NON-CONFORMANCE Region QLD1 Saturday, 26 July 2025
NON-CONFORMANCE QLD1 Region Saturday, 26 July 2025
AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:
Unit: ULPBESS1
Duration: 26/07/2025 21:15 to 26/07/2025 21:25
Amount: 6 MW
Constraint: NC-Q_ULPBESS1
Auto-generated on behalf of Manager NEM Real Time Operations
Update Direction - AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN
Update Direction - AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN
Refer to Market Notice 128318
The TORRB2 TORRENS ISLAN direction is now expected to stay in place until 0400 hrs 28/07/2025.
The direction update is issued at 1700 hrs 26/07/2025.
Manager NEM Real Time Operations
Update - Foreseeable AEMO intervention in SA region
Update - Foreseeable AEMO intervention in SA region
Refer AEMO Electricity Market Notice 128373
AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 2230 hrs 26/07/2025.
The foreseeable circumstance requiring the need for intervention is Voltage.
AEMO estimates that, in the absence of sufficient market response by 1700 hrs 26/07/2025, AEMO may need to intervene by issuing a direction.
Manager NEM Real Time Operations
NON-CONFORMANCE Region VIC1 Saturday, 26 July 2025
NON-CONFORMANCE VIC1 Region Saturday, 26 July 2025
AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:
Unit: KESSB1
Duration: 26/07/2025 13:40 to 26/07/2025 14:05
Amount: 55 MW
Constraint: NC-V_KESSB1
Auto-generated on behalf of Manager NEM Real Time Operations
NON-CONFORMANCE Region VIC1 Saturday, 26 July 2025
NON-CONFORMANCE VIC1 Region Saturday, 26 July 2025
AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:
Unit: RANGEB1
Duration: 26/07/2025 12:45 to 26/07/2025 13:00
Amount: 102 MW
Constraint: NC-V_RANGEB1
Auto-generated on behalf of Manager NEM Real Time Operations
Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region
Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region
AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 2230 hrs 26/07/2025.
The foreseeable circumstance requiring the need for intervention is Voltage.
Manager NEM Real Time Operations
Update - Non-credible contingency event - NSW region - 26/07/2025
Update - Non-credible contingency event - NSW region - 26/07/2025
Refer AEMO Electricity Market Notice 128353
At 0832 hrs the Canberra A 132kV Bus was returned to service.
The cause of this non-credible contingency event has been identified and AEMO is satisfied that another occurrence of this event is unlikely under the current circumstances.
AEMO will not reclassify this event as a credible contingency event.
Manager NEM Real Time Operations
Non-credible contingency event - NSW region - 26/07/2025
Non-credible contingency event - NSW region - 26/07/2025
At 0449 hrs the Canberra 132 kV A Bus and the Canberra to Latham A2 132 kV Line tripped.
AEMO did not instruct load shedding.
AEMO has not been advised of any disconnection of bulk electrical load.
The cause of this non credible contingency event is not known at this stage.
Manager NEM Real Time Operations
Update Direction - AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN
Update Direction - AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN
Refer to Market Notice 128311
The TORRB2 TORRENS ISLAN direction is now expected to stay in place until 0400 hrs 27/07/2025.
The direction update is issued at 1700 hrs 25/07/2025.
Manager NEM Real Time Operations