Filter by category
Filter by Date
[EventId:202405150700_confirmed] Prices for interval 15-May-2024 07:00 are now confirmed
Issued by Australian Energy Market Operator Ltd at 0700 hrs on 15 May 2024
PRICES ARE NOW CONFIRMED for trading interval 15-May-2024 07:00.
In accordance with Market Notice 116623 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202405150655_confirmed] Prices for interval 15-May-2024 06:55 are now confirmed
Issued by Australian Energy Market Operator Ltd at 0700 hrs on 15 May 2024
PRICES ARE NOW CONFIRMED for trading interval 15-May-2024 06:55.
In accordance with Market Notice 116622 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202405150650_confirmed] Prices for interval 15-May-2024 06:50 are now confirmed
Issued by Australian Energy Market Operator Ltd at 0700 hrs on 15 May 2024
PRICES ARE NOW CONFIRMED for trading interval 15-May-2024 06:50.
In accordance with Market Notice 116621 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202405150645_confirmed] Prices for interval 15-May-2024 06:45 are now confirmed
Issued by Australian Energy Market Operator Ltd at 0700 hrs on 15 May 2024
PRICES ARE NOW CONFIRMED for trading interval 15-May-2024 06:45.
In accordance with Market Notice 116620 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202405150635_confirmed] Prices for interval 15-May-2024 06:35 are now confirmed
Issued by Australian Energy Market Operator Ltd at 0700 hrs on 15 May 2024
PRICES ARE NOW CONFIRMED for trading interval 15-May-2024 06:35.
In accordance with Market Notice 116618 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
Cancellation of Actual (LOR1) condition in the Qld Region - 14/05/2024
Cancellation of Actual (LOR1) condition in the Qld region - 14/05/2024
The Actual LOR1 Condition in the Qld Region advised in AEMO Electricity Market Notice No.116615 is cancelled at 1815 hrs 14/05/2024.
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 1 (LOR1) in the QLD Region on 14/05/2024
Actual Lack Of Reserve Level 1 (LOR1) in the QLD region - 14/05/2024
An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the QLD region from 1730 hrs.
The Actual LOR1 condition is forecast to exist until 1800 hrs.
The forecast capacity reserve requirement is 830 MW.
The minimum capacity reserve available is 727 MW.
Manager NEM Real Time Operations
Cancellation: Reclassification of non-credible contingency event due to existence of widespread abnormal condition - NEM regions.
AEMO considers the occurrence of a non-credible contingency event due to the widespread abnormal conditions advised in AEMO Electricity Market Notice 116572 is no longer reasonably possible and accordingly its classification has reverted to non-credible.
Cancellation time: 1115 hrs 13/05/2024.
Manager NEM Real Time Operations
Cancellation of a Non-Credible Contingency Event: Armidale - Dumaresq 8C 330kV line and Armidale - Sapphire WF 8E 330kV line in NSW1 due to Lightning.
Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.
Region: NSW1
Lines: Armidale - Dumaresq 8C 330kV and Armidale - Sapphire WF 8E 330kV
Cancellation time: 12/05/2024 10:54
Constraint set(s) revoked:
N-ARDM_ARSR_1PH_N-2 Constraint set contains the following interconnector(s) on the left hand side:
N-Q-MNSP1
NSW1-QLD1
Refer AEMO Electricity Market Notice 116593
Auto-generated on behalf of Manager NEM Real Time Operations