Cancellation of Actual (LOR1) condition in the Vic region - 29/11/2017
Cancellation of Actual (LOR1) condition in the Vic region - 29/11/2017
The Actual LOR1 Condition in the Vic Region advised in AEMO Electricity Market Notice No.60096 is cancelled at 1740 hrs 29/11/2017.
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 1 (LOR1) in the Vic Region.- 29/11/2017
An Actual LOR1 condition has been declared for the Vic Region from 1645 hrs 29/11/2017.
The Actual LOR1 condition is forecast to exist until 1730 hrs.
The contingency capacity reserve required is 1154 MW
The minimum reserve available is 1109 MW
Manager NEM Real Time Operations
Cancellation of Actual (LOR1) condition in the Vic region - 21/11/2017
Cancellation of Actual (LOR1) condition in the Vic region - 21/11/2017
The Actual LOR1 Condition in the Vic Region advised in AEMO Electricity Market Notice No.59963 is cancelled at 1730 hrs 21/11/2017.
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 1 (LOR1) in the Vic Region.- 21/11/2017
Actual Lack Of Reserve Level 1 (LOR1) in the Vic Region.- 21/11/2017
An Actual LOR1 condition has been declared for the Vic Region from 1600 hrs.
The Actual LOR1 condition is forecast to exist until 1700 hrs
The contingency capacity reserve required is 1154 MW
The minimum reserve available is 1109 MW
Manager NEM Real Time Operations
Constraint invoked to manage power system security in SA region
Refer to market notices 58785
Constraint Invocation to manage power system security in SA Region
In order to maintain sufficient fault levels in SA and hence a secure operating state, the following constraint set was invoked at 1500hrs which operates in both Dispatch and Pre-Dispatch:
S_WIND_1200_AUTO
This constraint equation automates the process of applying the 1200 MW limit on the wind farms. If there is enough synchronous generation online it will be "swamped" out by adding 10000 to the right-hand side, otherwise the 1200 MW limit will be applied.
Ben Blake
AEMO Operations
Actual Lack Of Reserve Level 1 (LOR1) in the South Australia Region.- 20/03/2017
Actual Lack Of Reserve Level 1 (LOR1) in the South Australia Region.- 20/03/2017
An Actual LOR1 condition has been declared for the South Australia Region from 1255 hrs.
The Actual LOR1 condition is forecast to exist until 1700 hrs
The contingency capacity reserve required is 440 MW
The minimum reserve available is 250MW
Manager NEM Real Time Operations
Cancellation of Actual (LOR1) condition in the South Australia region - 03/03/2017
Cancellation of Actual (LOR1) condition in the South Australia region - 03/03/2017
The Actual LOR1 Condition in the South Australia Region advised in AEMO Electricity Market Notice No. 57820 is cancelled at 1835 hrs 03/03/2017
Manager NEM Real Time Operations
Cancellation of Actual (LOR2) condition in the South Australia region - 03/03/2017
Cancellation of Actual (LOR2) condition in the South Australia region - 03/03/2017
The Actual LOR2 Condition in the South Australia Region advised in AEMO Electricity Market Notice No. 57818 & 57819 is cancelled at 1730 hrs 03/03/2017
An Actual LOR1 condition exists and is forecast to exist until 1830 hrs.
The contingency capacity reserve required is 450 MW
The minimum reserve available is 281 MW
AEMO is seeking a market response.
Manager NEM Real Time Operations
Cancellation of Actual (LOR1) condition in the South Australia region - 01/03/2017
Cancellation of Actual (LOR1) condition in the South Australia region - 01/03/2017
The Actual LOR1 Condition in the South Australia Region advised in AEMO Electricity Market Notice No. 57769 is cancelled at 1825 hrs 01/03/2017
Manager NEM Real Time Operations