Update to system strength requirements in North Queensland
Refer to market notice 76008
AEMO and Powerlink are continuing to investigate system strength requirements in North Queensland. A revision to the requirements will be implemented at 1400 hrs today.
The following new combination will be implemented:
7 - 2 x Stanwell, 1 x Callide B, 1 x Callide C, 3 x Gladstone, 8 x Total Stanwell+Callide+Gladstone, 0 or 1 x Kareeya, > 450 MW Nth Qld load, > 250 MW Ross + FNQ load: 80% output at Clare, Collinsville, Daydream, Hamilton, Hayman, Kidston, Ross, Rugby Run, Whitsunday
8 - 2 x Stanwell, 1 x Callide B, 1 x Callide C, 3 x Gladstone, 7 x Total Stanwell+Callide+Gladstone, 2 x Kareeya: 100% output at Clare, Collinsville, Daydream, Hamilton, Hayman, Kidston, Ross, Rugby Run, Whitsunday
9 - 3 x Stanwell, 1 x Callide B, 1 x Callide C, 3 x Gladstone, 10 x Total Stanwell+Callide+Gladstone, 0 x Kareeya, > 450 MW Nth Qld load, > 250 MW Ross + FNQ load: 100% output at Clare, Collinsville, Daydream, Hamilton, Hayman, Kidston, Ross, Rugby Run, Whitsunday
For all the above combinations Haughton, Sun Metals and Mt Emerald WF are limited to 0 MW and 0 inverters.
If these combinations are not met Clare, Collinsville, Daydream, Hamilton, Hayman, Kidston, Ross, Rugby Run, Whitsunday generators have a limit of 0 MW and 0 inverters.
The constraint equations are:
Q_NIL_STRGTH_CLRSF, Q_NIL_STRGTH_CLRSF_I
Q_NIL_STRGTH_COLSF, Q_NIL_STRGTH_COLSF_I
Q_NIL_STRGTH_DAYSF, Q_NIL_STRGTH_DAYSF_I
Q_NIL_STRGTH_HAMSF, Q_NIL_STRGTH_HAMSF_I
Q_NIL_STRGTH_HAYSF, Q_NIL_STRGTH_HAYSF_I
Q_NIL_STRGTH_KIDSF, Q_NIL_STRGTH_KIDSF_I
Q_NIL_STRGTH_RGBSF, Q_NIL_STRGTH_RGBSF_I
Q_NIL_STRGTH_RRSF, Q_NIL_STRGTH_RRSF_I
Q_NIL_STRGTH_WHTSF, Q_NIL_STRGTH_WHTSF_I
For further details please contact James Lindley at james.lindley@aemo.com.au or Simon Taylor at businessdevelopment@powerlink.com.au
Ben Blake
AEMO Operations
Update to system strength requirements in North Queensland
Refer to market notice 75482
AEMO and Powerlink are continuing to investigate system strength requirements in North Queensland. A revision to the requirements will be implemented at 1100hrs today.
Combination 6 has been revised and is now:
3 x Stanwell, 2 x Callide B + C, 3 x Gladstone, 9 x Total Stanwell+Callide+Gladstone, 4 x Kareeya: 50% output for Sun Metals and Haughton and 65% output for Mt Emerald WF
If these combinations are not met all three generators have a limit of 0 MW and 0 inverters.
The constraint equations are: Q_NIL_STRGTH_MEWF, Q_NIL_STRGTH_HAUSF, Q_NIL_STRGTH_SMSF.
For further details please contact James Lindley at james.lindley@aemo.com.au or Simon Taylor at businessdevelopment@powerlink.com.au
Mya San
AEMO Operations
New system normal constraint equation in Victoria for voltage collapse on trip of Ballarat - Waubra - Ararat line
In the event of a trip of the Ballarat - Waubra - Ararat 220 kV line the Ararat, Crowlands, Bulgana, Murra Warra and Waubra wind farms will be tripped off. AEMO has completed work on a revised voltage collapse limit for this contingency which will replace the existing 600 MW cap on these generators. FCAS constraint equations have also been developed for this contingency.
The energy constraint equation includes generators in south-west NSW and north-west Victoria on the left-hand side as well as VIC1-NSW1.
The following constraint equations will be implemented at 1000 hrs Monday 25th May 2020.
