Market Notices

113361RESERVE NOTICE17/01/2024 03:02:41 PM

STPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 19/01/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 113279 is cancelled at 1400 hrs 17/01/2024.

No LOR condition is currently forecast in the STPASA period.

AEMO Operations
113359RESERVE NOTICE17/01/2024 01:18:48 PM

PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 18/01/2024

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following Period:

[1.] From 1730 hrs 18/01/2024 to 2000 hrs 18/01/2024.
The forecast capacity reserve requirement is 1247 MW.
The minimum capacity reserve available is 968 MW.

Manager NEM Real Time Operations
113324RESERVE NOTICE16/01/2024 03:04:47 PM

STPASA - Update to the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 19/01/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 113279 has been updated at 1400 hrs 16/01/2024 to the following:

From 1830 hrs to 1900 hrs 19/01/2024.
The forecast capacity reserve requirement is 1180 MW.
The minimum capacity reserve available is 1040 MW.

AEMO Operations
113280RESERVE NOTICE15/01/2024 02:54:52 PM

STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 22/01/2024

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following period:

From 1830 hrs to 1900 hrs 22/01/2024.
The forecast capacity reserve requirement is 1242 MW.
The minimum capacity reserve available is 1109 MW.

AEMO Operations
113279RESERVE NOTICE15/01/2024 02:55:56 PM

STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 19/01/2024

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following period:

From 1830 hrs to 1900 hrs 19/01/2024.
The forecast capacity reserve requirement is 1253 MW.
The minimum capacity reserve available is 1161 MW.

AEMO Operations
113278RESERVE NOTICE15/01/2024 02:56:51 PM

STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 18/01/2024

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following period:

From 1730 hrs to 2030 hrs 18/01/2024.
The forecast capacity reserve requirement is 1247 MW.
The minimum capacity reserve available is 985 MW.

AEMO Operations
113207SETTLEMENTS RESIDUE11/01/2024 01:00:27 PM

[EventId:202401111300_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 11 January 2024 13:00

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1300 hrs on 11 January 2024

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 11 January 2024.

Refer to market notice: 113205

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.

The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1300 hrs on 11 January 2024.

This is an AEMO autogenerated Market Notice.
113205SETTLEMENTS RESIDUE11/01/2024 12:05:20 PM

[EventId:202401111205_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 11 January 2024 12:05

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1205 hrs on 11 January 2024

ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 11 January 2024.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.

The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1205 hrs on 11 January 2024.

This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
113201INTER-REGIONAL TRANSFER11/01/2024 10:08:48 AM

Inter-regional transfer limit variation - South East CB6611 - SA region - 11/01/2024

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - South East CB6611 - SA region - 11/01/2024

At 0955 hrs 11/01/2024 there was an short notice outage of South East CB6611.

The following constraint set(s) invoked at 0955 hrs 11/01/2024
S-SECB6611_10

This constraint set(s) contains equations with the following interconnectors on the LHS.
V-SA

Refer to the AEMO Network Outage Scheduler for further information.