Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region
Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region
AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 0930 hrs 24/07/2025.
The foreseeable circumstance requiring the need for intervention is Voltage.
Manager NEM Real Time Operations
CHG0104553 - Pre-Prod eMDM Maintenance
Notification issued to: Market Notice
Notification Type: Completed
Change Type: Normal
Service/Component: MDM - Meter Data Management_PreProd
Change Title: Pre-Prod eMDM Maintenance Release
Support Information: Report any impacts to the AEMO Information and Support Hub or on External 1300 236 600.
CHG0102957|PROD|Enable TLS 1.3 for Gas B2B Hub and disable TLS version 1.0/1.1
The Gas B2B hub servers will be updated to support TLS (Transport Layer Security) 1.3 version. Also the legacy versions 1.0 and 1.1 will be disabled and not be supported going forward.
Participants are required to use TLS 1.2 as a minimum protocol to communicate with AEMO, failing to do so will impact the connectivity. An outage is not expected but, there may be some minor interruptions during the change period.
Participants are required to make sure the connectivity is intact post change implementation.
In case of any issues noticed, please reach out to AEMO Support Hub.
Inter-regional transfer limit variation - Eraring 500kV - Kemps Creek 5A2 500kV Line - NSW region - 19/07/2025
Inter-regional transfer limit variation - Eraring500kV - Kemps Creek 5A2 500kV Line - NSW region - 19/07/2025
At 1910 hrs 19/07/2025 there was a short notice outage of Eraring 500kV - Kemps Creek 5A2 500kV Line .
The following constraint set(s) invoked at 1920 hrs 19/07/2025
N-ERKC_ONE
This constraint set(s) contains equations with the following interconnectors on the LHS.
N-Q-MNSP1,NSW1-QLD1,VIC1-NSW1
Refer to the AEMO Network Outage Scheduler for further information.
Manager NEM Real Time Operations
Inter-regional transfer limit variation - Bulgana-Horsham 220kV LINE - VIC region - 19/07/2025
Inter-regional transfer limit variation - Bulgana-Horsham 220kV LINE - VIC region - 19/07/2025
A planned outage of Bulgana-Horsham 220kV LINE in the VIC region was scheduled from 0700 hrs 19/07/2025 to 1730 hrs 19/07/2025.
The outage has been completed and Bulgana-Horsham 220kV LINE returned to service at 1525 hrs 19/07/2025
Constraint set(s) revoked: V-BUHO
Manager NEM Real Time Operations
Non-credible contingency event - TAS region - 19/07/2025
Non-credible contingency event - TAS region - 19/07/2025
At 1240 hrs the Liapoota - Wadamana - Palmerston 220 kV line and the Cattle Hill Wind Farm - Wadamana 220 kV line tripped.
AEMO did not instruct load shedding.
AEMO has been advised of a 70 MW load reduction at Nyrstar.
The cause of this non credible contingency event is not known at this stage.
Manager NEM Real Time Operations
Cancellation - AEMO Intervention Event - SA region 18/07/2025
Cancellation - AEMO Intervention Event - SA region 18/07/2025
Refer to Market Notice 128167
The AEMO Intervention Event and all associated directions are cancelled from 1430 hrs on 19/07/2025.
Manager NEM Real Time Operations
Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN
Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN
Refer to Market Notice 128166
Direction is cancelled from: 1430 hrs 19/07/2025
Manager NEM Real Time Operations
Direction - SA region 18/07/2025
Direction - SA region 18/07/2025
In accordance with section 116 of the National Electricity Law, AEMO has issued a direction to a participant in the SA region. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a1)(1).
The issue of the direction commences an AEMO intervention event. AEMO declares all trading intervals during the event to be intervention trading intervals, commencing from the interval ending 1435 hrs on 18/07/2025.
Intervention pricing does not apply to this AEMO intervention event.
AEMO may issue or revoke additional directions in order to meet the current requirement, unless sufficient market response is provided. A further market notice will be issued when all directions related to this requirement have been cancelled.
Manager NEM Real Time Operations