N^^V_NIL_ARWBBA
F_I+GFT_TG_R6
F_I+GFT_TG_R60
F_I+GFT_TG_R5
F_MAIN++GFT_TG_R6
F_MAIN++GFT_TG_R60
F_MAIN++GFT_TG_R5
F_MAIN+GFT_TG_R6
F_MAIN+GFT_TG_R60
F_MAIN+GFT_TG_R5
The following constraint equation will be removed:
V^V_NIL_ARWBBA
For further details on these new constraint equations please contact ben.blake@aemo.com.au
Ben Blake
AEMO Operations
New system normal constraint equation in NSW for voltage collapse at Darlington Point
Following advice from TransGrid a new/revised system normal constraint equation
TransGrid has advised AEMO of a new voltage collapse limit in southern NSW. The voltage collapse occurs at Darlington Point on loss of the Darlington Point to Wagga (63) 330 kV line. The limit is for pre-contingent flow on 63 line. The constraint equation includes generators in south-west NSW and north-west Victoria on the left-hand side as well as Murraylink.
The following constraint equation will be implemented at 1000 hrs Monday 11th May 2020:
N^^N_NIL_2
For further details on this new constraint equation please contact ben.blake@aemo.com.au
Ben Blake
AEMO Operations
Update to system strength requirements in North Queensland
Refer to market notice 75226
AEMO and Powerlink are continuing to investigate system strength requirements in North Queensland. A revision to the requirements will be implemented at 1400 hrs today.
The revised minimum generator combinations and limits are:
1 - 3 x Stanwell, 1 x Callide B, 1 x Callide C, 3 x Gladstone, 10 x Total Stanwell+Callide+Gladstone, 4 x Kareeya, 2 x Barron Gorge: 100% output
2 - 3 x Stanwell, 1 x Callide B, 1 x Callide C, 3 x Gladstone, 10 x Total Stanwell+Callide+Gladstone, 4 x Kareeya, 1 x Barron Gorge: 80% output
3 - 3 x Stanwell, 1 x Callide B, 1 x Callide C, 3 x Gladstone, 10 x Total Stanwell+Callide+Gladstone, 2 x Kareeya, 1 x Townsville GT: 80% output
4 - 3 x Stanwell, 1 x Callide B, 1 x Callide C, 3 x Gladstone, 10 x Total Stanwell+Callide+Gladstone, 2 x Kareeya, 1 x Barron Gorge: 70% output
4H - 3 x Stanwell, 1 x Callide B, 1 x Callide C, 3 x Gladstone, 10 x Total Stanwell+Callide+Gladstone, 2 x Kareeya, 1 x Barron Gorge, 50% or less output at Mt Emerald: 100% output for Haughton solar farm
5 - 3 x Stanwell, 1 x Callide B, 1 x Callide C, 3 x Gladstone, 10 x Total Stanwell+Callide+Gladstone, 4 x Kareeya: 70% output
The following new combination will also be implemented:
6- 3 x Stanwell, 2 x Callide C, 3 x Gladstone, 9 x Total Stanwell+Callide+Gladstone, 4 x Kareeya: 20% output
If these combinations are not met, Mt Emerald WF, Sun metals SF and Haughton SF have a limit of 0 MW and 0 inverters.
The constraint equations are: Q_NIL_STRGTH_MEWF, Q_NIL_STRGTH_HAUSF, Q_NIL_STRGTH_SMSF.
For further details please contact James Lindley at james.lindley@aemo.com.au or Simon Taylor at businessdevelopment@powerlink.com.au
Mya San
AEMO Operations
Update to system strength requirements in North Queensland
Refer to market notice 74987
AEMO and Powerlink are continuing to investigate system strength requirements in North Queensland. A revision to the requirements will be implemented at 1300 hrs today.
The revised minimum generator combinations and limits are:
1 - 3 x Stanwell, 1 x Callide B, 1 x Callide C, 3 x Gladstone, 10 x Total Stanwell+Callide+Gladstone, 4 x Kareeya, 2 x Barron Gorge: 100% output
2 - 3 x Stanwell, 1 x Callide B, 1 x Callide C, 3 x Gladstone, 10 x Total Stanwell+Callide+Gladstone, 4 x Kareeya, 1 x Barron Gorge: 80% output
3 - 3 x Stanwell, 1 x Callide B, 1 x Callide C, 3 x Gladstone, 10 x Total Stanwell+Callide+Gladstone, 2 x Kareeya, 1 x Townsville GT: 80% output
4 - 3 x Stanwell, 1 x Callide B, 1 x Callide C, 3 x Gladstone, 10 x Total Stanwell+Callide+Gladstone, 2 x Kareeya, 1 x Barron Gorge: 70% output
5 - 3 x Stanwell, 1 x Callide B, 1 x Callide C, 3 x Gladstone, 10 x Total Stanwell+Callide+Gladstone, 4 x Kareeya: 70% output
The following new combination will also be implemented:
4H - 3 x Stanwell, 1 x Callide B, 1 x Callide C, 3 x Gladstone, 10 x Total Stanwell+Callide+Gladstone, 2 x Kareeya, 1 x Barron Gorge, 50% or less output at Mt Emerald: 100% output for Haughton solar farm. This new limit takes into account the current physical limitation on generation from Sun Metals Solar Farm.
