Market Notices

113929MARKET INTERVENTION28/01/2024 05:57:11 PM

Cancellation - AEMO Intervention Event - Intervention trading intervals - Direction SA region 24/01/2024

AEMO ELECTRICITY MARKET NOTICE

Cancellation - AEMO Intervention Event - Intervention trading intervals - Direction SA region 24/01/2024

Refer Market Notice 113710

The AEMO Intervention Event and all associated directions are cancelled from 1800 hrs 28/01/2024

Manager NEM Real Time Operations
113925MARKET INTERVENTION28/01/2024 04:09:24 PM

Possible intervention to manage power system security in SA Region

AEMO ELECTRICITY MARKET NOTICE

Possible intervention to manage power system security in SA Region

The synchronous generating units currently expected to be synchronised in SA from 0800 hrs 29/01/2024 will be inadequate to maintain a secure operating state in SA.

AEMO estimates that, in the absence of sufficient market response by 1700 hrs 28/01/2024, AEMO may need to intervene by issuing a direction requiring one or more SA synchronous generating unit(s) to operate or remain synchronised to maintain power system security in SA.


Manager NEM Real Time Operations
113888SETTLEMENTS RESIDUE27/01/2024 07:20:18 PM

[EventId:202401271920_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 27 January 2024 19:20

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1920 hrs on 27 January 2024

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 27 January 2024.

Refer to market notice: 113879

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.

The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1920 hrs on 27 January 2024.

This is an AEMO autogenerated Market Notice.
113879SETTLEMENTS RESIDUE27/01/2024 06:06:28 PM

[EventId:202401271805_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 27 January 2024 18:05

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1805 hrs on 27 January 2024

ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 27 January 2024.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.

The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1805 hrs on 27 January 2024.

This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
113870MARKET INTERVENTION27/01/2024 08:55:08 PM

Cancellation - AEMO Intervention Event - Intervention trading intervals - Direction QLD region 27/01/2024

AEMO ELECTRICITY MARKET NOTICE

Cancellation - AEMO Intervention Event - Intervention trading intervals - Direction QLD region 27/01/2024

Refer Market Notice 113839

The AEMO Intervention Event and all associated directions are cancelled from 2100 hrs 27/01/2024

Manager NEM Real Time Operations
113867MARKET INTERVENTION27/01/2024 05:01:19 PM

Update - Direction - SA Region - 24/01/2024

AEMO ELECTRICITY MARKET NOTICE

Update - Direction - SA Region - 24/01/2024

Refer Market Notice 113710

The AEMO intervention event that commenced from interval ending 1635 hrs on 24/01/2024 is continuing.

AEMO may issue or revoke additional directions in order to meet the current requirement, unless sufficient market response is provided. A further market notice will be issued when all directions related to this requirement have been cancelled.

Manager NEM Real Time Operations
113846MARKET INTERVENTION27/01/2024 12:41:49 PM

INTENTION TO IMPLEMENT an AEMO INTERVENTION EVENT WITH RERT

AEMO ELECTRICITY MARKET NOTICE.

AEMO Intervention Event, Reliability and Emergency Reserve Trader (RERT) - QLD1 Region - 27/01/2024

Refer to AEMO Electricity Market Notice no. 113841.
AEMO has entered into a reserve contract and may implement a AEMO Intervention Event by dispatching that reserve contract to maintain the power system in a Reliable operating state during the following period of time;
17:30 to 21:00 hrs 27/01/2024
If reserve is required, the period of activation or dispatch will be within this period, but may not be for all the entire period.
AEMO will issue a further advice if the reserve contract is dispatched/activated.


Manager NEM Real Time Operations
113843SETTLEMENTS RESIDUE27/01/2024 12:00:27 PM

[EventId:202401271200_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 27 January 2024 12:00

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1200 hrs on 27 January 2024

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 27 January 2024.

Refer to market notice: 113832

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.

The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1200 hrs on 27 January 2024.

This is an AEMO autogenerated Market Notice.
113841MARKET INTERVENTION27/01/2024 11:49:38 AM

INTENTION TO COMMENCE RERT CONTRACT NEGOTIATIONS

AEMO ELECTRICITY MARKET NOTICE.
Reliability and Emergency Reserve Trader (RERT) Intention to negotiate for additional reserve - QLD1 Region- 27/01/2024

Refer to AEMO Electricity Market Notice no. 113840.
AEMO intends to commence negotiations with RERT Panel members for the provision of additional reserve by issuing requests for tender for the following period of time;
17:30 to 21:00 hrs 27/01/2024
If reserve is required, the period of activation or dispatch will be within this period but may not be for the entire period.
AEMO will issue a further advice if reserve is contracted.


Manager NEM Real Time Operations