60097RESERVE NOTICE29/11/2017 05:49:08 PM

Cancellation of Actual (LOR1) condition in the Vic region - 29/11/2017

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR1) condition in the Vic region - 29/11/2017

The Actual LOR1 Condition in the Vic Region advised in AEMO Electricity Market Notice No.60096 is cancelled at 1740 hrs 29/11/2017.

Manager NEM Real Time Operations
60096RESERVE NOTICE29/11/2017 04:55:05 PM

Actual Lack Of Reserve Level 1 (LOR1) in the Vic Region.- 29/11/2017

AEMO ELECTRICITY MARKET NOTICE

An Actual LOR1 condition has been declared for the Vic Region from 1645 hrs 29/11/2017.

The Actual LOR1 condition is forecast to exist until 1730 hrs.

The contingency capacity reserve required is 1154 MW

The minimum reserve available is 1109 MW


Manager NEM Real Time Operations






59965RESERVE NOTICE21/11/2017 05:40:27 PM

Cancellation of Actual (LOR1) condition in the Vic region - 21/11/2017

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR1) condition in the Vic region - 21/11/2017

The Actual LOR1 Condition in the Vic Region advised in AEMO Electricity Market Notice No.59963 is cancelled at 1730 hrs 21/11/2017.


Manager NEM Real Time Operations
59963RESERVE NOTICE21/11/2017 04:21:26 PM

Actual Lack Of Reserve Level 1 (LOR1) in the Vic Region.- 21/11/2017

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the Vic Region.- 21/11/2017

An Actual LOR1 condition has been declared for the Vic Region from 1600 hrs.

The Actual LOR1 condition is forecast to exist until 1700 hrs

The contingency capacity reserve required is 1154 MW

The minimum reserve available is 1109 MW


Manager NEM Real Time Operations






58845CONSTRAINTS19/07/2017 05:03:02 PM

Constraint invoked to manage power system security in SA region

AEMO ELECTRICITY MARKET NOTICE

Refer to market notices 58785

Constraint Invocation to manage power system security in SA Region

In order to maintain sufficient fault levels in SA and hence a secure operating state, the following constraint set was invoked at 1500hrs which operates in both Dispatch and Pre-Dispatch:
S_WIND_1200_AUTO

This constraint equation automates the process of applying the 1200 MW limit on the wind farms. If there is enough synchronous generation online it will be "swamped" out by adding 10000 to the right-hand side, otherwise the 1200 MW limit will be applied.

Ben Blake
AEMO Operations
58148RESERVE NOTICE20/03/2017 01:00:22 PM

Actual Lack Of Reserve Level 1 (LOR1) in the South Australia Region.- 20/03/2017

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the South Australia Region.- 20/03/2017
An Actual LOR1 condition has been declared for the South Australia Region from 1255 hrs.
The Actual LOR1 condition is forecast to exist until 1700 hrs
The contingency capacity reserve required is 440 MW
The minimum reserve available is 250MW

Manager NEM Real Time Operations
57821RESERVE NOTICE03/03/2017 06:36:31 PM

Cancellation of Actual (LOR1) condition in the South Australia region - 03/03/2017

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR1) condition in the South Australia region - 03/03/2017

The Actual LOR1 Condition in the South Australia Region advised in AEMO Electricity Market Notice No. 57820 is cancelled at 1835 hrs 03/03/2017

Manager NEM Real Time Operations
57820RESERVE NOTICE03/03/2017 05:52:07 PM

Cancellation of Actual (LOR2) condition in the South Australia region - 03/03/2017

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR2) condition in the South Australia region - 03/03/2017

The Actual LOR2 Condition in the South Australia Region advised in AEMO Electricity Market Notice No. 57818 & 57819 is cancelled at 1730 hrs 03/03/2017

An Actual LOR1 condition exists and is forecast to exist until 1830 hrs.
The contingency capacity reserve required is 450 MW
The minimum reserve available is 281 MW
AEMO is seeking a market response.

Manager NEM Real Time Operations
57779RESERVE NOTICE01/03/2017 06:54:52 PM

Cancellation of Actual (LOR1) condition in the South Australia region - 01/03/2017

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR1) condition in the South Australia region - 01/03/2017

The Actual LOR1 Condition in the South Australia Region advised in AEMO Electricity Market Notice No. 57769 is cancelled at 1825 hrs 01/03/2017