/04/2024
Inter-regional transfer limit variation - Hazelwood - South Morang No. 1 500 kV Line - Vic region - 11/04/2024
A planned outage of Hazelwood - South Morang No. 1 500 kV Line in the Vic region was scheduled from 0630 hrs 11/04/2024 to 1830 hrs 11/04/2024.
The outage has been completed and Hazelwood - South Morang No. 1 500 kV Line returned to service at 1450 hrs 11/04/2024.
Constraint set revoked: V-HWSM
Manager NEM Real Time Operations
Inter-Regional Transfer limit variation - Directlink - NSW Region
Inter-Regional Transfer limit variation - Directlink - NSW Region
There has been an unplanned outage of the No 3 Leg of Directlink .
The following constraint set was invoked at 0225 hrs 11/04/2024
N-X_MBTE_2
The constraint set contains the following interconnector on the left hand side.
N-Q-MNSP1
Refer AEMO Network Outage Scheduler (NOS) for further details.
Manager NEM Real Time Operations
Inter-regional transfer limit variation - Pelican Point to Parafield Gardens West 275kV Line - SA region - 02/04/2024
Inter-regional transfer limit variation - Pelican Point to Parafield Gardens West 275kV Line - SA region - 02/04/2024
A planned outage of Pelican Point to Parafield Gardens West 275kV Line in the SA region was scheduled from 0730 hrs 02/04/2024 to 1530 hrs 02/04/2024.
The outage has been cancelled at 0718 hrs 02/04/2024
Constraint set(s) revoked: S-PGPP, S-PPPG_PELPT
This constraint set(s) contains equations with the following interconnectors on the LHS.
V-SA
Refer to the AEMO Network Outage Scheduler for further information.
Manager NEM Real Time Operations
Inter-Regional Transfer limit variation - Murraylink
Inter-Regional Transfer limit variation - Murraylink
There has been an unplanned outage of Murraylink.
The following constraint set was invoked at 1005 hrs 27/03/2024
I-MURRAYLINK
The constraint set contains the following interconnector on the left hand side.
V-S-MNSP1,VIC1-NSW1
Refer to AEMO Network Outage Scheduler (NOS) for further details.
Manager NEM Real Time Operations