Protected event advice - South Australia region.
AEMO has identified that the conditions of the following protected event will be met from the time specified in this notice.
Protected event: the loss of multiple transmission elements causing generation disconnection in the South Australia region during periods where destructive wind conditions are forecast by the Bureau of Meteorology.
Duration: 07/06/2023 1230 hrs until further notice
AEMO will take action to manage the power system for the impact of the protected event.
Constraint set invoked: I-VS_250
Manager NEM Real Time Operations
Update - PDPASA - Cancellation of the Actual Lack Of Reserve Level 2 (LOR2) in the NSW Region on 25/05/2023
The Actual LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 108160 is cancelled at 2045 hrs 25/05/2023.
Manager NEM Real Time Operations
PDPASA - Cancellation of the Actual Lack Of Reserve Level 2 (LOR2) in the NSW Region on 25/05/2023
The Actual LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 108160 is cancelled at 2145 hrs 25/05/2023.
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 2 (LOR2) in the NSW Region on 25/05/2023
Actual Lack Of Reserve Level 2 (LOR2) in the NSW region - 25/05/2023
An Actual LOR2 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the NSW region from 2000 hrs.
The Actual LOR2 condition is forecast to exist until 2030 hrs.
The forecast capacity reserve requirement is 851 MW.
The minimum capacity reserve available is 767 MW.
AEMO is seeking an immediate market response.
An insufficient market response may require AEMO to implement an AEMO intervention event.
Manager NEM Real Time Operations
Tasmanian Regulation FCAS changes - Wednesday 5th April 2023
AEMO are changing the procurement of Regulation FCAS for the TAS region.
This change is based on advice received from TasNetworks, following a review of operation of the TAS region with the end of the reclassification of Basslink.
Refer to AEMO Electricity market notice 105443.
Following this change Regulation FCAS requirements for the TAS region will only be procured from within TAS.
This change will be implemented from 1000 on Wed 5th April.
Ben Blake
Manager Congestion & Grid Modelling
Update to Victorian system normal constraint equations ID
AEMO has been conducting major review of thermal constraint equations for preparation of completion of VNI East project. As part of the review, AEMO is going to update the constraint equations IDs to use the new standard format of below (this is the same standard now used in NSW):
V>>[OUTAGE]_[MONITORING ELEMENT]_[CONTINGENCY ELEMENT]
This is to improve the simplicity and readability of a thermal constraint equation ID.
Constraint equations ID in sets V-NIL and V-NIL_BATS_BETS_15M will be updated to the new format on Thursday 23rd March 2023 at 1000 hrs. The previous used constraint equations ID will be included in the Modification field of the constraint equation for reference.
The changes have now been implemented into AEMO's pre-production system.
Terry Liu
AEMO Operations
Cancellation of Actual (LOR2) condition in the NSW region - 16/03/2023
Cancellation of Actual (LOR2) condition in the NSW region - 16/03/2023
The Actual LOR2 Condition in the NSW Region advised in AEMO Electricity Market Notice No.106716 is cancelled at 1855hrs 16/03/2023
Manager NEM Real Time Operations
Cancellation of Actual (LOR2) condition in the QLD region - 16/03/2023
Cancellation of Actual (LOR2) condition in the QLD region - 16/03/2023
The Actual LOR2 Condition in the QLD Region advised in AEMO Electricity Market Notice No.106719 is cancelled at 1855hrs 16/03/2023
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 2 (LOR2) in the QLD Region on 16/03/2023
Actual Lack Of Reserve Level 2 (LOR2) in the QLD region - 16/03/2023
An Actual LOR2 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the QLD region from 1730 hrs.
The Actual LOR2 condition is forecast to exist until 1800 hrs.
The forecast capacity reserve requirement is 560 MW.
The minimum capacity reserve available is 531 MW.
AEMO is seeking an immediate market response.
An insufficient market response may require AEMO to implement an AEMO intervention event.
Manager NEM Real Time Operations