Filter by category
Filter by Date
Cancellation - Direction - South Australia region
Refer AEMO Electricity Market Notice 55293
The direction was issued at 2054 hrs 09/10/16 and cancelled at 0530 hrs 10/10/16.
Manager NEM Real Time Operations
Direction - South Australia region - Intervention Pricing
Refer AEMO Electricity Market Notice no. 55293.
An AEMO Intervention Event has been implemented by issuing a direction to maintain the power system in a secure operating state.
AEMO declares all dispatch intervals during the AEMO Intervention Event to be intervention price dispatch intervals.
The AEMO Intervention Event will commence in the 0000 hrs 10/10/16 dispatch interval and is forecast to apply until 0530 hrs 10/10/16
Intervention pricing will not be implemented from the 0000 hrs 10/10/16 dispatch interval until the end of the AEMO Intervention Event.
Manager NEM Real Time Operations
Direction - South Australia region
Direction - South Australia region
In accordance with clause 4.8.9 of the National Electricity Rules AEMO has issued a direction to a participant in the South Australia region.
The direction was necessary to maintain the power system in a secure operating state.
The direction was issued at 2054 hrs and is expected to stay in place until 0530 hrs 10/10/16
Manager NEM Real Time Operations
Cancellation of the Forecast (LOR1) condition in the South Australia region - PDPASA - 07/10/16
Cancellation of the Forecast (LOR1) condition in the South Australia region - PDPASA - 07/10/16
The Forecast LOR1 condition in the South Australia region advised in AEMO Electricity Market Notice No. 55255 is cancelled at 0940 hrs 07/10/16.
Manager NEM Real Time Operations
Forecast Lack Of Reserve Level 1 (LOR1) in the South Australian Region - PDPASA - 07 Oct 2016
Forecast Lack Of Reserve Level 1 (LOR1) in the South Australian Region - PDPASA - 07 Oct 2016
AEMO declares a Forecast LOR1 condition for the South Australia Region.
From 2330 hrs to 2400 hrs 07/10/16
The contingency capacity reserve required is 395 MW
The minimum reserve available is 385 MW
Manager NEM Real Time Operations
STPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) condition in the SA region - 27/09/2016
The Forecast LOR1 condition in the SA region advised in AEMO Electricity Market Notice No. 54973 for 27/09/2016 is cancelled at 1400 hrs 26/09/2016.
No LOR1 condition is currently forecast in the STPASA period.
Hitesh Bavarva
AEMO Operations
STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region - 22 Sep 2016
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following period.
From 1900 hrs to 1930 hrs 27 September 2016.
The contingency capacity reserve required is 400 MW.
The minimum reserve available is 396 MW.
Manager NEM Real Time Operations
STPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) condition in the SA Region for 22 Sep 2016
The Forecast LOR1 condition in the SA region advised in AEMO Electricity Market Notice No. 54937 for 22/09/2016 is cancelled at 1400 hrs 21/09/2016.
Tien Foong
AEMO Operations
STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region - 22 Sep 2016
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following period.
From 22/09/2016 1900 hrs to 2000 hrs:
The contingency capacity reserve required is 400 MW.
The minimum reserve available is 363 MW.
Tien Foong
AEMO Operations