If these combinations are not met all three generators have a limit of 0 MW and 0 inverters.
The constraint equations are: Q_NIL_STRGTH_MEWF, Q_NIL_STRGTH_HAUSF, Q_NIL_STRGTH_SMSF.
For further details please contact James Lindley at james.lindley@aemo.com.au or Simon Taylor at businessdevelopment@powerlink.com.au
Ben Blake
AEMO Operations
Revised System Strength limits in North Queensland
AEMO and Powerlink are continuing to investigate system strength requirements in North Queensland.
Through this work, AEMO and Powerlink have identified the need, depending on power system conditions, to constrain the output of three generators in North Queensland to maintain power system security.
The constraint equation is expected to limit generation from the three generators depending on power system conditions. The generators are Mt Emerald Wind Farm, Haughton Solar Farm and Sun Metals Solar Farm.
The constraint equations are: Q_NIL_STRGTH_MEWF, Q_NIL_STRGTH_HAUSF, Q_NIL_STRGTH_SMSF. These will be implemented at 1500hrs EST today.
The minimum generator combinations and limits are:
1 - 3 x Stanwell, 1 x Callide B, 1 x Callide C, 4 x Gladstone, 10 x Total Stanwell+Callide+Gladstone, 4 x Kareeya, 2 x Barron Gorge: 100% output
2 - 3 x Stanwell, 1 x Callide B, 1 x Callide C, 4 x Gladstone, 10 x Total Stanwell+Callide+Gladstone, 4 x Kareeya, 1 x Barron Gorge: 80% output
3 - 3 x Stanwell, 1 x Callide B, 1 x Callide C, 4 x Gladstone, 10 x Total Stanwell+Callide+Gladstone, 2 x Kareeya, 1 x Townsville GT: 80% output
4 - 3 x Stanwell, 1 x Callide B, 1 x Callide C, 4 x Gladstone, 10 x Total Stanwell+Callide+Gladstone, 2 x Kareeya, 1 x Barron Gorge: 70% output
5 - 3 x Stanwell, 1 x Callide B, 1 x Callide C, 4 x Gladstone, 10 x Total Stanwell+Callide+Gladstone, 4 x Kareeya: 70% output
If these combinations are not met all three generators have a limit of 0 MW and 0 inverters.
For further details please contact James Lindley at james.lindley@aemo.com.au or Simon Taylor at businessdevelopment@powerlink.com.au
Ben Blake
AEMO Operations
Increase in Heywood from SA to Vic limit from 500 to 550 MW
As a part of the Heywood Interconnector upgrade the increase in the upper transfer limit from SA to Victoria is dependent on the commissioning of the over frequency generation scheme (OFGS). The OFGS has now been commissioned AEMO has completed and detailed analysis of power system limits at higher transfers.
AEMO will increase the Heywood limit from SA to Vic (from the current 500 MW) to 550 MW and the combined (Heywood and Murraylink) SA to Vic limit from 650 to 700 MW at 1000 hrs on 18 Dec 2019.
The following constraint sets will be revoked:
I-SV_500_TEST
I-SVS_650_TEST
The following constraint sets will be invoked:
I-SV_550_TEST
I-SVS_700_TEST
For more information on the increase:
ElectraNet 2019 APR: https://www.electranet.com.au/what-we-do/network/regulated-network-reports-and-studies/
Inter-network test program: https://www.aemo.com.au/media/Files/Electricity/Consultations/2015/HYTS%20interconnector%20upgrade%20internetwork.pdf
Ben Blake
AEMO Operations
Reclassification of QNI SPAR as a credible contingency
After 25th August 2018 AEMO reclassified the loss of NSW to Qld (QNI) interconnected as a credible contingency when lightning is nearby (as per SO_OP_3715 section 11.4). The limits on QNI under this reclassification are based on the available FCAS in Queensland and NSW - normally the limit is between 300-400 MW in either direction.
Following an investigation TransGrid and Powerlink have made setting changes to the auto reclose settings on QNI and provided AEMO with a new reclassification limit on QNI. Now under similar conditions to 25th August the tripped single phases on QNI would reclose and NSW and Qld is not expected to separate.
The new limit of 850 MW will be activated at 1400 hrs November 15th 2018 for use in future reclassifications of QNI for a single phase fault on both circuits.
Constraint Set:
I-QNI_ONE_PHASE_N-2
Ben Blake